NHAI Begins Trial Run of Dwarka Expressway Tunnel
ROADS & HIGHWAYS

NHAI Begins Trial Run of Dwarka Expressway Tunnel

The National Highways Authority of India (NHAI) has started a trial run for tunnel and underpasses on the Delhi section of Dwarka Expressway to ease traffic on the Delhi–Gurugram stretch of National Highway 48. The trial runs will be held daily from 12 noon to three pm starting 29 May 2025.

The key facility includes a shallow tunnel linking Dwarka and Yashobhumi with Indira Gandhi International Airport via airport underpasses. Commuters from Terminal Three can also use this route to access Gurugram. Vehicles can also travel from Dwarka to Sirhaul via the shallow tunnel and right-turn underpass.

The trial will allow NHAI to assess traffic behaviour, safety standards, and operational efficiency. The tunnel restricts entry to vehicles under four-point-five metres in height, excluding two-wheelers, three-wheelers, and those transporting flammable materials.

Equipped with emergency exits, CCTV surveillance, and a control room, the tunnel is expected to become fully operational from five June 2025.

This strategic project will improve connectivity between Delhi, Gurugram, and northern cities by reducing surface road congestion and facilitating smoother access to the airport and surrounding areas.

Source:Press Information Bureau

The National Highways Authority of India (NHAI) has started a trial run for tunnel and underpasses on the Delhi section of Dwarka Expressway to ease traffic on the Delhi–Gurugram stretch of National Highway 48. The trial runs will be held daily from 12 noon to three pm starting 29 May 2025.The key facility includes a shallow tunnel linking Dwarka and Yashobhumi with Indira Gandhi International Airport via airport underpasses. Commuters from Terminal Three can also use this route to access Gurugram. Vehicles can also travel from Dwarka to Sirhaul via the shallow tunnel and right-turn underpass.The trial will allow NHAI to assess traffic behaviour, safety standards, and operational efficiency. The tunnel restricts entry to vehicles under four-point-five metres in height, excluding two-wheelers, three-wheelers, and those transporting flammable materials.Equipped with emergency exits, CCTV surveillance, and a control room, the tunnel is expected to become fully operational from five June 2025.This strategic project will improve connectivity between Delhi, Gurugram, and northern cities by reducing surface road congestion and facilitating smoother access to the airport and surrounding areas.Source:Press Information Bureau

Next Story
Infrastructure Urban

ABS Marine Sees CRISIL Credit Rating Upgrade

ABS Marine Services has secured an upgrade to its long term and short term credit ratings from CRISIL, reflecting improved profitability and revenue growth through long term contracts. CRISIL moved the long term rating from BBB+/Stable to A-/Stable and revised the short term rating from A2 to A2+. The action signals strengthened financial metrics and operational resilience. The company benefited from durable client relationships with firms such as ONGC and Schlumberger. The rating decision followed stronger cash flows and an enlarged bank loan facility, which increased from Rs 3,705 million (m..

Next Story
Infrastructure Transport

Project BRAHMANK Marks 16 Years Of Strategic Roads In Arunachal

Project BRAHMANK is marking 16 years of work to establish strategic road and bridge links across Arunachal Pradesh, maintaining and developing 811 kilometres of roads and nearly 86 bridges that range from small culverts to large steel and arch bridges. These transport links are described as critical for ensuring year-round movement of defence personnel, equipment and essential supplies while improving everyday travel for people in remote villages. The project balances national security requirements with regional development by focusing on reliable access in challenging terrain. Notable enginee..

Next Story
Infrastructure Transport

Longleng CSOs Give One Week Ultimatum Over Two-Lane Highway

Civil society organisations (CSOs) in Longleng district have demanded immediate restoration of the deteriorating Changtongya–Longleng two-lane road and sought a detailed status report on the stalled construction within one week. The demand followed a consultative meeting convened under the Phom Peoples' Council (PPC) to discuss welfare and development concerns. PPC president YB Angam Phom said prolonged non-maintenance had caused hardship to commuters and affected transportation, local commerce and the district's development. The meeting urged authorities to undertake immediate restoration a..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement