MSRDC in final stage to implement HTMS for Mumbai-Pune Expressway
ROADS & HIGHWAYS

MSRDC in final stage to implement HTMS for Mumbai-Pune Expressway

The Maharashtra State Road Development Corporation (MSRDC) is nearing the final stages of implementing the Highway Traffic Management System (HTMS) on the Pune-Mumbai Expressway to streamline traffic and enhance safety. This initiative includes deploying systems for speed detection and lane discipline violation, enabling enforcement of speed limits and penalties for offenders.

"By the end of this month, we will have installed 430 advanced CCTV cameras as part of the HTMS," stated a senior MSRDC official. "These cameras will facilitate spot and average speed detection, lane discipline monitoring, weigh-in-motion systems for commercial vehicles, and automatic vehicle counting and classification at toll booths. This comprehensive system will enable swift action against reckless driving, which often leads to traffic disruptions and accidents."

The official further mentioned that installation of cameras is complete, with on-going testing expected to conclude by the end of June. Once testing is finalised, the system will become operational, significantly bolstering safety measures on the expressway.

The Mumbai-Pune Expressway, known for its winding stretches through picturesque landscapes including ghats and waterfalls, often sees vehicles stopping haphazardly on roadsides for scenic views, leading to accidents. To address this issue, MSRDC has proposed designated stopping facilities at intervals along the expressway. Special halts are planned in the ghats specifically for heavy vehicles, aiming to reduce incidents where they currently stop abruptly after ascending the ghats, causing collisions with trailing vehicles.

Additionally, MSRDC is set to operationalise the Missing Link project on the expressway by May 2025, aimed at bridging critical gaps in the road network between Mumbai and Pune to ensure seamless connectivity.

The section of the expressway from Adoshi Tunnel to Khandala exit, currently a six-lane road accommodates traffic equivalent to ten lanes (six from YCEW and four from NH-4). It faces congestion due to heavy traffic and occasional landslides. This jam prompts vehicles to speed up on other parts of the expressway, contributing to increased accidents. A feasibility study has proposed an alternative route for the ghat section to mitigate these challenges.

(Source: Free Press Journal)

The Maharashtra State Road Development Corporation (MSRDC) is nearing the final stages of implementing the Highway Traffic Management System (HTMS) on the Pune-Mumbai Expressway to streamline traffic and enhance safety. This initiative includes deploying systems for speed detection and lane discipline violation, enabling enforcement of speed limits and penalties for offenders. By the end of this month, we will have installed 430 advanced CCTV cameras as part of the HTMS, stated a senior MSRDC official. These cameras will facilitate spot and average speed detection, lane discipline monitoring, weigh-in-motion systems for commercial vehicles, and automatic vehicle counting and classification at toll booths. This comprehensive system will enable swift action against reckless driving, which often leads to traffic disruptions and accidents. The official further mentioned that installation of cameras is complete, with on-going testing expected to conclude by the end of June. Once testing is finalised, the system will become operational, significantly bolstering safety measures on the expressway. The Mumbai-Pune Expressway, known for its winding stretches through picturesque landscapes including ghats and waterfalls, often sees vehicles stopping haphazardly on roadsides for scenic views, leading to accidents. To address this issue, MSRDC has proposed designated stopping facilities at intervals along the expressway. Special halts are planned in the ghats specifically for heavy vehicles, aiming to reduce incidents where they currently stop abruptly after ascending the ghats, causing collisions with trailing vehicles. Additionally, MSRDC is set to operationalise the Missing Link project on the expressway by May 2025, aimed at bridging critical gaps in the road network between Mumbai and Pune to ensure seamless connectivity. The section of the expressway from Adoshi Tunnel to Khandala exit, currently a six-lane road accommodates traffic equivalent to ten lanes (six from YCEW and four from NH-4). It faces congestion due to heavy traffic and occasional landslides. This jam prompts vehicles to speed up on other parts of the expressway, contributing to increased accidents. A feasibility study has proposed an alternative route for the ghat section to mitigate these challenges. (Source: Free Press Journal)

Next Story
Infrastructure Transport

Shivraj Chouhan Launches PMGSY IV and Announces Package for Madhya Pradesh

Union Minister Shivraj Singh Chouhan launched the Pradhan Mantri Gram Sadak Yojana (PMGSY) IV at Bhairunda in Sehore district during the 25 year celebrations and announced a development package for Madhya Pradesh. The programme was organised by the Union Ministry of Rural Development and attended by Chief Minister Dr Mohan Yadav, ministers of state, state ministers, legislators and senior officials from the centre and the state. The minister said the central government under the Prime Minister is committed to strengthening rural livelihoods through improved connectivity, housing and women's in..

Next Story
Infrastructure Urban

DMR Engineering Reports FY 25-26 Financial Results

DMR Engineering reported its half year results for the financial year ended 31 March 2026 and published full year figures on a standalone basis. Standalone revenue from operations decreased by 2.01 per cent year-over-year to Rs 102.58 million (mn), while profit after tax declined by 43.94 per cent to nine point five six mn, leaving a profit after tax margin of nine point zero five per cent. Earnings per share stood at Rs zero point nine two, a fall of 44.71 per cent year-over-year. The company attributed part of the decline to one-off provisioning for bad debts and additional financing charges..

Next Story
Infrastructure Urban

Atlanta Electricals Posts Strong FY26 Growth And Debt Free Finish

Atlanta Electricals reported audited consolidated results for the quarter and year ended 31 March 2026. The company recorded significant year-on-year revenue growth driven by capacity ramp-up at new facilities and higher utilisation at legacy plants. The announcement summarised operating improvements and strategic milestones achieved during the year. For Q4 the company reported revenue of Rs 7.48 bn and for FY26 revenue of Rs 18.52 bn, representing robust growth versus the prior year. EBITDA in Q4 was Rs. 1.49 bn and Rs. 3.44 bn for the full year, with margins expanding to 20 per cent in the q..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement