+
Gadkari reviews Amritsar-Jamnagar, Delhi-Mumbai NH stretches
ROADS & HIGHWAYS

Gadkari reviews Amritsar-Jamnagar, Delhi-Mumbai NH stretches

Union Road Transport Minister Nitin Gadkari, concerned about the numerous complaints regarding the poor maintenance of national highways during the monsoon, has directed his ministry to conduct a comprehensive investigation of both the Sohna-Vadodara stretch of the Delhi-Mumbai Expressway and the Amritsar-Jamnagar Expressway. He has instructed the Central Road Research Institute (CRRI) to carry out this investigation as soon as possible.

In a separate directive, Gadkari has also ordered the ministry to examine the maintenance issues of the Eastern Peripheral Expressway (EPE), which serves as a bypass for Delhi. He referenced his recent experience traveling on the 135-km expressway during a plantation drive.

Gadkari has emphasized the need to hold those responsible accountable and called for the strictest action against them. Sources mentioned that the minister is actively pursuing investigations into such cases, especially after recent incidents.

Just days before the plantation event, reports surfaced of a section of the Delhi-Mumbai Expressway collapsing in Rajasthan, as well as a large pothole on the newly built Amritsar-Jamnagar Economic Corridor. In response, the National Highways Authority of India (NHAI) imposed a Rs 5 million fine on the contractor for failing to address the defects in a timely manner, and two engineers from the Authority Engineer (AE) were dismissed for inadequate supervision and lapses. Similar action was taken against contractors, engineers, and officials involved in the Sohna-Mumbai Expressway.

During the plantation event, Gadkari issued a warning that negligence and poor maintenance of highways would not be tolerated and that both domestic and foreign contractors responsible would be blacklisted.

Union Road Transport Minister Nitin Gadkari, concerned about the numerous complaints regarding the poor maintenance of national highways during the monsoon, has directed his ministry to conduct a comprehensive investigation of both the Sohna-Vadodara stretch of the Delhi-Mumbai Expressway and the Amritsar-Jamnagar Expressway. He has instructed the Central Road Research Institute (CRRI) to carry out this investigation as soon as possible. In a separate directive, Gadkari has also ordered the ministry to examine the maintenance issues of the Eastern Peripheral Expressway (EPE), which serves as a bypass for Delhi. He referenced his recent experience traveling on the 135-km expressway during a plantation drive. Gadkari has emphasized the need to hold those responsible accountable and called for the strictest action against them. Sources mentioned that the minister is actively pursuing investigations into such cases, especially after recent incidents. Just days before the plantation event, reports surfaced of a section of the Delhi-Mumbai Expressway collapsing in Rajasthan, as well as a large pothole on the newly built Amritsar-Jamnagar Economic Corridor. In response, the National Highways Authority of India (NHAI) imposed a Rs 5 million fine on the contractor for failing to address the defects in a timely manner, and two engineers from the Authority Engineer (AE) were dismissed for inadequate supervision and lapses. Similar action was taken against contractors, engineers, and officials involved in the Sohna-Mumbai Expressway. During the plantation event, Gadkari issued a warning that negligence and poor maintenance of highways would not be tolerated and that both domestic and foreign contractors responsible would be blacklisted.

Next Story
Infrastructure Transport

Lucknow Metro East-West Corridor Consultancy Contract Awarded

The Uttar Pradesh Metro Rail Corporation has awarded the first construction-related consultancy contract for the Lucknow Metro East West Corridor to a joint venture of AYESA Ingenieria Arquitectura SAU and AYESA India Pvt Ltd. The firm was declared the lowest bidder for the Detailed Design Consultant contract for Lucknow Metro Line-2 under Phase 1B and the contract was recommended following the financial bid. The contract is valued at Rs 159.0 million (mn), covering design services for the corridor. Lucknow Metro Line-2 envisages the construction of an 11.165 kilometre corridor connecting Cha..

Next Story
Infrastructure Urban

Div Com Kashmir Urges Fast Tracking Of Jhelum Water Transport Project

The Divisional Commissioner of Kashmir has called for the fast-tracking of the Jhelum water transport project, urging district administrations and relevant agencies to accelerate planning and clearances. In a meeting convened at the divisional headquarters, the commissioner instructed officials from irrigation, public health engineering and municipal departments to prioritise the project and coordinate survey and design work. The directive emphasised removal of administrative bottlenecks and close monitoring to ensure timely mobilisation of resources and contractors. Officials were told to in..

Next Story
Infrastructure Urban

Interarch Reports Strong Q3 And Nine Month Results

Interarch Building Solutions Limited reported unaudited results for the third quarter and nine months ended 31 December 2025, recording strong revenue growth driven by execution and a robust order book. Net revenue for the third quarter rose by 43.7 per cent to Rs 5.225 billion (bn), compared with Rs 3.636 bn a year earlier, reflecting heightened demand in pre-engineered building projects. The company’s total order book as at 31 January 2026 stood at Rs 16.85 bn, supporting near-term visibility. EBITDA excluding other income for the quarter increased by 43.2 per cent to Rs 503 million (mn),..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Open In App