Railways insist on third line for RRTS
RAILWAYS & METRO RAIL

Railways insist on third line for RRTS

The fate of the Rapid Rail Transit System (RRTS) proposed for the 125.65-km Thiruvananthapuram-Chengannur stretch hangs in balance with Railways making it clear that the RRTS needs an exclusive line and cannot operate on an upgraded rail network. As per reports, railways have informed the Mumbai Rail Vikas Corporation (MRVC) that a third up-and-down line is needed and operating customised EMU trains along the existing line will hamper the speed and operations of mail and express trains.

The fate of the Rapid Rail Transit System (RRTS) proposed for the 125.65-km Thiruvananthapuram-Chengannur stretch hangs in balance with Railways making it clear that the RRTS needs an exclusive line and cannot operate on an upgraded rail network. As per reports, railways have informed the Mumbai Rail Vikas Corporation (MRVC) that a third up-and-down line is needed and operating customised EMU trains along the existing line will hamper the speed and operations of mail and express trains.

Related Stories

Gold Stories

Hi There!

Now get regular updates from CW Magazine on WhatsApp!

Click on link below, message us with a simple hi, and SAVE our number

You will have subscribed to our Construction News on Whatsapp! Enjoy

+91 81086 03000

Join us Telegram