Rail corridor linking Delhi, Haryana, Gujarat ports approved
RAILWAYS & METRO RAIL

Rail corridor linking Delhi, Haryana, Gujarat ports approved

The Ministry of Railways has given the green light to the 129 km South Haryana Economic Rail Corridor, linking Haryana with four ports in Gujarat via Rajasthan. The ministry will conduct a survey for the semi-high-speed rail corridor. Once constructed, trains on the corridor will run at speeds of 130-160kmph.

The project received approval from the Haryana government in 2022 and is estimated to cost Rs 1,225 crore. The aim of the project is to reduce travel time and improve connectivity to industrial hubs.

The proposed rail corridor will stretch from Farrukhnagar in Gurgaon to Loharu in Bhiwani, passing through Jhajjar and Charkhi Dadri. The corridor will eventually connect with Bahadurgarh and Sonipat through the under-construction Orbital Rail Corridor. This project will be executed by the Haryana Rail Infrastructure Development Corporation (HRIDC), a joint venture between the Indian Railways and the Haryana government.

According to officials, upon its completion, the project will significantly reduce the travel distance between Delhi-NCR and Gujarat, making the route to Gujarat shorter and more convenient for commuters.

The implementation of this project will result in reduced travel time between Delhi and various cities in Rajasthan, including Sikar, Jhunjhunu, Bikaner, Jaisalmer, Jodhpur, Barmer, Hanumangarh, and Sri Ganganagar. Additionally, it will also shorten the travel duration between Delhi and destinations in Gujarat, such as Gandhidham, Bhuj, and Dwarka. Currently, trains from Delhi follow a route via Rewari to reach Rajasthan.

At present, HRIDC is working on the Haryana Orbital Rail Corridor (HORC), which will connect Palwal to Sonipat, through Sohna, Manesar and Kharkhoda, benefiting both passenger and goods transportation. The railway ministry has also approved a survey for a double line between Gadi Harsuru and Loharu via Sultanpur Farrukhnagar, Jhajjar, and Charkhi Dadri. Once completed, the project will significantly reduce travel time between Delhi and various destinations in Rajasthan and Gujarat.

"Join industry leaders at RAHSTA Expo, India's premier platform for roads, highways and traffic infrastructure. Register now to explore innovations, network with experts and shape the future of mobility."

The Ministry of Railways has given the green light to the 129 km South Haryana Economic Rail Corridor, linking Haryana with four ports in Gujarat via Rajasthan. The ministry will conduct a survey for the semi-high-speed rail corridor. Once constructed, trains on the corridor will run at speeds of 130-160kmph.The project received approval from the Haryana government in 2022 and is estimated to cost Rs 1,225 crore. The aim of the project is to reduce travel time and improve connectivity to industrial hubs.The proposed rail corridor will stretch from Farrukhnagar in Gurgaon to Loharu in Bhiwani, passing through Jhajjar and Charkhi Dadri. The corridor will eventually connect with Bahadurgarh and Sonipat through the under-construction Orbital Rail Corridor. This project will be executed by the Haryana Rail Infrastructure Development Corporation (HRIDC), a joint venture between the Indian Railways and the Haryana government.According to officials, upon its completion, the project will significantly reduce the travel distance between Delhi-NCR and Gujarat, making the route to Gujarat shorter and more convenient for commuters.The implementation of this project will result in reduced travel time between Delhi and various cities in Rajasthan, including Sikar, Jhunjhunu, Bikaner, Jaisalmer, Jodhpur, Barmer, Hanumangarh, and Sri Ganganagar. Additionally, it will also shorten the travel duration between Delhi and destinations in Gujarat, such as Gandhidham, Bhuj, and Dwarka. Currently, trains from Delhi follow a route via Rewari to reach Rajasthan.At present, HRIDC is working on the Haryana Orbital Rail Corridor (HORC), which will connect Palwal to Sonipat, through Sohna, Manesar and Kharkhoda, benefiting both passenger and goods transportation. The railway ministry has also approved a survey for a double line between Gadi Harsuru and Loharu via Sultanpur Farrukhnagar, Jhajjar, and Charkhi Dadri. Once completed, the project will significantly reduce travel time between Delhi and various destinations in Rajasthan and Gujarat.

Next Story
Infrastructure Urban

ABS Marine Sees CRISIL Credit Rating Upgrade

ABS Marine Services has secured an upgrade to its long term and short term credit ratings from CRISIL, reflecting improved profitability and revenue growth through long term contracts. CRISIL moved the long term rating from BBB+/Stable to A-/Stable and revised the short term rating from A2 to A2+. The action signals strengthened financial metrics and operational resilience. The company benefited from durable client relationships with firms such as ONGC and Schlumberger. The rating decision followed stronger cash flows and an enlarged bank loan facility, which increased from Rs 3,705 million (m..

Next Story
Infrastructure Transport

Project BRAHMANK Marks 16 Years Of Strategic Roads In Arunachal

Project BRAHMANK is marking 16 years of work to establish strategic road and bridge links across Arunachal Pradesh, maintaining and developing 811 kilometres of roads and nearly 86 bridges that range from small culverts to large steel and arch bridges. These transport links are described as critical for ensuring year-round movement of defence personnel, equipment and essential supplies while improving everyday travel for people in remote villages. The project balances national security requirements with regional development by focusing on reliable access in challenging terrain. Notable enginee..

Next Story
Infrastructure Transport

Longleng CSOs Give One Week Ultimatum Over Two-Lane Highway

Civil society organisations (CSOs) in Longleng district have demanded immediate restoration of the deteriorating Changtongya–Longleng two-lane road and sought a detailed status report on the stalled construction within one week. The demand followed a consultative meeting convened under the Phom Peoples' Council (PPC) to discuss welfare and development concerns. PPC president YB Angam Phom said prolonged non-maintenance had caused hardship to commuters and affected transportation, local commerce and the district's development. The meeting urged authorities to undertake immediate restoration a..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement