+
Maruti Suzuki Opens Rs 4.52 Bn Rail Siding at Manesar
RAILWAYS & METRO RAIL

Maruti Suzuki Opens Rs 4.52 Bn Rail Siding at Manesar

Maruti Suzuki India Ltd (MSIL) has inaugurated India’s largest in-plant railway siding for automobiles at its Manesar facility, with a total investment of Rs 4.52 billion. The move is part of the company’s long-term strategy to shift more vehicle dispatches to railways, targeting a 35 per cent share by the 2030–31 financial year.

Since 2014–15, MSIL has dispatched 2.5 million vehicles via railway, and in March 2024, it became the first Indian automaker to set up an in-plant siding at its Gujarat facility. The new Manesar railway siding is aligned with the PM Gati Shakti National Master Plan and forms part of the 126-km Haryana Orbital Rail Corridor (HORC) stretching from Sonipat to Palwal.

The project has been developed by Haryana Orbital Rail Corporation Ltd (HORCL), a joint venture in which MSIL has committed Rs 3.25 billion. An additional Rs 1.27 billion has been allocated for internal yard development within the Manesar facility.

Hisashi Takeuchi, Managing Director and CEO of MSIL, said: “Aligned to the PM’s Gati Shakti National Master Plan, this second in-plant railway siding marks a milestone in our green logistics journey. Reducing carbon emissions remains a core priority, and we aim to achieve 35 per cent rail-based dispatches by FY 2030–31.”

The project is expected to avoid 175,000 tonnes of CO2 equivalent emissions annually, save 60 million litres of fuel at full operational capacity, and reduce road congestion. Spread across 46 acres, the railway siding includes a fully electrified corridor with four full-length rake tracks and one engine escape track, totalling 8.2 km of track length.

Vehicles produced at MSIL’s Manesar and Gurugram plants will be dispatched to 17 logistics hubs, servicing 380 cities nationwide. Export hubs at Mundra and Pipavav ports will also be served. At full capacity, the siding will facilitate the dispatch of 450,000 vehicles annually.

Maruti Suzuki India Ltd (MSIL) has inaugurated India’s largest in-plant railway siding for automobiles at its Manesar facility, with a total investment of Rs 4.52 billion. The move is part of the company’s long-term strategy to shift more vehicle dispatches to railways, targeting a 35 per cent share by the 2030–31 financial year.Since 2014–15, MSIL has dispatched 2.5 million vehicles via railway, and in March 2024, it became the first Indian automaker to set up an in-plant siding at its Gujarat facility. The new Manesar railway siding is aligned with the PM Gati Shakti National Master Plan and forms part of the 126-km Haryana Orbital Rail Corridor (HORC) stretching from Sonipat to Palwal.The project has been developed by Haryana Orbital Rail Corporation Ltd (HORCL), a joint venture in which MSIL has committed Rs 3.25 billion. An additional Rs 1.27 billion has been allocated for internal yard development within the Manesar facility.Hisashi Takeuchi, Managing Director and CEO of MSIL, said: “Aligned to the PM’s Gati Shakti National Master Plan, this second in-plant railway siding marks a milestone in our green logistics journey. Reducing carbon emissions remains a core priority, and we aim to achieve 35 per cent rail-based dispatches by FY 2030–31.”The project is expected to avoid 175,000 tonnes of CO2 equivalent emissions annually, save 60 million litres of fuel at full operational capacity, and reduce road congestion. Spread across 46 acres, the railway siding includes a fully electrified corridor with four full-length rake tracks and one engine escape track, totalling 8.2 km of track length.Vehicles produced at MSIL’s Manesar and Gurugram plants will be dispatched to 17 logistics hubs, servicing 380 cities nationwide. Export hubs at Mundra and Pipavav ports will also be served. At full capacity, the siding will facilitate the dispatch of 450,000 vehicles annually.

Related Stories

Gold Stories

Next Story
Infrastructure Transport

Mumbai-Ahmedabad Bullet Train’s Surat-Vapi Section Set for 2027

The first section of the Mumbai-Ahmedabad Bullet Train corridor, linking Surat and Vapi, is targeted to begin services in 2027. Construction is expected to be completed by December 2026, while Railway Minister Ashwini Vaishnaw has indicated that an inauguration could take place around the middle of 2027. The National High Speed Rail Corporation (NHSRCL) said the train being manufactured in India is expected to reach the tracks around April or May 2027. The train will undergo extensive testing before the section is opened for passenger services. The project began construction in 2021 and includ..

Next Story
Infrastructure Transport

Indian Railways Approves Four Projects Worth Rs. 7.36 bn Across Four States

Indian Railways has approved four projects with a combined value of Rs. 7.36 bn across Uttar Pradesh, Maharashtra, Andhra Pradesh and Gujarat. The programme covers train protection, signalling, electric traction supply and a road overbridge, with each project assigned to a different railway zone. In Uttar Pradesh, Rs. 2.52 bn has been approved to extend the Kavach 4.0 automatic train protection system across 607.7 km in the Lucknow Division of North Eastern Railway. The system monitors train movements and can apply the brakes if a driver fails to observe a signal or exceeds a safe speed. The w..

Next Story
Infrastructure Urban

Chandru Raheja Sells 1.49% Stake in Mindspace REIT for Rs. 5 bn

Billionaire Chandru Lachmandas Raheja has sold a 1.49 per cent holding in Mindspace Business Parks REIT for Rs. 5 bn through a bulk deal on the BSE. The transaction involved 9.9 mn units and was executed at an average price of Rs. 505 per unit, according to exchange data. Following the sale, units of Mindspace Business Parks REIT were trading 0.18 per cent lower at Rs. 504.05 on Tuesday. Exchange data did not identify the buyers involved in the transaction. Raheja is the chairman of real estate company K Raheja Corp. The sale involved 99,00,990 units, representing 1.49 per cent of the Mumbai-b..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code