Railway to replace conventional coaches for zero casualties in derailments
RAILWAYS & METRO RAIL

Railway to replace conventional coaches for zero casualties in derailments

To ensure that there are zero casualties in case of derailment or head-on collisions between two trains on the same tracks, the railway has started working on a mission mode to replace all the existing rakes of conventional old coaches from the passenger trains with LHB (Link Hofmann Busch) coaches. The LHB coaches are now being manufactured with German technology and design to secure maximum safety and comfort for the passengers. The conventional coaches in the passenger trains on Indian Railway were used more than 40 years ago to meet the safety standards when the trains had a maximum running speed of 60 to 80 kmph. But now with an increase in speed up to 180kmph, the old conventional coaches are not safe and suitable.

Also read:
Vikram Solar unveils mono PERC bifacial solar modules
Adani Electricity to spend Rs 5 bn on Mumbai smart metering


To ensure that there are zero casualties in case of derailment or head-on collisions between two trains on the same tracks, the railway has started working on a mission mode to replace all the existing rakes of conventional old coaches from the passenger trains with LHB (Link Hofmann Busch) coaches. The LHB coaches are now being manufactured with German technology and design to secure maximum safety and comfort for the passengers. The conventional coaches in the passenger trains on Indian Railway were used more than 40 years ago to meet the safety standards when the trains had a maximum running speed of 60 to 80 kmph. But now with an increase in speed up to 180kmph, the old conventional coaches are not safe and suitable. Also read: Vikram Solar unveils mono PERC bifacial solar modulesAdani Electricity to spend Rs 5 bn on Mumbai smart metering

Next Story
Technology

Building Faster, Smarter, and Greener!

Backed by ULCCS’s century-old legacy, U-Sphere combines technology, modular design and sustainable practices to deliver faster and more efficient projects. In an interaction with CW, Rohit Prabhakar, Director - Business Development, shares how the company’s integrated model of ‘Speed-Build’, ‘Smart-Build’ and ‘Sustain-Build’ is redefining construction efficiency, quality and environmental responsibility in India.U-Sphere positions itself at the intersection of speed, sustainability and smart design. How does this translate into measurable efficiency on the ground?At U..

Next Story
Infrastructure Transport

Smart Roads, Smarter India

India’s infrastructure boom is not only about laying more kilometres of highways – it’s about building them smarter, safer and more sustainably. From drones mapping fragile Himalayan slopes to 3D machine-controlled graders reducing human error, technology is steadily reshaping the way projects are planned and executed. Yet, the journey towards digitisation remains complex, demanding not just capital but also coordination, training and vision.Until recently, engineers largely depended on Survey of India toposheets and traditional survey methods like total stations or DGPS to prepare detai..

Next Story
Real Estate

What Does DCPR 2034 Mean?

The Maharashtra government has eased approval norms for high-rise buildings under DCPR 2034, enabling the municipal commissioner to sanction projects up to 180 m on large plots. This change is expected to streamline approvals, reduce procedural delays and accelerate redevelopment, drawing reactions from developers, planners and industry experts about its implications for Mumbai’s vertical growth.Under the revised DCPR 2034 rules, buildings on plots of 2,000 sq m or more can now be approved up to 180 m by the municipal commissioner, provided structural and geotechnical reports are certified b..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?