Rail corridor linking Delhi, Haryana, Gujarat ports approved
RAILWAYS & METRO RAIL

Rail corridor linking Delhi, Haryana, Gujarat ports approved

The Ministry of Railways has given the green light to the 129 km South Haryana Economic Rail Corridor, linking Haryana with four ports in Gujarat via Rajasthan. The ministry will conduct a survey for the semi-high-speed rail corridor. Once constructed, trains on the corridor will run at speeds of 130-160kmph.

The project received approval from the Haryana government in 2022 and is estimated to cost Rs 1,225 crore. The aim of the project is to reduce travel time and improve connectivity to industrial hubs.

The proposed rail corridor will stretch from Farrukhnagar in Gurgaon to Loharu in Bhiwani, passing through Jhajjar and Charkhi Dadri. The corridor will eventually connect with Bahadurgarh and Sonipat through the under-construction Orbital Rail Corridor. This project will be executed by the Haryana Rail Infrastructure Development Corporation (HRIDC), a joint venture between the Indian Railways and the Haryana government.

According to officials, upon its completion, the project will significantly reduce the travel distance between Delhi-NCR and Gujarat, making the route to Gujarat shorter and more convenient for commuters.

The implementation of this project will result in reduced travel time between Delhi and various cities in Rajasthan, including Sikar, Jhunjhunu, Bikaner, Jaisalmer, Jodhpur, Barmer, Hanumangarh, and Sri Ganganagar. Additionally, it will also shorten the travel duration between Delhi and destinations in Gujarat, such as Gandhidham, Bhuj, and Dwarka. Currently, trains from Delhi follow a route via Rewari to reach Rajasthan.

At present, HRIDC is working on the Haryana Orbital Rail Corridor (HORC), which will connect Palwal to Sonipat, through Sohna, Manesar and Kharkhoda, benefiting both passenger and goods transportation. The railway ministry has also approved a survey for a double line between Gadi Harsuru and Loharu via Sultanpur Farrukhnagar, Jhajjar, and Charkhi Dadri. Once completed, the project will significantly reduce travel time between Delhi and various destinations in Rajasthan and Gujarat.

The Ministry of Railways has given the green light to the 129 km South Haryana Economic Rail Corridor, linking Haryana with four ports in Gujarat via Rajasthan. The ministry will conduct a survey for the semi-high-speed rail corridor. Once constructed, trains on the corridor will run at speeds of 130-160kmph.The project received approval from the Haryana government in 2022 and is estimated to cost Rs 1,225 crore. The aim of the project is to reduce travel time and improve connectivity to industrial hubs.The proposed rail corridor will stretch from Farrukhnagar in Gurgaon to Loharu in Bhiwani, passing through Jhajjar and Charkhi Dadri. The corridor will eventually connect with Bahadurgarh and Sonipat through the under-construction Orbital Rail Corridor. This project will be executed by the Haryana Rail Infrastructure Development Corporation (HRIDC), a joint venture between the Indian Railways and the Haryana government.According to officials, upon its completion, the project will significantly reduce the travel distance between Delhi-NCR and Gujarat, making the route to Gujarat shorter and more convenient for commuters.The implementation of this project will result in reduced travel time between Delhi and various cities in Rajasthan, including Sikar, Jhunjhunu, Bikaner, Jaisalmer, Jodhpur, Barmer, Hanumangarh, and Sri Ganganagar. Additionally, it will also shorten the travel duration between Delhi and destinations in Gujarat, such as Gandhidham, Bhuj, and Dwarka. Currently, trains from Delhi follow a route via Rewari to reach Rajasthan.At present, HRIDC is working on the Haryana Orbital Rail Corridor (HORC), which will connect Palwal to Sonipat, through Sohna, Manesar and Kharkhoda, benefiting both passenger and goods transportation. The railway ministry has also approved a survey for a double line between Gadi Harsuru and Loharu via Sultanpur Farrukhnagar, Jhajjar, and Charkhi Dadri. Once completed, the project will significantly reduce travel time between Delhi and various destinations in Rajasthan and Gujarat.

Next Story
Building Material

Trishakti Industries Secures Major Tata Steel Order

Trishakti Industries Limited has secured a significant order from Tata Steel Ltd for the deployment of advanced machinery and skilled manpower at one of the steel major’s flagship project sites.The contract, awarded domestically, involves the hiring of machines along with manpower, with execution set to be completed by 20th September 2025. The initial contract period is 12 months. The total fresh capital expenditure for the project is approximately Rs 1.5 million, while the overall contract value is expected to exceed Rs 5 million inclusive of taxes.This order marks a reinforcement of top-ti..

Next Story
Real Estate

Kalpataru Projects Secures Rs 27.2 Billion in New Orders

Kalpataru Projects International Limited (KPIL), a leading EPC player in the power transmission and distribution (T&D) and civil infrastructure sector, along with its international subsidiaries, has received new orders and notifications for projects worth approximately Rs 27.2 billion.The projects include:Power Transmission & Distribution (T&D) initiatives in India and overseas.Buildings and Factories (B&F) projects in India.Manish Mohnot, MD & CEO of KPIL, said, “We are delighted with the strong ordering momentum in our T&D and B&F businesses. The orders include ..

Next Story
Infrastructure Energy

ACME Solar Secures Rs 38.92 Billion Financing for Barmer Project

ACME Solar Holdings rose 2.05 per cent to Rs 308.50 after its wholly owned subsidiary, ACME Venus Urja, secured long-term project financing of Rs 38.92 billion from the State Bank of India (SBI).The funds will be utilised for the development and construction of a 400 MW Firm and Dispatchable Renewable Energy (FDRE) project in Barmer, Rajasthan. The loan repayment is structured over 19 years.The Barmer-based FDRE project is contracted with NHPC at a tariff of Rs 4.64 per unit. It will integrate solar power generation with a Battery Energy Storage System (BESS) to ensure higher reliability and d..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?