Northeast railway completes electrification from Katihar to Guwahati
RAILWAYS & METRO RAIL

Northeast railway completes electrification from Katihar to Guwahati

In a historical accomplishment, CRS authorisation has been obtained for the opening of AC electric traction to & from Guwahati railway station.

Guwahati is the largest and busiest railway station of Northeast being situated in the capital of Assam. So the largest city of Northeast is now literally linked with all metros and other big cities via 25KV AC traction.

Northeast Frontier Railway (NFR) has achieved Electrification work of 649 RKM or 1294 TKM from Katihar to Guwahati. This way, the Total HDN (High-Density Network) routes (649 RKM) coming in NFR have been launched with Electric Traction.

This achievement will now link New Delhi to Guwahati on seamless Electric Traction. It is yet another attempt by NFR for capital connectivity by Green Transportation.

It may be stated that Northeast Frontier Railway has already begun running trains with electric traction from the Kamakhya station with the arrival and departure of the Brahmaputra Mail with AC traction since 22nd October last.

With the achievement of the electrification of the Guwahati station, other prestigious trains like Rajdhani Express, Tejas Rajdhani Express etc from the Northeast can now be shifted over to operate on electric traction from Guwahati to the National capital and other cities such as Kolkata, Mumbai, Chennai, etc directly without change of traction enroute.

This Electrification work will save foreign exchange reserves used on HSD Oil and would render greener transportation and reduce carbon footprints.

Additionally, passenger trains with higher speed and heavier goods trains can be operated.

Some of the advantages that will be obtained due to the electrification of the sections are that there would be net saving on foreign exchange spent on HSD Oil of Rs 300 Cr per annum. The consumption of HSD Oil will additionally be decreased by 3400 KL per month which will decrease dependence on imported petroleum. Due to seamless train operation, traction change, which is necessary at New Jalpaiguri and New Coochbehar will be done away with. It will improve the mobility of the trains.

Due to improved mobility, the total running time between Katihar to Guwahati will be decreased by 2 hours due to the higher speed of the trains. Approximately 10% more no. of trains can be operated in the section. Due to electrification, heavier goods trains can be moved at higher speeds. With the improved line capacity, 10% new passenger trains can be launched, and this will help in the launch of more Rajdhani exp for capital connectivity projects.

Electrification will decrease the dependence on imported petroleum. Due to electrification, Head on Generation (HOG) technology can be utilised instead of End on Generation (EOG) system with two power cars using two DG sets on either end on all Linke Hofmann Busch (LHB) coach fitted trains.

The power generator cars which use approximately 100-litre diesel per hour can be preserved apart from the noise, fume emission during the run. Greenhouse gas emissions for electric traction will come which will result in a reduced carbon footprint.

Image Source

"Join industry leaders at RAHSTA Expo, India's premier platform for roads, highways and traffic infrastructure. Register now to explore innovations, network with experts and shape the future of mobility."

In a historical accomplishment, CRS authorisation has been obtained for the opening of AC electric traction to & from Guwahati railway station. Guwahati is the largest and busiest railway station of Northeast being situated in the capital of Assam. So the largest city of Northeast is now literally linked with all metros and other big cities via 25KV AC traction. Northeast Frontier Railway (NFR) has achieved Electrification work of 649 RKM or 1294 TKM from Katihar to Guwahati. This way, the Total HDN (High-Density Network) routes (649 RKM) coming in NFR have been launched with Electric Traction. This achievement will now link New Delhi to Guwahati on seamless Electric Traction. It is yet another attempt by NFR for capital connectivity by Green Transportation. It may be stated that Northeast Frontier Railway has already begun running trains with electric traction from the Kamakhya station with the arrival and departure of the Brahmaputra Mail with AC traction since 22nd October last. With the achievement of the electrification of the Guwahati station, other prestigious trains like Rajdhani Express, Tejas Rajdhani Express etc from the Northeast can now be shifted over to operate on electric traction from Guwahati to the National capital and other cities such as Kolkata, Mumbai, Chennai, etc directly without change of traction enroute. This Electrification work will save foreign exchange reserves used on HSD Oil and would render greener transportation and reduce carbon footprints. Additionally, passenger trains with higher speed and heavier goods trains can be operated. Some of the advantages that will be obtained due to the electrification of the sections are that there would be net saving on foreign exchange spent on HSD Oil of Rs 300 Cr per annum. The consumption of HSD Oil will additionally be decreased by 3400 KL per month which will decrease dependence on imported petroleum. Due to seamless train operation, traction change, which is necessary at New Jalpaiguri and New Coochbehar will be done away with. It will improve the mobility of the trains. Due to improved mobility, the total running time between Katihar to Guwahati will be decreased by 2 hours due to the higher speed of the trains. Approximately 10% more no. of trains can be operated in the section. Due to electrification, heavier goods trains can be moved at higher speeds. With the improved line capacity, 10% new passenger trains can be launched, and this will help in the launch of more Rajdhani exp for capital connectivity projects. Electrification will decrease the dependence on imported petroleum. Due to electrification, Head on Generation (HOG) technology can be utilised instead of End on Generation (EOG) system with two power cars using two DG sets on either end on all Linke Hofmann Busch (LHB) coach fitted trains. The power generator cars which use approximately 100-litre diesel per hour can be preserved apart from the noise, fume emission during the run. Greenhouse gas emissions for electric traction will come which will result in a reduced carbon footprint. Image Source

Next Story
Infrastructure Urban

ABS Marine Sees CRISIL Credit Rating Upgrade

ABS Marine Services has secured an upgrade to its long term and short term credit ratings from CRISIL, reflecting improved profitability and revenue growth through long term contracts. CRISIL moved the long term rating from BBB+/Stable to A-/Stable and revised the short term rating from A2 to A2+. The action signals strengthened financial metrics and operational resilience. The company benefited from durable client relationships with firms such as ONGC and Schlumberger. The rating decision followed stronger cash flows and an enlarged bank loan facility, which increased from Rs 3,705 million (m..

Next Story
Infrastructure Transport

Project BRAHMANK Marks 16 Years Of Strategic Roads In Arunachal

Project BRAHMANK is marking 16 years of work to establish strategic road and bridge links across Arunachal Pradesh, maintaining and developing 811 kilometres of roads and nearly 86 bridges that range from small culverts to large steel and arch bridges. These transport links are described as critical for ensuring year-round movement of defence personnel, equipment and essential supplies while improving everyday travel for people in remote villages. The project balances national security requirements with regional development by focusing on reliable access in challenging terrain. Notable enginee..

Next Story
Infrastructure Transport

Longleng CSOs Give One Week Ultimatum Over Two-Lane Highway

Civil society organisations (CSOs) in Longleng district have demanded immediate restoration of the deteriorating Changtongya–Longleng two-lane road and sought a detailed status report on the stalled construction within one week. The demand followed a consultative meeting convened under the Phom Peoples' Council (PPC) to discuss welfare and development concerns. PPC president YB Angam Phom said prolonged non-maintenance had caused hardship to commuters and affected transportation, local commerce and the district's development. The meeting urged authorities to undertake immediate restoration a..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement