Steel Slag Roads: Techno-economic and environmental benefits
ROADS & HIGHWAYS

Steel Slag Roads: Techno-economic and environmental benefits

A robust infrastructure network is a prerequisite to accelerating economic growth in any country. As India is poised to become an economic powerhouse, the Government of India has also embarked on a massive infrastructure development programme under the PM Gati Shakti Scheme, National Highway Development Programme and Bharatmala projects. India has the world’s second-largest road network in terms of length. Every year, for the maintenance and construction of this vast road network, around 1.2 billion tonne of natural aggregates are required. This huge demand is met through unsustainable quarrying and mining of stone aggregates in many areas, which is causing a serious ecological impact on natural topography, flora and fauna. Sustainable development requires reduced reliance on perishable natural resources.

India is the world’s second-largest steel-producing country and accounts for the world’s second-largest steel slag generation as solid waste. Most steel slag after metal recovery ends up in the waste dump or as landfill material. The utilisation of steel slag varies from 0 to 50 per cent on a plant-to-plant basis depending upon the course of action taken by steel plants for disposal and utilisation. Under a major research projectsponsored by the Ministry of Steel along with Arcelor Mittal Nippon Steel (AM/NS) India, CSIR-CRRI has developed steel slag valorisation technology for the conversion of steel slag as roadmaking aggregate. Processed steel slag aggregates developed at the AM/NS India steel plant in Hazira have been successfully utilised in the construction of a 1-km,six-lane bituminous steel slag road connecting NH-6 to Hazira Port in Surat, Gujarat.

To read the full interview, CLICK HERE.

A robust infrastructure network is a prerequisite to accelerating economic growth in any country. As India is poised to become an economic powerhouse, the Government of India has also embarked on a massive infrastructure development programme under the PM Gati Shakti Scheme, National Highway Development Programme and Bharatmala projects. India has the world’s second-largest road network in terms of length. Every year, for the maintenance and construction of this vast road network, around 1.2 billion tonne of natural aggregates are required. This huge demand is met through unsustainable quarrying and mining of stone aggregates in many areas, which is causing a serious ecological impact on natural topography, flora and fauna. Sustainable development requires reduced reliance on perishable natural resources. India is the world’s second-largest steel-producing country and accounts for the world’s second-largest steel slag generation as solid waste. Most steel slag after metal recovery ends up in the waste dump or as landfill material. The utilisation of steel slag varies from 0 to 50 per cent on a plant-to-plant basis depending upon the course of action taken by steel plants for disposal and utilisation. Under a major research projectsponsored by the Ministry of Steel along with Arcelor Mittal Nippon Steel (AM/NS) India, CSIR-CRRI has developed steel slag valorisation technology for the conversion of steel slag as roadmaking aggregate. Processed steel slag aggregates developed at the AM/NS India steel plant in Hazira have been successfully utilised in the construction of a 1-km,six-lane bituminous steel slag road connecting NH-6 to Hazira Port in Surat, Gujarat. To read the full interview, CLICK HERE.

Next Story
Infrastructure Transport

L&T-Alstom Partnership to Upgrade Mumbai Metro Line 4

Larsen & Toubro (L&T), in partnership with Alstom Transport, has secured a contract to supply essential systems for Mumbai Metro's 35.2 km Line-4 and Line-4A (Green Line), which will connect Wadala, Kasarvadavali, and Gaimukh. Identified as Package CA-234, the contract includes the supply of 39 six-coach trains, totalling 234 coaches, along with Communication-Based Train Control (CBTC) signalling and train control systems, telecommunications infrastructure, platform screen doors, and depot machinery for the Mogharpada Depot. This project comes after Alstom's previous withdrawal from a similar ..

Next Story
Infrastructure Energy

Jio-bp to Expand Retail Network and EV Charging Infrastructure

Jio-bp, a joint venture between Reliance Industries and global energy major bp, is focused on expanding its retail infrastructure and enhancing customer experience to strengthen its presence in the downstream energy market. The company plans to establish 100,000 electric vehicle (EV) charging stations over the next 10-12 years, aligning with the Indian government's efforts to boost EV charging infrastructure and achieve net zero targets. Additionally, Jio-bp intends to open 1,000 retail outlets to sell compressed biogas (CBG) produced by Reliance's CBG plants. Jio-bp has introduced 480 kW ..

Next Story
Infrastructure Energy

Kolkata Metro to Install Power Backup System on Underground Stretch

Kolkata Metro Railway is set to install a Battery Energy Storage System (BESS) at the Central Station substation to enhance commuter safety during power outages. This system will ensure uninterrupted operations on the 16 km underground Tollygunge-Dumdum stretch of the Blue Line corridor (Dakshineswar-New Garia), which spans 28 km. The BESS, comprising inverters and advanced chemistry cell (ACC) batteries, will enable trains to operate at 30 km/h during power cuts or grid failures, ensuring that passenger-filled coaches can safely reach the nearest station. This initiative aims to improve both..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?