Chennai Peripheral Ring Road Nears 2025 Completion
ROADS & HIGHWAYS

Chennai Peripheral Ring Road Nears 2025 Completion

Spanning 132.87 kilometres, the Chennai Peripheral Ring Road (CPRR) is set to transform regional connectivity across Tamil Nadu. The six-lane, access-controlled expressway will link Ennore Port to Mahabalipuram, joining several key national highways. With an estimated cost of Rs 123 billion, the project is scheduled for completion by the end of 2025. The Tamil Nadu Road Development Company (TNRDC) is overseeing its implementation.

The CPRR will pass through seven major urban areas including Singaperumalkoil, Sriperumbudur, Tiruvallur, Tamaraipakkam, Periyapalayam, Puduvoyal, and Kattupalli. Once operational, it will connect to NH5 (Chennai–Tada), NH4 (Chennai–Bengaluru), NH45 (Chennai–Tiruchirappalli), and the East Coast Road (ECR), significantly enhancing road mobility across the region.

In addition to its main lanes, the expressway will feature service roads for local traffic to ensure seamless vehicular movement. According to a Magicbricks report, the CPRR will also directly connect Ennore and Kattupalli ports, strengthening logistics access.

The CPRR will be integrated with major National Highways Authority of India (NHAI) corridors such as the Bengaluru–Chennai and Chittoor–Thatchur expressways. Designed for speeds of up to 120 kilometres per hour, the route will include an Intelligent Transport System (ITS) to enhance road safety and traffic management.

Meanwhile, Indian Railways plans to launch the Amrit Bharat Express service between Howrah and Chennai in the 2025–26 financial year. This special train will travel via Visakhapatnam, covering the 1,662-kilometre journey in under 26 hours. Operating twice weekly, the service will offer a maximum speed of 130 km/h, further improving intercity travel between eastern and southern India.


Spanning 132.87 kilometres, the Chennai Peripheral Ring Road (CPRR) is set to transform regional connectivity across Tamil Nadu. The six-lane, access-controlled expressway will link Ennore Port to Mahabalipuram, joining several key national highways. With an estimated cost of Rs 123 billion, the project is scheduled for completion by the end of 2025. The Tamil Nadu Road Development Company (TNRDC) is overseeing its implementation.The CPRR will pass through seven major urban areas including Singaperumalkoil, Sriperumbudur, Tiruvallur, Tamaraipakkam, Periyapalayam, Puduvoyal, and Kattupalli. Once operational, it will connect to NH5 (Chennai–Tada), NH4 (Chennai–Bengaluru), NH45 (Chennai–Tiruchirappalli), and the East Coast Road (ECR), significantly enhancing road mobility across the region.In addition to its main lanes, the expressway will feature service roads for local traffic to ensure seamless vehicular movement. According to a Magicbricks report, the CPRR will also directly connect Ennore and Kattupalli ports, strengthening logistics access.The CPRR will be integrated with major National Highways Authority of India (NHAI) corridors such as the Bengaluru–Chennai and Chittoor–Thatchur expressways. Designed for speeds of up to 120 kilometres per hour, the route will include an Intelligent Transport System (ITS) to enhance road safety and traffic management.Meanwhile, Indian Railways plans to launch the Amrit Bharat Express service between Howrah and Chennai in the 2025–26 financial year. This special train will travel via Visakhapatnam, covering the 1,662-kilometre journey in under 26 hours. Operating twice weekly, the service will offer a maximum speed of 130 km/h, further improving intercity travel between eastern and southern India.

Next Story
Infrastructure Transport

MMRDA advances 250 m on Orange Gate–Marine Drive tunnel

The Mumbai Metropolitan Region Development Authority (MMRDA) has completed 250 m of underground tunnelling for the Orange Gate–Marine Drive Urban Road Tunnel using India’s largest slurry shield tunnel boring machine (TBM) deployed for an urban road project.The project involves twin tunnels extending over 7 km beneath critical transport corridors, including Central Railway, Western Railway and Metro Line 3. The work requires high-precision engineering to navigate densely developed urban infrastructure.Once completed, the tunnel is expected to reduce travel time between Orange Gate and Marin..

Next Story
Infrastructure Urban

Hindustan Zinc Pays Rs 188.46 Billion in FY26

Hindustan Zinc contributed Rs 188.46 billion to the public exchequer in FY 2025-26, according to its 9th Tax Transparency Report. The contribution, equivalent to 46 per cent of the company’s revenue, included direct and indirect taxes, government royalties, dividends to the Government of India, withholding taxes and other statutory levies.The company’s five-year cumulative contribution to the exchequer stood at Rs 915.72 billion. In FY26, Hindustan Zinc reported revenue of Rs 408.44 billion, EBITDA of Rs 221.62 billion and profit after tax of Rs 138.32 billion. It also achieved its highest..

Next Story
Infrastructure Urban

World of Concrete India 2026 Opens in Mumbai

Informa Markets in India will host the 12th edition of World of Concrete India 2026 from 3–5 June 2026 at the Bombay Exhibition Centre, Mumbai. The specialised B2B exhibition will bring together manufacturers, suppliers, contractors, developers, architects, consultants, infrastructure companies, project leaders and government stakeholders.The event is expected to feature over 350 brands and more than 18,000 trade professionals. It will cover concrete and cement, dry mortar, precast technologies, formwork, construction chemicals, industrial and commercial flooring, scaffolding, safety solutio..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement