+
Track laying starts on  Mumbai-Ahmedabad HSR Corridor
RAILWAYS & METRO RAIL

Track laying starts on Mumbai-Ahmedabad HSR Corridor

Construction has commenced on the first reinforced concrete (RC) track bed for the Mumbai-Ahmedabad high-speed rail corridor, utilizing the Japanese Shinkansen-inspired J-slab ballastless track system. This marks the first time utilisation of this track system in India.

The J-slab system consists of pre-cast track slabs on which fastening devices and rails are mounted. These slabs are supported by the RC track bed, with an approximate thickness of 300mm, constructed in situ for individual up and down track lines on the viaduct top. The RC track bed measures 2420mm in width.

RC anchors are integrated to prevent any longitudinal and lateral restraint to the track slab. These RC anchors, with a diameter of 520mm and a height of 260mm, are spaced at approximately 5-meter intervals. They facilitate achieving the desired alignment, both horizontally and vertically, suitable for train operations at speeds of up to 320kmph.

Contracts for track works in the entire Gujarat portion of the corridor have been awarded, with material procurement at an advanced stage. Over 14,000 MT of JIS rails and 50 molds for casting track slabs have been received from Japan. Dedicated factories have been established to manufacture the track slabs, equipped with state-of-the-art technology and infrastructure for precise slab production.

Specialized construction machinery, including rail feeder cars, slab laying cars, and CAM (Cement Asphalt Mortar) laying cars, will be employed for track works. To ensure proper execution, extensive training and certification for Indian contractor personnel are being organized in collaboration with Japan Railway Technical Services (JARTS) as the Training and Certification agency.

Construction has commenced on the first reinforced concrete (RC) track bed for the Mumbai-Ahmedabad high-speed rail corridor, utilizing the Japanese Shinkansen-inspired J-slab ballastless track system. This marks the first time utilisation of this track system in India.The J-slab system consists of pre-cast track slabs on which fastening devices and rails are mounted. These slabs are supported by the RC track bed, with an approximate thickness of 300mm, constructed in situ for individual up and down track lines on the viaduct top. The RC track bed measures 2420mm in width.RC anchors are integrated to prevent any longitudinal and lateral restraint to the track slab. These RC anchors, with a diameter of 520mm and a height of 260mm, are spaced at approximately 5-meter intervals. They facilitate achieving the desired alignment, both horizontally and vertically, suitable for train operations at speeds of up to 320kmph.Contracts for track works in the entire Gujarat portion of the corridor have been awarded, with material procurement at an advanced stage. Over 14,000 MT of JIS rails and 50 molds for casting track slabs have been received from Japan. Dedicated factories have been established to manufacture the track slabs, equipped with state-of-the-art technology and infrastructure for precise slab production.Specialized construction machinery, including rail feeder cars, slab laying cars, and CAM (Cement Asphalt Mortar) laying cars, will be employed for track works. To ensure proper execution, extensive training and certification for Indian contractor personnel are being organized in collaboration with Japan Railway Technical Services (JARTS) as the Training and Certification agency.

Next Story
Real Estate

Omaxe to Develop 450-Acre Township in Indore’s Super Corridor

Omaxe has announced a major expansion in Madhya Pradesh with the acquisition of 450 acres along Indore’s Super Corridor for a modern integrated township. The company will invest Rs 12 billion in the multi-phase project, which is expected to generate Rs 25 billion in revenue over three years.  The development will include residential clusters, commercial and retail zones, schools, healthcare facilities, parks, and green mobility infrastructure. The township aims to support the region’s urban growth and rising infrastructure demand, especially with metro connectivity and major road..

Next Story
Infrastructure Energy

India’s First CBG Plant with Steel Pipeline Integration Launched

CEID Consultants and Engineering has successfully commissioned India’s first Compressed Biogas (CBG) plant integrated via a steel pipeline into a City Gas Distribution (CGD) network. Located in Batala, Gurdaspur (Punjab), the MEPL Bio-energy facility now directly supplies CBG into Gujarat Gas’ grid, eliminating the need for cylinder-based cascade transport and significantly lowering logistics costs. This breakthrough comes after CEID’s earlier deployment of MDPE pipeline offtake at the same plant. The steel pipeline marks a new industry benchmark, enabling continuous, real-time and ..

Next Story
Real Estate

Mittal Builders Plans Landmark Township to Transform Naigaon

Mittal Builders has unveiled a bold urban vision to transform Naigaon into a landmark micro-market in western Mumbai, with plans to unlock 6.5 million sq. ft. of development potential across a 70-acre land parcel. The long-term multi-phase plan has an estimated gross development value (GDV) of over Rs 80 billion. As part of this initiative, Mittal Builders has signed a joint development agreement with The House of Abhinandan Lodha (HoABL) to co-develop a 3 million sq. ft. integrated township, comprising over 4,600 apartments and high-street retail. With a planned investment of Rs 20 billi..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?