+
Army Builds Bailey Bridge to Restore Uttarkashi Link
ROADS & HIGHWAYS

Army Builds Bailey Bridge to Restore Uttarkashi Link

The Indian Army, working in close coordination with the civil administration, has completed the construction of a Bailey bridge in Limchigad, Uttarkashi, restoring connectivity after the original structure was swept away during the August 5 cloudburst in Dharali.
Following the destruction of the bridge, transportation in the region came to a standstill, prompting urgent restoration measures. Teams from the police, State Disaster Response Force (SDRF), engineers, and other rescue units, along with the Indian Army’s engineering wing from the Bengal Engineers Group (BEG), worked tirelessly despite heavy rainfall to complete the task. Search, medical, and communication teams also joined the effort, culminating in the completion of the 90-foot Bailey bridge at 5 pm on Sunday.
The Border Roads Organisation (BRO) and Army engineers jointly undertook the construction. Situated on the Gangotri National Highway, the new bridge spans the Limchigad between Gangnani and Dharali, with a load capacity of nearly 50 tonnes, significantly improving relief and rescue operations in the challenging Himalayan terrain.
Uttarakhand Chief Minister Pushkar Singh Dhami, in a statement on X, said, “The construction work of the Bailey Bridge at Limchigad has been completed, and the bridge has been opened for traffic. Now, through this bridge, not only are relief materials and machinery being sent forward quickly, but the movement of local people has also resumed smoothly. In this difficult time of disaster, our government is working with full commitment to normalise public life.”
Authorities are also working to clear blockages along the highway at Songad, Dabrani, Harsil, and Dharali. However, continuous heavy rain is hampering helicopter evacuations of stranded individuals. Since evacuation operations began on Wednesday, 1,273 people have been airlifted from Dharali and Harsil by Sunday evening. 

The Indian Army, working in close coordination with the civil administration, has completed the construction of a Bailey bridge in Limchigad, Uttarkashi, restoring connectivity after the original structure was swept away during the August 5 cloudburst in Dharali.Following the destruction of the bridge, transportation in the region came to a standstill, prompting urgent restoration measures. Teams from the police, State Disaster Response Force (SDRF), engineers, and other rescue units, along with the Indian Army’s engineering wing from the Bengal Engineers Group (BEG), worked tirelessly despite heavy rainfall to complete the task. Search, medical, and communication teams also joined the effort, culminating in the completion of the 90-foot Bailey bridge at 5 pm on Sunday.The Border Roads Organisation (BRO) and Army engineers jointly undertook the construction. Situated on the Gangotri National Highway, the new bridge spans the Limchigad between Gangnani and Dharali, with a load capacity of nearly 50 tonnes, significantly improving relief and rescue operations in the challenging Himalayan terrain.Uttarakhand Chief Minister Pushkar Singh Dhami, in a statement on X, said, “The construction work of the Bailey Bridge at Limchigad has been completed, and the bridge has been opened for traffic. Now, through this bridge, not only are relief materials and machinery being sent forward quickly, but the movement of local people has also resumed smoothly. In this difficult time of disaster, our government is working with full commitment to normalise public life.”Authorities are also working to clear blockages along the highway at Songad, Dabrani, Harsil, and Dharali. However, continuous heavy rain is hampering helicopter evacuations of stranded individuals. Since evacuation operations began on Wednesday, 1,273 people have been airlifted from Dharali and Harsil by Sunday evening. 

Next Story
Resources

Haworth India Hosts Women’s Leadership Panel Series

Haworth India marked International Women’s Day by hosting a leadership roundtable series titled ‘Give to Gain’, bringing together senior women leaders from architecture and design firms, corporates and project management consultancies. The series has been conducted in Delhi and Mumbai, with upcoming sessions scheduled in Bengaluru and Hyderabad on 27 March 2026. Structured as moderated panel discussions followed by audience interaction, the initiative examined the business impact of women’s leadership and the role of inclusive workplaces in supporting professional growth. Manish Khan..

Next Story
Real Estate

Max Estates Secures RERA For Max One Project

Max Estates has secured RERA approval (UPRERA No.: UPRERAPRJ9759) for its Max One development around Max Towers in Sector 16B, Noida, bringing renewed progress to a project previously stalled following the insolvency of its earlier developer. Spread across around 10 acres with an estimated development potential of about 2.5 million sq ft, Max One is planned as an integrated mixed-use campus combining serviced residences, premium offices, retail spaces and a private club. The project is expected to generate total sales potential of about Rs 20 billion along with an estimated annuity rental inc..

Next Story
Real Estate

Hindware Introduces Starc Smart Wall Mount Toilet

Hindware has introduced the Starc Smart Wall-Mount Toilet under its Hindware Italian Collection, designed to combine automation, hygiene and contemporary bathroom aesthetics. The model features automatic flushing, sensor-based seat opening and closing, and remote-controlled functions. It also includes an oscillating water spray and warm air dryer for cleaning, along with a self-cleaning nozzle designed to maintain hygiene. Additional features include adjustable heated seating, customisable water temperature and pressure settings, a foot-touch flush system and an LCD control interface. The wa..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement