DCM Shriram Starts New Caustic Soda Flakes Plant in Gujarat
ROADS & HIGHWAYS

DCM Shriram Starts New Caustic Soda Flakes Plant in Gujarat

Shriram has expanded its chemical production capacity by commissioning a new caustic soda flakes plant with a daily production capacity of 300 tonnes at its chemicals complex in Jhagadia, Bharuch district, Gujarat. This addition increases the total caustic soda flakes production capacity at the Bharuch facility to 900 tonnes per day, positioning it among the largest single-location caustic soda flakes manufacturing units in India.

The newly commissioned plant is identical to the unit that began operations in October of the previous year. Designed as a flexi-fuel facility, both plants are capable of operating on multiple fuel sources, enhancing sustainability and operational efficiency.

Caustic soda, or sodium hydroxide, is a widely used industrial chemical with applications in several industries, including textiles, pulp and paper, alumina, soaps and detergents, petroleum refining, and water treatment. It is available in two primary forms—liquid (lye) and solid (flakes). Caustic soda flakes are particularly advantageous for long-distance transportation and are preferred for export due to their ease of handling and storage.

With an installed capacity of one million tonnes per annum, the company ranks as the second-largest producer of caustic soda in India. The expansion of its production capabilities reinforces its position in the industry and strengthens its ability to meet domestic and international demand.

News source: The Week

Shriram has expanded its chemical production capacity by commissioning a new caustic soda flakes plant with a daily production capacity of 300 tonnes at its chemicals complex in Jhagadia, Bharuch district, Gujarat. This addition increases the total caustic soda flakes production capacity at the Bharuch facility to 900 tonnes per day, positioning it among the largest single-location caustic soda flakes manufacturing units in India. The newly commissioned plant is identical to the unit that began operations in October of the previous year. Designed as a flexi-fuel facility, both plants are capable of operating on multiple fuel sources, enhancing sustainability and operational efficiency. Caustic soda, or sodium hydroxide, is a widely used industrial chemical with applications in several industries, including textiles, pulp and paper, alumina, soaps and detergents, petroleum refining, and water treatment. It is available in two primary forms—liquid (lye) and solid (flakes). Caustic soda flakes are particularly advantageous for long-distance transportation and are preferred for export due to their ease of handling and storage. With an installed capacity of one million tonnes per annum, the company ranks as the second-largest producer of caustic soda in India. The expansion of its production capabilities reinforces its position in the industry and strengthens its ability to meet domestic and international demand. News source: The Week

Next Story
Infrastructure Transport

Ixigo Launches Delhi Metro Ticketing on Its Trains App

Online travel aggregator (OTA) ixigo has partnered with the Delhi Metro Rail Corporation (DMRC) and the Open Network for Digital Commerce (ONDC) to launch Delhi Metro ticketing on the ixigo Trains app on 12 September.As part of the collaboration, ixigo Trains now offers QR-based metro tickets with in-app payments. Users can plan and book end-to-end journeys across trains, buses, flights, hotels and now metro services on a single platform.The DMRC operates nearly 400 km of network across more than a dozen lines, making it India’s largest and busiest metro system. In August 2025, it recorded i..

Next Story
Infrastructure Transport

Mumbai’s Metro Line 3 Nears Completion After Safety Inspection

Mumbai’s first fully underground metro line, Mumbai Metro Line 3, has moved closer to becoming fully operational as the Commissioner of Metro Railway Safety (CMRS) initiated the inspection of the last section of the Aqua Line, spanning from Worli to Cuffe Parade, on 12 September.Once this section receives safety clearance from CMRS, the entire Mumbai Metro Line 3 will be opened for passengers. According to officials, the inspection report is expected to be finalised by next week, after which the commission will conduct a final verification. Once the remaining 10.99 km stretch is approved, pa..

Next Story
Infrastructure Transport

MIA Construction Wins Rs 680 Million Delhi Metro Phase 4 Contract

MIA Construction has received a Letter of Acceptance (LoA) worth Rs 680 million from Delhi Metro Rail Corporation (DMRC) for the architectural finishing contract of Delhi Metro Phase 4’s Golden Line (Line 10). The Golden Line spans 23.622 km between Aerocity and Tughlakabad and includes 15 stations.DMRC invited bids for the contract with a 450-day deadline. Technical bids were opened on 25 June 2025, with 10 firms submitting proposals. The technical evaluation took place on 29 August 2025, during which the bids of three firms were rejected.The financial bids were opened on 29 August 2025, an..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?