+
Kavach Commissioned on Agra-Dholpur Section
RAILWAYS & METRO RAIL

Kavach Commissioned on Agra-Dholpur Section

Indian Railways has commissioned the Kavach automatic train protection system on the 52.5 km Agra Cantt-Dholpur section, extending safety coverage along the high-density Delhi-Bhopal-Mumbai route. The commissioning adds another protected stretch to the railway network and follows the system’s earlier operational deployment between Mathura and Agra Cantt.

The installation is also linked to plans to raise the maximum permitted train speed on the Delhi-Agra corridor from 130 km/h to 160 km/h. The Delhi-Palwal section, however, is still awaiting Kavach commissioning. Trains capable of operating at 160 km/h, including Gatiman Express and Vande Bharat services, have been running at the lower speed on the corridor for about two years under railway operating directions.

A total of 720 radio-frequency identification tags have been installed across the Agra-Dholpur section. These tags are intended to provide train-location and operational information as part of the safety system. The commissioning was overseen by Agra division Divisional Railway Manager Gagan Goyal, while the division’s public relations office described the deployment as part of Indian Railways’ wider efforts to strengthen train protection through indigenous technology.

Kavach is designed to assist locomotive pilots by monitoring train movements and supporting compliance with signalling and speed restrictions. The system can help prevent collisions, overspeeding and accidents linked to signal violations by issuing alerts and triggering safety interventions when required. Its deployment on additional sections is expected to support the gradual expansion of automatic train protection across busy railway routes.

The Agra-Dholpur section forms part of the wider Delhi-Agra rail corridor, where infrastructure and safety upgrades are being implemented to support faster services. Further speed enhancement will depend on the commissioning of Kavach on remaining sections, along with the completion of associated operational and safety requirements.

Indian Railways has commissioned the Kavach automatic train protection system on the 52.5 km Agra Cantt-Dholpur section, extending safety coverage along the high-density Delhi-Bhopal-Mumbai route. The commissioning adds another protected stretch to the railway network and follows the system’s earlier operational deployment between Mathura and Agra Cantt. The installation is also linked to plans to raise the maximum permitted train speed on the Delhi-Agra corridor from 130 km/h to 160 km/h. The Delhi-Palwal section, however, is still awaiting Kavach commissioning. Trains capable of operating at 160 km/h, including Gatiman Express and Vande Bharat services, have been running at the lower speed on the corridor for about two years under railway operating directions. A total of 720 radio-frequency identification tags have been installed across the Agra-Dholpur section. These tags are intended to provide train-location and operational information as part of the safety system. The commissioning was overseen by Agra division Divisional Railway Manager Gagan Goyal, while the division’s public relations office described the deployment as part of Indian Railways’ wider efforts to strengthen train protection through indigenous technology. Kavach is designed to assist locomotive pilots by monitoring train movements and supporting compliance with signalling and speed restrictions. The system can help prevent collisions, overspeeding and accidents linked to signal violations by issuing alerts and triggering safety interventions when required. Its deployment on additional sections is expected to support the gradual expansion of automatic train protection across busy railway routes. The Agra-Dholpur section forms part of the wider Delhi-Agra rail corridor, where infrastructure and safety upgrades are being implemented to support faster services. Further speed enhancement will depend on the commissioning of Kavach on remaining sections, along with the completion of associated operational and safety requirements.

Related Stories

Gold Stories

Next Story
Building Material

Cement Prices Rise Rs. 7 per Bag in September; October Hikes Expected

Cement companies may seek to raise prices by Rs. 5 to Rs. 20 per bag across most markets in October, although the ability to sustain the increases will depend on demand recovery and dealer acceptance, according to a report by Centrum Broking. The outlook follows a pickup in pricing momentum during September after largely stable prices in July and August. The all-India average trade price increased by Rs. 7 per bag month-on-month to Rs. 356 in September. Centrum Broking’s channel checks indicated gains across both trade and non-trade segments, with non-trade prices recording sharper increases..

Next Story
Products

Minister G Kishan Reddy Says No Coal Shortage Despite Higher Power Demand

Union Coal and Mines Minister G Kishan Reddy said India was not facing a coal shortage despite higher demand from thermal power plants, monsoon-related disruptions in mining operations and lower hydropower generation. He said coal was being supplied to power stations through railway rakes and road transport. Reddy made the remarks on Monday on the sidelines of the Assocham-organised Angul Aluminium Roadshow in Kolkata. His comments came amid reports of alleged supply constraints at some power plants, although he said the temporary interruptions should not be interpreted as a broader shortage. ..

Next Story
Infrastructure Energy

Bondada Engineering Secures Rs. 1.47 bn in Multiple Orders

Bondada Engineering has secured multiple domestic orders with an aggregate value of Rs. 1.47 bn, the company disclosed in a filing with BSE on September 29, 2026. The orders cover telecom infrastructure, renewable energy and energy-efficient lighting solutions, and are inclusive of taxes. Bondada Green Engineering, a subsidiary of Bondada Engineering, received an order for the supply of 200 telecom towers under the BSNL 40GBT project in Gujarat. The award forms part of the company’s telecom infrastructure business and is linked to requirements in the state. Bondada Renewable Energy, another ..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code