TN Identifies Two Road Corridors For Parandur Airport Link
AVIATION & AIRPORTS

TN Identifies Two Road Corridors For Parandur Airport Link

The Tamil Nadu government has begun preparatory works to firm up road connectivity to the proposed Parandur Greenfield Airport by identifying two priority corridors to link the aviation hub with Chennai and adjacent key industrial belts. The proposals are to be placed before the chief secretary for appraisal.

The first project involves widening Pallur-Sogandi Road over a total length of 23.8-kilometre and developing a 60-metre right of way that includes a nine point two-kilometre rerouted stretch skirting the airport boundary. The corridor is proposed as a four-lane carriageway with service roads on either side and a section of State Highway 58 between the expressway interchange and the Pallur-Sogandi Road is also slated for widening to manage traffic.

The second corridor is a new greenfield link from the Oragadam-Cheyyar Industrial Corridor (OCIC) to the airport, a 30.7-kilometre route from Singaperumal Koil to Parandur via State Highway 58, the Chennai Peripheral Ring Road and the Mannivakkam-OCIC stretch. The plan envisages a four-lane carriageway with grade-separated entry and exit ramps at key intersections. State planners examined three connectivity options and chose two to be taken forward while a third option linking the Pallur-Sogandi junction on the Bengaluru-Chennai Expressway to NH 48 was shelved.

Land acquisition norms are expected to vary along the corridors, with a 45-metre right of way proposed up to Neeralur on NH 48 and 30 metres beyond that point until the airport entry. Officials recommended that Detailed Project Reports for both corridors be taken up immediately and that the industries department fund DPR preparation and land acquisition to ensure road access keeps pace with airport development and supports surrounding industrial belts.

The Tamil Nadu government has begun preparatory works to firm up road connectivity to the proposed Parandur Greenfield Airport by identifying two priority corridors to link the aviation hub with Chennai and adjacent key industrial belts. The proposals are to be placed before the chief secretary for appraisal. The first project involves widening Pallur-Sogandi Road over a total length of 23.8-kilometre and developing a 60-metre right of way that includes a nine point two-kilometre rerouted stretch skirting the airport boundary. The corridor is proposed as a four-lane carriageway with service roads on either side and a section of State Highway 58 between the expressway interchange and the Pallur-Sogandi Road is also slated for widening to manage traffic. The second corridor is a new greenfield link from the Oragadam-Cheyyar Industrial Corridor (OCIC) to the airport, a 30.7-kilometre route from Singaperumal Koil to Parandur via State Highway 58, the Chennai Peripheral Ring Road and the Mannivakkam-OCIC stretch. The plan envisages a four-lane carriageway with grade-separated entry and exit ramps at key intersections. State planners examined three connectivity options and chose two to be taken forward while a third option linking the Pallur-Sogandi junction on the Bengaluru-Chennai Expressway to NH 48 was shelved. Land acquisition norms are expected to vary along the corridors, with a 45-metre right of way proposed up to Neeralur on NH 48 and 30 metres beyond that point until the airport entry. Officials recommended that Detailed Project Reports for both corridors be taken up immediately and that the industries department fund DPR preparation and land acquisition to ensure road access keeps pace with airport development and supports surrounding industrial belts.

Next Story
Infrastructure Urban

Jyoti Structures FY26 profit rises 56.5%

Jyoti Structures (JSL) recently reported strong financial results for the quarter and year ended 31 March 2026, driven by disciplined execution, cost management and steady progress across its order book.For Q4 FY2025-26, total income rose 44.2 per cent to Rs 2.41 billion from Rs 1.67 billion in Q4 FY2024-25. EBITDA increased 58.6 per cent to Rs 237 million, while EBITDA margin improved by 89 basis points to 9.84 per cent. Profit before tax grew 53.3 per cent to Rs 188.5 million, and net profit rose 51.9 per cent to Rs 181.4 million.For FY2025-26, total income grew 53.1 per cent to Rs 7.72 bill..

Next Story
Infrastructure Energy

Cat BEPU to Power Doppstadt Separator at IFAT 2026

Caterpillar’s Cat Battery Electric Power Unit (BEPU) has been selected by Doppstadt to power its SWS 6 Spiral Shaft Separator, which will be showcased for the first time at IFAT 2026 in Munich, Germany, from 4–7 May.The compact plug-and-play BEPU is designed to replace a diesel engine within the same space, using the same mounting locations and relative machine position. It integrates the battery, motor, inverter, onboard charging, cooling and controls, enabling OEMs to electrify existing chassis platforms without extensive redesign.Caterpillar and Cat dealer Zeppelin Power Systems have be..

Next Story
Infrastructure Urban

VECV sales rise 6.9% in April 2026

VE Commercial Vehicles, a joint venture between Volvo Group and Eicher Motors, recorded sales of 7,318 units in April 2026, compared to 6,846 units in April 2025, registering 6.9 per cent growth. The total included 7,159 units under the Eicher brand and 159 units under the Volvo brand.Eicher branded trucks and buses reported sales of 7,159 units during the month, up 6.6 per cent from 6,717 units in April 2025. In the domestic commercial vehicle market, Eicher sales rose 8.6 per cent to 6,797 units from 6,257 units a year earlier.Exports declined 21.3 per cent, with VECV recording 362 units in ..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement