MMRDA floats tender for package 4  MTHL project
RAILWAYS & METRO RAIL

MMRDA floats tender for package 4 MTHL project

On Friday, the Mumbai Metropolitan Region Development Authority (MMRDA) floated tenders for constructing Package 4 of the Mumbai Trans Harbour Link (MTHL) project on a design and build basis.

MTHL, a 21.8-km six-lane sea link road, will connect Chirle in Navi Mumbai and Sewri in Mumbai. Work on the project is likely to be completed in October 2023. Officials told the media that 35% to 40% of civil works have been completed till now.

The MMRDA had received an Official Development Assistance loan from Japan International Cooperation to fund MTHL.

It has granted contracts for the three civil packages of the project, including a 21.8 km distance.

While Package 1 comprises 10.38-km long bridge construction across the Mumbai Bay, covering the Sewri interchange, Package 2 includes a 7.807-km long bridge construction across the Mumbai Bay, covering the Shivaji Nagar interchange.

Package 3 includes a 3.613-km long viaduct construction involving interchanges at state highway 54 and national highway 4B near Chirle in Navi Mumbai.

According to an official, the MMRDA has invited sealed tenders from eligible bidders for the Package 4 construction. The tender is primarily for design, supply, installation, testing and commissioning of the intelligent transport system, toll management, highway and bridge street lighting, electrical works, construction of toll plazas and administrative buildings, involving the command control centre.

Image Source


Also read: Mumbai Trans Harbour Link: 52% work completed

On Friday, the Mumbai Metropolitan Region Development Authority (MMRDA) floated tenders for constructing Package 4 of the Mumbai Trans Harbour Link (MTHL) project on a design and build basis. MTHL, a 21.8-km six-lane sea link road, will connect Chirle in Navi Mumbai and Sewri in Mumbai. Work on the project is likely to be completed in October 2023. Officials told the media that 35% to 40% of civil works have been completed till now. The MMRDA had received an Official Development Assistance loan from Japan International Cooperation to fund MTHL. It has granted contracts for the three civil packages of the project, including a 21.8 km distance. While Package 1 comprises 10.38-km long bridge construction across the Mumbai Bay, covering the Sewri interchange, Package 2 includes a 7.807-km long bridge construction across the Mumbai Bay, covering the Shivaji Nagar interchange. Package 3 includes a 3.613-km long viaduct construction involving interchanges at state highway 54 and national highway 4B near Chirle in Navi Mumbai. According to an official, the MMRDA has invited sealed tenders from eligible bidders for the Package 4 construction. The tender is primarily for design, supply, installation, testing and commissioning of the intelligent transport system, toll management, highway and bridge street lighting, electrical works, construction of toll plazas and administrative buildings, involving the command control centre. Image Source Also read: Mumbai Trans Harbour Link: 52% work completed

Next Story
Infrastructure Urban

InsideFPV Delivers ₹10 Crore Kamikaze Drone Order Under MoD’s EPR Route

InsideFPV, a Surat-based drone technology manufacturer, has successfully executed a ₹10 crore defence contract to supply indigenous kamikaze drones under the Ministry of Defence’s Emergency Procurement Route (EPR). The company completed the delivery of hundreds of FPV kamikaze drone platforms within a rapid two-month timeframe, highlighting its ability to meet urgent military procurement timelines.The supply orders were fulfilled under the emergency procurement mechanism, which is aimed at fast-tracking acquisitions for immediate operational needs. InsideFPV’s quick execution reflects it..

Next Story
Infrastructure Energy

Vedanta Resources Secures Fitch Upgrade to ‘BB-’, Best Rating Since 2015

Vedanta Resources Limited (VRL), a global player in metals, oil & gas, critical minerals, power and technology, has received a credit rating upgrade from Fitch Ratings, marking its strongest bond rating in over a decade.Fitch has raised Vedanta Resources’ Long-Term Foreign-Currency Issuer Default Rating (IDR) to ‘BB-’ from ‘B+’, while maintaining a Stable Outlook. The agency also upgraded VRL’s senior unsecured rating, along with the ratings of US dollar-denominated bonds issued by Vedanta Resources Finance II Plc and guaranteed by VRL, to ‘BB-’.The upgrade represents Vedan..

Next Story
Real Estate

NAREDCO NextGen NCR Chapter Launched

The NAREDCO NextGen NCR Chapter was recently launched at Excelerate 2026 in Mumbai, marking a key step towards integrating emerging real estate leaders from the National Capital Region with the national platform. The initiative aims to promote sustainable and responsible urban development through collaboration and knowledge exchange.The event brought together young developers, entrepreneurs, and professionals from across NCR, including Noida, Gurugram, Ghaziabad, Faridabad, Bhiwadi, and Meerut. Discussions focused on urban development, finance, sustainability, innovation, and policy, emphasisi..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement