Mandovi, Ripley Form JV for $24M Shipyard at Kolkata Port
PORTS & SHIPPING

Mandovi, Ripley Form JV for $24M Shipyard at Kolkata Port

Goa-based Mandovi Drydocks and Kolkata’s Ripley Stevedoring and Shore Handling Pvt Ltd have formed an equal joint venture to develop a shipbuilding and repair facility at Syama Prasad Mookerjee Port (formerly Kolkata Port). The venture will lease 121 acres of port land for 30 years, with an initial investment of $24 million.

The facility will initially focus on building 6,000-8,000-ton ships before scaling up to 15,000 and 25,000-ton vessels within the first five to six years. Eventually, the partners plan to construct Panamax-size ships, with total investments projected to reach $240 million across all phases. The lease deal, finalized through a tender process, is set for execution in the coming days.

Strengthening India’s Shipbuilding Footprint Mandovi Drydocks operates shipyards in Bicholim (North Goa), Rassaim (South Goa), and Dabol (Maharashtra). Meanwhile, Ripley Group, founded by Swapan Sadhan Bose, has a strong foothold in port operations at Haldia, Paradip, and Visakhapatnam and has expanded into ship ownership and management via Dubai-based Panbulk Shipping DMCC, led by Shoumik Bose.

The initiative aligns with India’s push to monetize major port land by leasing it to private shipyards for shipbuilding and repairs. The government aims to strengthen domestic shipbuilding capabilities amid increasing global demand.

Maritime Sector Expands with New Projects Recent developments in India's maritime sector underscore growing private-sector involvement. Last year, Cochin Shipyard Ltd inaugurated a $116 million international ship repair facility at Willingdon Island, Cochin Port, enhancing the country’s ship maintenance capacity.

Additionally, Deendayal Port Authority (Kandla, Gujarat) has invited bids for 2,000 acres of land on a 30-year lease to develop an integrated shipbuilding cluster, further demonstrating the sector’s rapid expansion.

A senior industry executive noted, “This project will add much-needed shipbuilding and repair capacity in the eastern region, reinforcing India's position in the global maritime sector.”

Image Source: Maritime Gateway


"Join industry leaders at RAHSTA Expo, India's premier platform for roads, highways and traffic infrastructure. Register now to explore innovations, network with experts and shape the future of mobility."

Goa-based Mandovi Drydocks and Kolkata’s Ripley Stevedoring and Shore Handling Pvt Ltd have formed an equal joint venture to develop a shipbuilding and repair facility at Syama Prasad Mookerjee Port (formerly Kolkata Port). The venture will lease 121 acres of port land for 30 years, with an initial investment of $24 million. The facility will initially focus on building 6,000-8,000-ton ships before scaling up to 15,000 and 25,000-ton vessels within the first five to six years. Eventually, the partners plan to construct Panamax-size ships, with total investments projected to reach $240 million across all phases. The lease deal, finalized through a tender process, is set for execution in the coming days.Strengthening India’s Shipbuilding Footprint Mandovi Drydocks operates shipyards in Bicholim (North Goa), Rassaim (South Goa), and Dabol (Maharashtra). Meanwhile, Ripley Group, founded by Swapan Sadhan Bose, has a strong foothold in port operations at Haldia, Paradip, and Visakhapatnam and has expanded into ship ownership and management via Dubai-based Panbulk Shipping DMCC, led by Shoumik Bose. The initiative aligns with India’s push to monetize major port land by leasing it to private shipyards for shipbuilding and repairs. The government aims to strengthen domestic shipbuilding capabilities amid increasing global demand. Maritime Sector Expands with New Projects Recent developments in India's maritime sector underscore growing private-sector involvement. Last year, Cochin Shipyard Ltd inaugurated a $116 million international ship repair facility at Willingdon Island, Cochin Port, enhancing the country’s ship maintenance capacity. Additionally, Deendayal Port Authority (Kandla, Gujarat) has invited bids for 2,000 acres of land on a 30-year lease to develop an integrated shipbuilding cluster, further demonstrating the sector’s rapid expansion. A senior industry executive noted, “This project will add much-needed shipbuilding and repair capacity in the eastern region, reinforcing India's position in the global maritime sector.”Image Source: Maritime Gateway

Next Story
Infrastructure Urban

ABS Marine Sees CRISIL Credit Rating Upgrade

ABS Marine Services has secured an upgrade to its long term and short term credit ratings from CRISIL, reflecting improved profitability and revenue growth through long term contracts. CRISIL moved the long term rating from BBB+/Stable to A-/Stable and revised the short term rating from A2 to A2+. The action signals strengthened financial metrics and operational resilience. The company benefited from durable client relationships with firms such as ONGC and Schlumberger. The rating decision followed stronger cash flows and an enlarged bank loan facility, which increased from Rs 3,705 million (m..

Next Story
Infrastructure Transport

Project BRAHMANK Marks 16 Years Of Strategic Roads In Arunachal

Project BRAHMANK is marking 16 years of work to establish strategic road and bridge links across Arunachal Pradesh, maintaining and developing 811 kilometres of roads and nearly 86 bridges that range from small culverts to large steel and arch bridges. These transport links are described as critical for ensuring year-round movement of defence personnel, equipment and essential supplies while improving everyday travel for people in remote villages. The project balances national security requirements with regional development by focusing on reliable access in challenging terrain. Notable enginee..

Next Story
Infrastructure Transport

Longleng CSOs Give One Week Ultimatum Over Two-Lane Highway

Civil society organisations (CSOs) in Longleng district have demanded immediate restoration of the deteriorating Changtongya–Longleng two-lane road and sought a detailed status report on the stalled construction within one week. The demand followed a consultative meeting convened under the Phom Peoples' Council (PPC) to discuss welfare and development concerns. PPC president YB Angam Phom said prolonged non-maintenance had caused hardship to commuters and affected transportation, local commerce and the district's development. The meeting urged authorities to undertake immediate restoration a..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement