Bengaluru Railway upgrades with automatic signalling
RAILWAYS & METRO RAIL

Bengaluru Railway upgrades with automatic signalling

The Railway Board has given the green light for the installation of automatic signalling systems along six key railway routes in Bengaluru, at an estimated cost of Rs 874 crore. This decision aims to bolster safety and efficiency in train operations within one of India's busiest railway networks.

The automatic signalling system will replace the current manual signalling methods, which are susceptible to human error and can result in accidents. By automating the signalling process, trains will be able to operate more smoothly and accurately, mitigating the risk of collisions and elevating overall safety standards.

The selection of these six major routes was carefully deliberated, taking into account their importance in the Bengaluru railway network, including factors such as passenger traffic, freight movement, and operational intricacies. The introduction of automatic signalling on these routes is anticipated to streamline operations and minimise delays, thereby enhancing the travel experience for passengers and boosting the reliability of freight transportation.

Moreover, this modernisation initiative aligns with the broader efforts of the Indian government to upgrade and modernise the country's railway infrastructure. By investing in advanced signalling technology, the Railway Board aims to bring Bengaluru's railway system in line with international standards, ensuring safe and efficient transportation for millions of passengers and freight every day.

The approval of the project underscores the government's dedication to prioritising safety and efficiency within the Indian railway sector, which plays a pivotal role in the country's economic development and connectivity. The implementation of automatic signalling along these six major routes marks a significant stride towards modernising Bengaluru's railway network and enhancing the overall transportation infrastructure in the region.

The Railway Board has given the green light for the installation of automatic signalling systems along six key railway routes in Bengaluru, at an estimated cost of Rs 874 crore. This decision aims to bolster safety and efficiency in train operations within one of India's busiest railway networks. The automatic signalling system will replace the current manual signalling methods, which are susceptible to human error and can result in accidents. By automating the signalling process, trains will be able to operate more smoothly and accurately, mitigating the risk of collisions and elevating overall safety standards. The selection of these six major routes was carefully deliberated, taking into account their importance in the Bengaluru railway network, including factors such as passenger traffic, freight movement, and operational intricacies. The introduction of automatic signalling on these routes is anticipated to streamline operations and minimise delays, thereby enhancing the travel experience for passengers and boosting the reliability of freight transportation. Moreover, this modernisation initiative aligns with the broader efforts of the Indian government to upgrade and modernise the country's railway infrastructure. By investing in advanced signalling technology, the Railway Board aims to bring Bengaluru's railway system in line with international standards, ensuring safe and efficient transportation for millions of passengers and freight every day. The approval of the project underscores the government's dedication to prioritising safety and efficiency within the Indian railway sector, which plays a pivotal role in the country's economic development and connectivity. The implementation of automatic signalling along these six major routes marks a significant stride towards modernising Bengaluru's railway network and enhancing the overall transportation infrastructure in the region.

Next Story
Infrastructure Urban

DCPC Prepares for Special Campaign 5.0 with Focus on E-Waste

The Department of Chemicals and Petrochemicals (DCPC), Ministry of Chemicals and Fertilisers, is gearing up for Special Campaign 5.0, to be held from 2nd to 31st October 2025. The initiative will focus on e-waste disposal as per MoEFCC’s E-Waste Management Rules 2022, space optimisation, and enhancing workplace efficiency across field offices.Special Campaign 4.0, conducted between October 2023 and October 2024, delivered notable results in record management, grievance redressal, scrap disposal, and cleanliness drives.Key outcomes of Special Campaign 4.0Records management: 2,443 physical fil..

Next Story
Real Estate

BlackRock India Leases 1.4 Lakh Sq Ft in Bengaluru

BlackRock Services India, the domestic arm of global asset manager BlackRock, has leased 1.4 lakh sq ft of office space at IndiQube Symphony in Bengaluru, according to Propstack data. The 10-year deal is valued at around Rs 4.10 billion.The lease, among the largest transactions in India’s co-working sector, highlights the growing preference of global institutions for flexible office providers. The agreement, commencing October 1, 2025, covers ground plus five floors in KNG Tower 1 at Ashoknagar, MG Road — one of Bengaluru’s prime commercial hubs.As per the lease document, BlackRock will ..

Next Story
Infrastructure Transport

L&T Bags Rs 25–50 Bn Order for Mumbai-Ahmedabad Bullet Train Track Works

Larsen & Toubro’s (L&T) Transportation Infrastructure business has secured an order valued between Rs 25 crore and Rs 50 billion from the National High Speed Rail Corporation Limited (NHSRCL) for the Mumbai-Ahmedabad High Speed Rail (MAHSR) corridor.The contract, Package T1, involves the design, supply, construction, testing, and commissioning of 156 route km of high-speed ballastless track on a Design-Build Lump Sum Price basis. The stretch runs from Mumbai’s Bandra-Kurla Complex to Zaroli village in Gujarat and includes 21 km of underground track and 135 km of elevated viaduct.Se..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?