TDR allowed for buildings on internal layout roads
ROADS & HIGHWAYS

TDR allowed for buildings on internal layout roads

A proposal to permit Transfer of Development Rights (TDR) for the redevelopment of ancient buildings that are on internal roads like private layout roads has been accepted by Municipal Commissioner Igbal Chahal, provided that the road is at least 9 metres wide and 50 metres away from a public road.

More crucially, it will be necessary to record a deed that guarantees the private access would be preserved forever.

Even on plots where the minimum width of the private layout road gradually narrows over time, the TDR will be permitted.

Several outdated buildings will be able to be redeveloped, according to real estate industry observers.

Chahal has postponed making a judgement regarding whether to permit TDR for landlocked plots, or plots that are given Right of Way through another property. Following a complaint by the Practising Engineers, Architects, and Town Planners Association, the approval was given.

The BMC Building Proposal department will note the width of all layout/town planning or BMC Estate scheme roads as well as Right of Way to ensure smooth implementation. The approval stipulates that the road must be developed to its full width at first and cannot be shortened in the future before the beginning certificate for any development on such roads will be provided.

"Join industry leaders at RAHSTA Expo, India's premier platform for roads, highways and traffic infrastructure. Register now to explore innovations, network with experts and shape the future of mobility."

A proposal to permit Transfer of Development Rights (TDR) for the redevelopment of ancient buildings that are on internal roads like private layout roads has been accepted by Municipal Commissioner Igbal Chahal, provided that the road is at least 9 metres wide and 50 metres away from a public road. More crucially, it will be necessary to record a deed that guarantees the private access would be preserved forever. Even on plots where the minimum width of the private layout road gradually narrows over time, the TDR will be permitted. Several outdated buildings will be able to be redeveloped, according to real estate industry observers. Chahal has postponed making a judgement regarding whether to permit TDR for landlocked plots, or plots that are given Right of Way through another property. Following a complaint by the Practising Engineers, Architects, and Town Planners Association, the approval was given. The BMC Building Proposal department will note the width of all layout/town planning or BMC Estate scheme roads as well as Right of Way to ensure smooth implementation. The approval stipulates that the road must be developed to its full width at first and cannot be shortened in the future before the beginning certificate for any development on such roads will be provided.

Next Story
Infrastructure Urban

ABS Marine Sees CRISIL Credit Rating Upgrade

ABS Marine Services has secured an upgrade to its long term and short term credit ratings from CRISIL, reflecting improved profitability and revenue growth through long term contracts. CRISIL moved the long term rating from BBB+/Stable to A-/Stable and revised the short term rating from A2 to A2+. The action signals strengthened financial metrics and operational resilience. The company benefited from durable client relationships with firms such as ONGC and Schlumberger. The rating decision followed stronger cash flows and an enlarged bank loan facility, which increased from Rs 3,705 million (m..

Next Story
Infrastructure Transport

Project BRAHMANK Marks 16 Years Of Strategic Roads In Arunachal

Project BRAHMANK is marking 16 years of work to establish strategic road and bridge links across Arunachal Pradesh, maintaining and developing 811 kilometres of roads and nearly 86 bridges that range from small culverts to large steel and arch bridges. These transport links are described as critical for ensuring year-round movement of defence personnel, equipment and essential supplies while improving everyday travel for people in remote villages. The project balances national security requirements with regional development by focusing on reliable access in challenging terrain. Notable enginee..

Next Story
Infrastructure Transport

Longleng CSOs Give One Week Ultimatum Over Two-Lane Highway

Civil society organisations (CSOs) in Longleng district have demanded immediate restoration of the deteriorating Changtongya–Longleng two-lane road and sought a detailed status report on the stalled construction within one week. The demand followed a consultative meeting convened under the Phom Peoples' Council (PPC) to discuss welfare and development concerns. PPC president YB Angam Phom said prolonged non-maintenance had caused hardship to commuters and affected transportation, local commerce and the district's development. The meeting urged authorities to undertake immediate restoration a..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement