India’s First Port-Based Green Hydrogen Plant Launched
PORTS & SHIPPING

India’s First Port-Based Green Hydrogen Plant Launched

In a landmark development for India's clean energy transition, Union Minister for Ports, Shipping and Waterways, Shri Sarbananda Sonowal, inaugurated the country’s first port-based Green Hydrogen Pilot Project at V.O. Chidambaranar (VOC) Port in Thoothukudi. This initiative marks a major milestone in India's journey towards decarbonising maritime infrastructure.

Constructed at a cost of Rs 38.7 million, the 10 Nm³/hr green hydrogen facility will power streetlights and an electric vehicle (EV) charging station within the port colony. VOC Port has now become the first port in India to generate green hydrogen, positioning itself as a leader in sustainable port operations.

The Union Minister also laid the foundation stone for a Green Methanol Bunkering and Refuelling Facility with a capacity of 750 m³, to be built at a cost of Rs 353.4 million. This initiative aligns with the proposed Coastal Green Shipping Corridor between Kandla and Tuticorin, reinforcing VOC Port’s emerging role as a green bunkering hub in southern India.

Highlighting the significance of these initiatives, Shri Sonowal stated,“The mission of Viksit Bharat @2047 combines speed, scale, sustainability and self-reliance. These projects will not only generate employment but also attract global investment and enhance Tamil Nadu’s contribution to India’s economic aspirations.”

Additional green and infrastructure projects inaugurated include:
  • A 400 KW rooftop solar plant, raising the port’s total rooftop solar capacity to 1.04 MW, the highest among Indian ports
  • A Rs 245 million link conveyor connecting Coal Jetty-I to the port’s stack yard, boosting handling efficiency by 0.72 million metric tonnes per annum (MMTPA)
  • Foundation stones for a 6 MW wind farm, a Rs 900 million multi-cargo berth, a 3.37 km four-lane road, and the Tamil Nadu Maritime Heritage Museum
The Minister praised the transformation of Tamil Nadu’s major ports—Chennai, Kamarajar, and VOC—under the Sagarmala programme, noting that 98 projects worth Rs 937.15 billion have been undertaken over the last 11 years, with 50 already completed. Of this, over Rs 160 billion has been invested in port modernisation and capacity enhancement alone.

Paying tribute to freedom fighter V.O. Chidambaranar on his 154th birth anniversary, Shri Sonowal said,
“VOC’s Swadeshi spirit through shipping continues to inspire us. Today, we honour that legacy by strengthening our ports with green energy, innovation and self-reliance.”
The Minister also expressed gratitude to the people of Tamil Nadu and Thoothukudi, acknowledging their support in enabling the timely execution of development projects.

“Our ministry is delivering with speed, scale and commitment — and the trust of the people is central to this success,” he added.

The event also witnessed two key MoU signings:
  • Between VOC Port and IPRCL for rail connectivity to the upcoming Outer Harbour project
  • Between VOC Port and NTPC to drive green mobility initiatives
Shri Sonowal was joined by Shri T.K. Ramachandran, Secretary of MoPSW, along with senior officials from the Ministry and the Government of Tamil Nadu. These initiatives collectively underscore India’s commitment to creating a future-ready, sustainable maritime ecosystem.

