Track laying starts on  Mumbai-Ahmedabad HSR Corridor
RAILWAYS & METRO RAIL

Track laying starts on Mumbai-Ahmedabad HSR Corridor

Construction has commenced on the first reinforced concrete (RC) track bed for the Mumbai-Ahmedabad high-speed rail corridor, utilizing the Japanese Shinkansen-inspired J-slab ballastless track system. This marks the first time utilisation of this track system in India.

The J-slab system consists of pre-cast track slabs on which fastening devices and rails are mounted. These slabs are supported by the RC track bed, with an approximate thickness of 300mm, constructed in situ for individual up and down track lines on the viaduct top. The RC track bed measures 2420mm in width.

RC anchors are integrated to prevent any longitudinal and lateral restraint to the track slab. These RC anchors, with a diameter of 520mm and a height of 260mm, are spaced at approximately 5-meter intervals. They facilitate achieving the desired alignment, both horizontally and vertically, suitable for train operations at speeds of up to 320kmph.

Contracts for track works in the entire Gujarat portion of the corridor have been awarded, with material procurement at an advanced stage. Over 14,000 MT of JIS rails and 50 molds for casting track slabs have been received from Japan. Dedicated factories have been established to manufacture the track slabs, equipped with state-of-the-art technology and infrastructure for precise slab production.

Specialized construction machinery, including rail feeder cars, slab laying cars, and CAM (Cement Asphalt Mortar) laying cars, will be employed for track works. To ensure proper execution, extensive training and certification for Indian contractor personnel are being organized in collaboration with Japan Railway Technical Services (JARTS) as the Training and Certification agency.

Construction has commenced on the first reinforced concrete (RC) track bed for the Mumbai-Ahmedabad high-speed rail corridor, utilizing the Japanese Shinkansen-inspired J-slab ballastless track system. This marks the first time utilisation of this track system in India.The J-slab system consists of pre-cast track slabs on which fastening devices and rails are mounted. These slabs are supported by the RC track bed, with an approximate thickness of 300mm, constructed in situ for individual up and down track lines on the viaduct top. The RC track bed measures 2420mm in width.RC anchors are integrated to prevent any longitudinal and lateral restraint to the track slab. These RC anchors, with a diameter of 520mm and a height of 260mm, are spaced at approximately 5-meter intervals. They facilitate achieving the desired alignment, both horizontally and vertically, suitable for train operations at speeds of up to 320kmph.Contracts for track works in the entire Gujarat portion of the corridor have been awarded, with material procurement at an advanced stage. Over 14,000 MT of JIS rails and 50 molds for casting track slabs have been received from Japan. Dedicated factories have been established to manufacture the track slabs, equipped with state-of-the-art technology and infrastructure for precise slab production.Specialized construction machinery, including rail feeder cars, slab laying cars, and CAM (Cement Asphalt Mortar) laying cars, will be employed for track works. To ensure proper execution, extensive training and certification for Indian contractor personnel are being organized in collaboration with Japan Railway Technical Services (JARTS) as the Training and Certification agency.

Next Story
Building Material

Suraj Estate Wins Euromoney Award for India’s Best Residential Developer

"Suraj Estate Developers Limited has received the Euromoney Real Estate Award 2025 for ‘India’s Best Residential Developer’, positioning the company among globally benchmarked leaders in the sector. The recognition reflects its four-decade legacy in delivering high-quality residential and redevelopment-led projects across South Central Mumbai. The Euromoney Real Estate Awards, presented by the London-based Euromoney magazine, are widely regarded as one of the most credible global assessments of performance in real estate, banking and finance. Winners are selected through surveys of inte..

Next Story
Building Material

Lloyds Metals, Tata Steel Sign MoU to Explore Strategic Collaboration

"Lloyds Metals and Energy Limited has signed a non-binding Memorandum of Understanding with Tata Steel Limited to evaluate potential areas of strategic cooperation across mining, logistics, pelletisation and steelmaking. The MoU was signed by B Prabhakaran, Managing Director of Lloyds Metals, and Mr T V Narendran, CEO and Managing Director of Tata Steel. The partnership framework aims to leverage the natural operational synergies between both companies and assess opportunities in greenfield steel projects, iron ore mining, slurry pipeline infrastructure, pellet manufacturing in iron ore–ric..

Next Story
Building Material

IndiaAI, Gujarat Govt Host Regional Conclave Ahead of 2026 AI Summit

The IndiaAI Mission under the Ministry of Electronics and Information Technology, along with the Government of Gujarat and IIT Gandhinagar, convened a Regional Pre-Summit Event at Mahatma Mandir, Gandhinagar. The initiative is part of the build-up to the India–AI Impact Summit 2026, scheduled for 15–20 February 2026 at Bharat Mandapam, New Delhi. The conclave brought together senior policymakers, technology leaders, researchers and industry practitioners to examine how AI can accelerate economic, digital and social transformation across sectors. The programme focused on the overarching th..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Open In App