Six Namma Metro Lines Planned for Extension
RAILWAYS & METRO RAIL

Six Namma Metro Lines Planned for Extension

A proposal has been submitted to extend six existing Namma Metro routes in Bengaluru, with the planned links aimed at connecting major industrial zones, satellite towns and emerging growth corridors. Feasibility reports are being prepared for most of the proposed extensions, while one route has reached the detailed project report stage.

The proposed extensions include the 15-km stretch from Challaghatta to Bidadi, the 24-km link between Silk Institute and Harohalli, and the 11-km route from Bommasandra to Attibele. All three projects are currently at the feasibility report stage.

Another proposal would extend the line from Kalena Agrahara to Kadugodi Tree Park by about 68 km. It is the longest of the proposed extensions and remains under feasibility assessment. The Madavara-Tumakuru route, covering about 60 km, has progressed to the detailed project report stage.

The sixth proposed extension would connect K.R Puram with Hoskote via Budigere Cross over an estimated 16 km. The project is also at the feasibility report stage. Together, the proposals are intended to broaden rail access beyond the existing urban network and support planned development around Bengaluru.

The proposed expansion is expected to improve connections to employment and education centres, reduce dependence on roads and support industrial and economic activity along the identified corridors. It would also provide links with satellite towns and allow the new sections to integrate with the existing and future metro network.

The proposals come as the Bangalore Metro Rail Corporation (BMRCL) prepares for the opening of the Pink Line. The corporation is awaiting inspection by the Commissioner of Metro Railway Safety before the route can be inaugurated. The line, which was originally expected to open earlier this year, has been delayed and preparations are now being made for a possible launch in October.

A proposal has been submitted to extend six existing Namma Metro routes in Bengaluru, with the planned links aimed at connecting major industrial zones, satellite towns and emerging growth corridors. Feasibility reports are being prepared for most of the proposed extensions, while one route has reached the detailed project report stage. The proposed extensions include the 15-km stretch from Challaghatta to Bidadi, the 24-km link between Silk Institute and Harohalli, and the 11-km route from Bommasandra to Attibele. All three projects are currently at the feasibility report stage. Another proposal would extend the line from Kalena Agrahara to Kadugodi Tree Park by about 68 km. It is the longest of the proposed extensions and remains under feasibility assessment. The Madavara-Tumakuru route, covering about 60 km, has progressed to the detailed project report stage. The sixth proposed extension would connect K.R Puram with Hoskote via Budigere Cross over an estimated 16 km. The project is also at the feasibility report stage. Together, the proposals are intended to broaden rail access beyond the existing urban network and support planned development around Bengaluru. The proposed expansion is expected to improve connections to employment and education centres, reduce dependence on roads and support industrial and economic activity along the identified corridors. It would also provide links with satellite towns and allow the new sections to integrate with the existing and future metro network. The proposals come as the Bangalore Metro Rail Corporation (BMRCL) prepares for the opening of the Pink Line. The corporation is awaiting inspection by the Commissioner of Metro Railway Safety before the route can be inaugurated. The line, which was originally expected to open earlier this year, has been delayed and preparations are now being made for a possible launch in October.

Related Stories

Gold Stories

Next Story
Resources

Schindler named among Forbes’ World’s Best Employers 2026

Schindler has been named among Forbes’ World’s Best Employers 2026, a global ranking recognising companies for their workplace environments.Compiled by Forbes in partnership with Statista, the ranking is based on independent employee feedback, including whether employees would recommend their organisation to friends and family.The company said the recognition reflected its focus on creating a workplace where employees can develop their expertise and build careers. ..

Next Story
Infrastructure Urban

India needs an export-execution mindset: Vishesh Jain

Interview with Vishesh Jain, Founder & CEO, EximpleWhat gaps in India’s global trade ecosystem led you to build Eximple, and what problem did you see businesses struggling with most?Eximple came out of a problem that all three founders had seen from different choke points in the trade ecosystem. India has millions of MSMEs and manufacturers, and many of them can make products that are genuinely competitive on quality. Yet only a small fraction is able to build meaningful international businesses. In our experience, the gap is usually not manufacturing capability; it is the ability to exe..

Next Story
Building Material

Nuvoco reports 13.5% revenue growth in Q2 FY27

Nuvoco Vistas Corp. Ltd. reported consolidated revenue of Rs 27.9 billion for Q2 FY27, up 13.5% year on year. Cement sales volume rose 9% to 4.7 million tonnes (MMT), while EBITDA increased 11% to Rs 4.11 billion.The company said it began its cement operations in 2014 with a 2.3 MMT per annum (MMTPA) operation at Nimbol. It now aims to reach 35 MMTPA of cement capacity by FY28, nearly 15 times its initial capacity. Its portfolio spans cement, ready-mix concrete and modern building materials.On sustainability and cost efficiency, Nuvoco partnered with CleanMax for a 46.4 MW wind-solar hybrid re..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code