In a landmark development for India's clean energy transition, Union Minister for Ports, Shipping and Waterways, Shri Sarbananda Sonowal, inaugurated the country’s first port-based Green Hydrogen Pilot Project at V.O. Chidambaranar (VOC) Port in Thoothukudi. This initiative marks a major milestone in India's journey towards decarbonising maritime infrastructure.Constructed at a cost of Rs 38.7 million, the 10 Nm³/hr green hydrogen facility will power streetlights and an electric vehicle (EV) charging station within the port colony. VOC Port has now become the first port in India to generate green hydrogen, positioning itself as a leader in sustainable port operations.The Union Minister also laid the foundation stone for a Green Methanol Bunkering and Refuelling Facility with a capacity of 750 m³, to be built at a cost of Rs 353.4 million. This initiative aligns with the proposed Coastal Green Shipping Corridor between Kandla and Tuticorin, reinforcing VOC Port’s emerging role as a green bunkering hub in southern India.Highlighting the significance of these initiatives, Shri Sonowal stated,“The mission of Viksit Bharat @2047 combines speed, scale, sustainability and self-reliance. These projects will not only generate employment but also attract global investment and enhance Tamil Nadu’s contribution to India’s economic aspirations.”Additional green and infrastructure projects inaugurated include:A 400 KW rooftop solar plant, raising the port’s total rooftop solar capacity to 1.04 MW, the highest among Indian portsA Rs 245 million link conveyor connecting Coal Jetty-I to the port’s stack yard, boosting handling efficiency by 0.72 million metric tonnes per annum (MMTPA)Foundation stones for a 6 MW wind farm, a Rs 900 million multi-cargo berth, a 3.37 km four-lane road, and the Tamil Nadu Maritime Heritage MuseumThe Minister praised the transformation of Tamil Nadu’s major ports—Chennai, Kamarajar, and VOC—under the Sagarmala programme, noting that 98 projects worth Rs 937.15 billion have been undertaken over the last 11 years, with 50 already completed. Of this, over Rs 160 billion has been invested in port modernisation and capacity enhancement alone.Paying tribute to freedom fighter V.O. Chidambaranar on his 154th birth anniversary, Shri Sonowal said,“VOC’s Swadeshi spirit through shipping continues to inspire us. Today, we honour that legacy by strengthening our ports with green energy, innovation and self-reliance.”The Minister also expressed gratitude to the people of Tamil Nadu and Thoothukudi, acknowledging their support in enabling the timely execution of development projects.“Our ministry is delivering with speed, scale and commitment — and the trust of the people is central to this success,” he added.The event also witnessed two key MoU signings:Between VOC Port and IPRCL for rail connectivity to the upcoming Outer Harbour projectBetween VOC Port and NTPC to drive green mobility initiativesShri Sonowal was joined by Shri T.K. Ramachandran, Secretary of MoPSW, along with senior officials from the Ministry and the Government of Tamil Nadu. These initiatives collectively underscore India’s commitment to creating a future-ready, sustainable maritime ecosystem. 

Next Story
Infrastructure Energy

BMW Industries partners with IOCL for PNG supply at Bokaro plant

BMW Industries has entered into a strategic partnership with Indian Oil Corporation (IOCL) for the supply of Piped Natural Gas (PNG), reinforcing its commitment to adopting cleaner and more efficient energy sources for its operations.The agreement was signed at the Eastern Region Pipelines (ERPL) headquarters in Kolkata. The partnership is expected to support the company’s upcoming manufacturing facility in Bokaro by facilitating the use of natural gas as a primary energy source.According to the company, the adoption of PNG will help enhance operational efficiency while also contributing to ..

Next Story
Real Estate

Bombay Realty Secures RERA for Three ICC Tower in South Mumbai

Bombay Realty, the real estate arm of Bombay Dyeing and part of the Wadia Group, has received Real Estate Regulatory Authority (RERA) certification for Three ICC – Wing A, the latest luxury residential tower at Island City Center in Mumbai’s Dadar.The RERA registration marks a key milestone in the development timeline and reinforces the company’s focus on regulatory transparency, timely project delivery, and high construction standards.Following the success of One ICC and Two ICC, the upcoming Three ICC tower represents the next phase of the Island City Center development. The project ai..

Next Story
Infrastructure Energy

Flender launches India’s largest wind gearbox test rig in Walajabad

Flender has inaugurated a 13.5 MW wind turbine gearbox test rig at its Walajabad facility near Chennai, marking the largest installation of its kind in India. The new facility is expected to strengthen the company’s manufacturing and testing capabilities while supporting the growing demands of the wind power sector in both domestic and global markets.The test rig was inaugurated on March 5 in the presence of Andreas Evertz, Group CEO, Flender; Lars Wiegemann, Vice President Wind Gears, Flender; and Vinod Shetty, CEO, Flender India, along with key industry customers and stakeholders.The insta..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement