Rail corridor linking Delhi, Haryana, Gujarat ports approved
RAILWAYS & METRO RAIL

Rail corridor linking Delhi, Haryana, Gujarat ports approved

The Ministry of Railways has given the green light to the 129 km South Haryana Economic Rail Corridor, linking Haryana with four ports in Gujarat via Rajasthan. The ministry will conduct a survey for the semi-high-speed rail corridor. Once constructed, trains on the corridor will run at speeds of 130-160kmph.

The project received approval from the Haryana government in 2022 and is estimated to cost Rs 1,225 crore. The aim of the project is to reduce travel time and improve connectivity to industrial hubs.

The proposed rail corridor will stretch from Farrukhnagar in Gurgaon to Loharu in Bhiwani, passing through Jhajjar and Charkhi Dadri. The corridor will eventually connect with Bahadurgarh and Sonipat through the under-construction Orbital Rail Corridor. This project will be executed by the Haryana Rail Infrastructure Development Corporation (HRIDC), a joint venture between the Indian Railways and the Haryana government.

According to officials, upon its completion, the project will significantly reduce the travel distance between Delhi-NCR and Gujarat, making the route to Gujarat shorter and more convenient for commuters.

The implementation of this project will result in reduced travel time between Delhi and various cities in Rajasthan, including Sikar, Jhunjhunu, Bikaner, Jaisalmer, Jodhpur, Barmer, Hanumangarh, and Sri Ganganagar. Additionally, it will also shorten the travel duration between Delhi and destinations in Gujarat, such as Gandhidham, Bhuj, and Dwarka. Currently, trains from Delhi follow a route via Rewari to reach Rajasthan.

At present, HRIDC is working on the Haryana Orbital Rail Corridor (HORC), which will connect Palwal to Sonipat, through Sohna, Manesar and Kharkhoda, benefiting both passenger and goods transportation. The railway ministry has also approved a survey for a double line between Gadi Harsuru and Loharu via Sultanpur Farrukhnagar, Jhajjar, and Charkhi Dadri. Once completed, the project will significantly reduce travel time between Delhi and various destinations in Rajasthan and Gujarat.

The Ministry of Railways has given the green light to the 129 km South Haryana Economic Rail Corridor, linking Haryana with four ports in Gujarat via Rajasthan. The ministry will conduct a survey for the semi-high-speed rail corridor. Once constructed, trains on the corridor will run at speeds of 130-160kmph.The project received approval from the Haryana government in 2022 and is estimated to cost Rs 1,225 crore. The aim of the project is to reduce travel time and improve connectivity to industrial hubs.The proposed rail corridor will stretch from Farrukhnagar in Gurgaon to Loharu in Bhiwani, passing through Jhajjar and Charkhi Dadri. The corridor will eventually connect with Bahadurgarh and Sonipat through the under-construction Orbital Rail Corridor. This project will be executed by the Haryana Rail Infrastructure Development Corporation (HRIDC), a joint venture between the Indian Railways and the Haryana government.According to officials, upon its completion, the project will significantly reduce the travel distance between Delhi-NCR and Gujarat, making the route to Gujarat shorter and more convenient for commuters.The implementation of this project will result in reduced travel time between Delhi and various cities in Rajasthan, including Sikar, Jhunjhunu, Bikaner, Jaisalmer, Jodhpur, Barmer, Hanumangarh, and Sri Ganganagar. Additionally, it will also shorten the travel duration between Delhi and destinations in Gujarat, such as Gandhidham, Bhuj, and Dwarka. Currently, trains from Delhi follow a route via Rewari to reach Rajasthan.At present, HRIDC is working on the Haryana Orbital Rail Corridor (HORC), which will connect Palwal to Sonipat, through Sohna, Manesar and Kharkhoda, benefiting both passenger and goods transportation. The railway ministry has also approved a survey for a double line between Gadi Harsuru and Loharu via Sultanpur Farrukhnagar, Jhajjar, and Charkhi Dadri. Once completed, the project will significantly reduce travel time between Delhi and various destinations in Rajasthan and Gujarat.

Next Story
Infrastructure Urban

Green SM Launches All-Electric Premium Taxi Service at Soekarno-Hatta

Green SM, in partnership with Taksi Diamond, has launched Green SM Airport, a premium all-electric taxi service at Soekarno-Hatta International Airport. To mark the launch, passengers can avail discounts of up to IDR 50,000 per ride, equivalent to 15 per cent off, during the promotional period. Equipped with VinFast all-electric vehicles, the service is tailored for airport passengers with spacious interiors, quiet engines, and ample luggage capacity. Operating from Terminals 2 and 3, passengers can book via the Green SM app under “Green Airport” or “Green Now,” or hail taxis dire..

Next Story
Infrastructure Urban

Rhenus Opens Bangkok Air Freight Gateway to Boost Regional Trade

The Rhenus Group has inaugurated a new air freight gateway at Suvarnabhumi Airport, strengthening its role as a logistics provider in Southeast Asia. The facility, spanning 600 sqm, offers 24/7 services including door-to-door delivery, customs clearance, FTZ storage, and direct links to Rhenus’ warehouses near Bangkok and Laem Chabang seaport. Certified under ISO 9001, 14001, 45001, AEO, IATA and TAFA, the gateway features high security, fast processing for urgent shipments, and value-added services such as palletising, relabelling, and consolidation. “Bangkok is one of the world..

Next Story
Infrastructure Urban

DCPC Prepares for Special Campaign 5.0 with Focus on E-Waste

The Department of Chemicals and Petrochemicals (DCPC), Ministry of Chemicals and Fertilisers, is gearing up for Special Campaign 5.0, to be held from 2nd to 31st October 2025. The initiative will focus on e-waste disposal as per MoEFCC’s E-Waste Management Rules 2022, space optimisation, and enhancing workplace efficiency across field offices.Special Campaign 4.0, conducted between October 2023 and October 2024, delivered notable results in record management, grievance redressal, scrap disposal, and cleanliness drives.Key outcomes of Special Campaign 4.0Records management: 2,443 physical fil..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?