Chennai Metro phase 2 to feature driverless trains
RAILWAYS & METRO RAIL

Chennai Metro phase 2 to feature driverless trains

According to a Chennai Metro official, driverless trains will be introduced as part of phase II operations. Phase II of the Chennai Metro Rail is moving at great speed. Its primary operating principle will be unattended train operation. The trains will only operate based on information received from signals.

The expansion of Chennai Metro Phase II consists of three corridors:

- Corridor 3 - from Madhavaram to SIPCOT (45.8 km),
- Corridor 4 - from Lighthouse to Poonamalle Bypass (26.1 km),
- Corridor 5 - from Madhavaram to Sholinganallur (47 km).

The estimated cost of the project is Rs 63,246 crore.
“It will be an unattended operation and totally based on signals. There will not be any drivers and this is how it will be right from the start,” said systems and operations director of Chennai Metro Rail, Rajesh Chaturvedi, reports India Today.

He also expressed hope that the Chennai Metro Phase II driverless trains will be operational by 2026. Corridor 4 will be extended to Parandur (50 km), Corridor 5 will be extended to Avadi via Thirumangalam and Mogappair (17 km), and Corridor 3 will be extended from Siruseri to Kilambakkam Bus Terminus via Kelambakkam (26 km). The Metro Rail will be extended from the Chennai airport to Kilambakkam, where a bus terminal will soon be built.

According to a Chennai Metro official, driverless trains will be introduced as part of phase II operations. Phase II of the Chennai Metro Rail is moving at great speed. Its primary operating principle will be unattended train operation. The trains will only operate based on information received from signals. The expansion of Chennai Metro Phase II consists of three corridors: - Corridor 3 - from Madhavaram to SIPCOT (45.8 km), - Corridor 4 - from Lighthouse to Poonamalle Bypass (26.1 km), - Corridor 5 - from Madhavaram to Sholinganallur (47 km). The estimated cost of the project is Rs 63,246 crore. “It will be an unattended operation and totally based on signals. There will not be any drivers and this is how it will be right from the start,” said systems and operations director of Chennai Metro Rail, Rajesh Chaturvedi, reports India Today. He also expressed hope that the Chennai Metro Phase II driverless trains will be operational by 2026. Corridor 4 will be extended to Parandur (50 km), Corridor 5 will be extended to Avadi via Thirumangalam and Mogappair (17 km), and Corridor 3 will be extended from Siruseri to Kilambakkam Bus Terminus via Kelambakkam (26 km). The Metro Rail will be extended from the Chennai airport to Kilambakkam, where a bus terminal will soon be built.

Next Story
Technology

Building Faster, Smarter, and Greener!

Backed by ULCCS’s century-old legacy, U-Sphere combines technology, modular design and sustainable practices to deliver faster and more efficient projects. In an interaction with CW, Rohit Prabhakar, Director - Business Development, shares how the company’s integrated model of ‘Speed-Build’, ‘Smart-Build’ and ‘Sustain-Build’ is redefining construction efficiency, quality and environmental responsibility in India.U-Sphere positions itself at the intersection of speed, sustainability and smart design. How does this translate into measurable efficiency on the ground?At U..

Next Story
Infrastructure Transport

Smart Roads, Smarter India

India’s infrastructure boom is not only about laying more kilometres of highways – it’s about building them smarter, safer and more sustainably. From drones mapping fragile Himalayan slopes to 3D machine-controlled graders reducing human error, technology is steadily reshaping the way projects are planned and executed. Yet, the journey towards digitisation remains complex, demanding not just capital but also coordination, training and vision.Until recently, engineers largely depended on Survey of India toposheets and traditional survey methods like total stations or DGPS to prepare detai..

Next Story
Real Estate

What Does DCPR 2034 Mean?

The Maharashtra government has eased approval norms for high-rise buildings under DCPR 2034, enabling the municipal commissioner to sanction projects up to 180 m on large plots. This change is expected to streamline approvals, reduce procedural delays and accelerate redevelopment, drawing reactions from developers, planners and industry experts about its implications for Mumbai’s vertical growth.Under the revised DCPR 2034 rules, buildings on plots of 2,000 sq m or more can now be approved up to 180 m by the municipal commissioner, provided structural and geotechnical reports are certified b..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?