Track laying starts on  Mumbai-Ahmedabad HSR Corridor
RAILWAYS & METRO RAIL

Track laying starts on Mumbai-Ahmedabad HSR Corridor

Construction has commenced on the first reinforced concrete (RC) track bed for the Mumbai-Ahmedabad high-speed rail corridor, utilizing the Japanese Shinkansen-inspired J-slab ballastless track system. This marks the first time utilisation of this track system in India.

The J-slab system consists of pre-cast track slabs on which fastening devices and rails are mounted. These slabs are supported by the RC track bed, with an approximate thickness of 300mm, constructed in situ for individual up and down track lines on the viaduct top. The RC track bed measures 2420mm in width.

RC anchors are integrated to prevent any longitudinal and lateral restraint to the track slab. These RC anchors, with a diameter of 520mm and a height of 260mm, are spaced at approximately 5-meter intervals. They facilitate achieving the desired alignment, both horizontally and vertically, suitable for train operations at speeds of up to 320kmph.

Contracts for track works in the entire Gujarat portion of the corridor have been awarded, with material procurement at an advanced stage. Over 14,000 MT of JIS rails and 50 molds for casting track slabs have been received from Japan. Dedicated factories have been established to manufacture the track slabs, equipped with state-of-the-art technology and infrastructure for precise slab production.

Specialized construction machinery, including rail feeder cars, slab laying cars, and CAM (Cement Asphalt Mortar) laying cars, will be employed for track works. To ensure proper execution, extensive training and certification for Indian contractor personnel are being organized in collaboration with Japan Railway Technical Services (JARTS) as the Training and Certification agency.

Construction has commenced on the first reinforced concrete (RC) track bed for the Mumbai-Ahmedabad high-speed rail corridor, utilizing the Japanese Shinkansen-inspired J-slab ballastless track system. This marks the first time utilisation of this track system in India.The J-slab system consists of pre-cast track slabs on which fastening devices and rails are mounted. These slabs are supported by the RC track bed, with an approximate thickness of 300mm, constructed in situ for individual up and down track lines on the viaduct top. The RC track bed measures 2420mm in width.RC anchors are integrated to prevent any longitudinal and lateral restraint to the track slab. These RC anchors, with a diameter of 520mm and a height of 260mm, are spaced at approximately 5-meter intervals. They facilitate achieving the desired alignment, both horizontally and vertically, suitable for train operations at speeds of up to 320kmph.Contracts for track works in the entire Gujarat portion of the corridor have been awarded, with material procurement at an advanced stage. Over 14,000 MT of JIS rails and 50 molds for casting track slabs have been received from Japan. Dedicated factories have been established to manufacture the track slabs, equipped with state-of-the-art technology and infrastructure for precise slab production.Specialized construction machinery, including rail feeder cars, slab laying cars, and CAM (Cement Asphalt Mortar) laying cars, will be employed for track works. To ensure proper execution, extensive training and certification for Indian contractor personnel are being organized in collaboration with Japan Railway Technical Services (JARTS) as the Training and Certification agency.

Next Story
Infrastructure Urban

CFI Appoints New National Council for FY27 and FY28

The Construction Federation of India (CFI) has announced its newly elected National Council and office bearers for a two-year term covering FY27 and FY28. M. V. Satish, Advisor to CMD and Lead Ambassador for Middle East, L&T, has been elected President; Priti Patel, Chief Strategy & Growth Officer, Tata Projects, has been appointed Vice President; and Ajit Bhate, Managing Director, Precast India Infrastructures, has taken charge as Treasurer.The newly formed National Council brings together senior leaders from major EPC and infrastructure companies, reflecting CFI’s continued focus o..

Next Story
Infrastructure Urban

India REIT Market Gains Momentum with Strong Returns

India’s Real Estate Investment Trust (REIT) market is witnessing strong growth, emerging as a competitive investment avenue both domestically and across Asia. According to a recent ANAROCK report released at EXCELERATE 2026 by NAREDCO Maharashtra NextGen, the sector is evolving into a mature asset class driven by solid fundamentals, regulatory backing and rising investor confidence.The introduction of Small and Medium REITs (SM REITs) in 2025 has further widened access through fractional ownership, unlocking a potential monetisation opportunity of Rs 670–710 billion. Indian REITs have deli..

Next Story
Infrastructure Energy

G R Infraprojects Secures Rs 4,130 Million BESS Contract From NTPC

G R Infraprojects said it has secured a contract from NTPC to supply and implement a battery energy storage system (BESS) valued at Rs 4,130 million (mn). The company reported the order was awarded as part of NTPC's ongoing efforts to enhance grid flexibility and energy storage capacity. The contract represents a notable addition to the firm's project pipeline and underscores demand for utility scale storage solutions. The award is expected to strengthen G R Infraprojects' presence in the energy infrastructure sector and to contribute to the firm's order book and future revenues, subject to st..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement