Electric trains to be available soon for travel to Bengaluru Airport
RAILWAYS & METRO RAIL

Electric trains to be available soon for travel to Bengaluru Airport

Passengers will be able to travel to the halt station near Kempegowda International Airport using Memu trains soon.

The newly electrified Yelahanka-Devanahalli-Chikkaballapur section 45 km was inspected on Saturday by Abhai Kumar Rai, commissioner of railway safety (southern circle).

An South Western Railway (SWR) official told the media that the Commission of Railway Safety (CRS) inspection was completed, as well as a speed trial at the full sectional speed of 100 km per hour.

The route's electrification will primarily benefit airport passengers, as SWR will be able to run Mainline electric multiple units (Memu) trains to and from the halt station. The KSR Bengaluru City-Yelahanka line is already wired.

The Bangalore International Airport Limited (BIAL) built halt station is 3.5 km from the airport terminal and is expected to benefit nearly 28,000 employees and passengers.

The cost of the ticket is between Rs 10-15. However, due to the low frequency of Diesel-electric multiple unit (Demu) services, patronage of these airport-bound trains is low.

Devanahalli-Yelahanka is still a single-track section that needs to be doubled to operate additional trains to and from the KIA halt station.

MEMUs are electric multiple unit (EMU) trains on Indian Railways that serve short and medium-distance routes in India, as opposed to regular EMU trains that connect cities and suburbs. Mainline Electric Multiple Unit is the abbreviation for this term.

Image Source

Also read: Bengaluru airport metro line work to start in 3 months

Passengers will be able to travel to the halt station near Kempegowda International Airport using Memu trains soon. The newly electrified Yelahanka-Devanahalli-Chikkaballapur section 45 km was inspected on Saturday by Abhai Kumar Rai, commissioner of railway safety (southern circle). An South Western Railway (SWR) official told the media that the Commission of Railway Safety (CRS) inspection was completed, as well as a speed trial at the full sectional speed of 100 km per hour. The route's electrification will primarily benefit airport passengers, as SWR will be able to run Mainline electric multiple units (Memu) trains to and from the halt station. The KSR Bengaluru City-Yelahanka line is already wired. The Bangalore International Airport Limited (BIAL) built halt station is 3.5 km from the airport terminal and is expected to benefit nearly 28,000 employees and passengers. The cost of the ticket is between Rs 10-15. However, due to the low frequency of Diesel-electric multiple unit (Demu) services, patronage of these airport-bound trains is low. Devanahalli-Yelahanka is still a single-track section that needs to be doubled to operate additional trains to and from the KIA halt station. MEMUs are electric multiple unit (EMU) trains on Indian Railways that serve short and medium-distance routes in India, as opposed to regular EMU trains that connect cities and suburbs. Mainline Electric Multiple Unit is the abbreviation for this term. Image Source Also read: Bengaluru airport metro line work to start in 3 months

Related Stories

Gold Stories

Next Story
Resources

Schindler named among Forbes’ World’s Best Employers 2026

Schindler has been named among Forbes’ World’s Best Employers 2026, a global ranking recognising companies for their workplace environments.Compiled by Forbes in partnership with Statista, the ranking is based on independent employee feedback, including whether employees would recommend their organisation to friends and family.The company said the recognition reflected its focus on creating a workplace where employees can develop their expertise and build careers. ..

Next Story
Infrastructure Urban

India needs an export-execution mindset: Vishesh Jain

Interview with Vishesh Jain, Founder & CEO, EximpleWhat gaps in India’s global trade ecosystem led you to build Eximple, and what problem did you see businesses struggling with most?Eximple came out of a problem that all three founders had seen from different choke points in the trade ecosystem. India has millions of MSMEs and manufacturers, and many of them can make products that are genuinely competitive on quality. Yet only a small fraction is able to build meaningful international businesses. In our experience, the gap is usually not manufacturing capability; it is the ability to exe..

Next Story
Building Material

Nuvoco reports 13.5% revenue growth in Q2 FY27

Nuvoco Vistas Corp. Ltd. reported consolidated revenue of Rs 27.9 billion for Q2 FY27, up 13.5% year on year. Cement sales volume rose 9% to 4.7 million tonnes (MMT), while EBITDA increased 11% to Rs 4.11 billion.The company said it began its cement operations in 2014 with a 2.3 MMT per annum (MMTPA) operation at Nimbol. It now aims to reach 35 MMTPA of cement capacity by FY28, nearly 15 times its initial capacity. Its portfolio spans cement, ready-mix concrete and modern building materials.On sustainability and cost efficiency, Nuvoco partnered with CleanMax for a 46.4 MW wind-solar hybrid re..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code