Trichy Corp Receives Rs 810.7 Mn for Link Road from Panjapur Terminus
ROADS & HIGHWAYS

Trichy Corp Receives Rs 810.7 Mn for Link Road from Panjapur Terminus

The municipal administration and water supply department have sanctioned a sum of 810.7 million for a section of the new link road project, which will connect the upcoming Integrated Bus Terminus (IBT) at Panjapur with the core city areas.

According to officials from the Trichy corporation, the link road will span 9.8 km, starting from the right bank of the Koraiyar river near the IBT and ending at the right bank of the Kudamurutti river near the police checkpost on the Trichy-Karur national highway. The entire road has been divided into three sections: I, II, and III.

The local body recently received 810.7 million for the construction of Section I, which will cover the stretch between Panjapur and Karumandapam. The funds include both loans and grants under the Sustainable Municipal Infrastructure Finance – Tamil Nadu (SMIF-TN) initiative.

Section I will feature elevated roads for 1.3 km, and a rail overbridge will span 640 meters near Gandhi Nagar. Retaining walls along the river bund will be developed for a length of 2.2 km. The section will also have a 1.2 km footpath and a 1 km-long closed stormwater drain.

A senior official stated that the link road will have two lanes, and funds for Sections I and II have already been secured from various schemes. Funds for Section III, the longest stretch between Karumandapam and Woraiyur, will be obtained soon.

The entire project is estimated to cost around Rs 3.67 billion. Since Section III is expected to require land acquisition, additional funds may be necessary for compensation. While the Trichy corporation initially proposed landscaping and beautification as part of the project, these components have been removed by the state government to reduce the overall cost.

Officials mentioned that elevated stretches with approach roads would be constructed at intersections on the Trichy-Dindigul NH, Vayalur Road, and near the Kuzhumayee Amman temple behind the district collector's office. Work on the project may be inaugurated by Chief Minister M K Stalin during his visit to Trichy in the coming months.

The municipal administration and water supply department have sanctioned a sum of 810.7 million for a section of the new link road project, which will connect the upcoming Integrated Bus Terminus (IBT) at Panjapur with the core city areas. According to officials from the Trichy corporation, the link road will span 9.8 km, starting from the right bank of the Koraiyar river near the IBT and ending at the right bank of the Kudamurutti river near the police checkpost on the Trichy-Karur national highway. The entire road has been divided into three sections: I, II, and III. The local body recently received 810.7 million for the construction of Section I, which will cover the stretch between Panjapur and Karumandapam. The funds include both loans and grants under the Sustainable Municipal Infrastructure Finance – Tamil Nadu (SMIF-TN) initiative. Section I will feature elevated roads for 1.3 km, and a rail overbridge will span 640 meters near Gandhi Nagar. Retaining walls along the river bund will be developed for a length of 2.2 km. The section will also have a 1.2 km footpath and a 1 km-long closed stormwater drain. A senior official stated that the link road will have two lanes, and funds for Sections I and II have already been secured from various schemes. Funds for Section III, the longest stretch between Karumandapam and Woraiyur, will be obtained soon. The entire project is estimated to cost around Rs 3.67 billion. Since Section III is expected to require land acquisition, additional funds may be necessary for compensation. While the Trichy corporation initially proposed landscaping and beautification as part of the project, these components have been removed by the state government to reduce the overall cost. Officials mentioned that elevated stretches with approach roads would be constructed at intersections on the Trichy-Dindigul NH, Vayalur Road, and near the Kuzhumayee Amman temple behind the district collector's office. Work on the project may be inaugurated by Chief Minister M K Stalin during his visit to Trichy in the coming months.

Next Story
Infrastructure Urban

ABS Marine Sees CRISIL Credit Rating Upgrade

ABS Marine Services has secured an upgrade to its long term and short term credit ratings from CRISIL, reflecting improved profitability and revenue growth through long term contracts. CRISIL moved the long term rating from BBB+/Stable to A-/Stable and revised the short term rating from A2 to A2+. The action signals strengthened financial metrics and operational resilience. The company benefited from durable client relationships with firms such as ONGC and Schlumberger. The rating decision followed stronger cash flows and an enlarged bank loan facility, which increased from Rs 3,705 million (m..

Next Story
Infrastructure Transport

Project BRAHMANK Marks 16 Years Of Strategic Roads In Arunachal

Project BRAHMANK is marking 16 years of work to establish strategic road and bridge links across Arunachal Pradesh, maintaining and developing 811 kilometres of roads and nearly 86 bridges that range from small culverts to large steel and arch bridges. These transport links are described as critical for ensuring year-round movement of defence personnel, equipment and essential supplies while improving everyday travel for people in remote villages. The project balances national security requirements with regional development by focusing on reliable access in challenging terrain. Notable enginee..

Next Story
Infrastructure Transport

Longleng CSOs Give One Week Ultimatum Over Two-Lane Highway

Civil society organisations (CSOs) in Longleng district have demanded immediate restoration of the deteriorating Changtongya–Longleng two-lane road and sought a detailed status report on the stalled construction within one week. The demand followed a consultative meeting convened under the Phom Peoples' Council (PPC) to discuss welfare and development concerns. PPC president YB Angam Phom said prolonged non-maintenance had caused hardship to commuters and affected transportation, local commerce and the district's development. The meeting urged authorities to undertake immediate restoration a..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement