+
PM Modi inaugurates Varanasi smart city projects worth Rs 50.92 cr
SMART CITIES

PM Modi inaugurates Varanasi smart city projects worth Rs 50.92 cr

On Monday, Prime Minister Narendra Modi inaugurated several projects under Varanasi Smart City covering the basement parking and park at Townhall, ghat revitalisation and façade restoration work at five ghats, beautification and conservation of Chakra Pond, and Bio-CNG Plant at Gau Ashray Kendra, Shahanshahpur.

As per the spokesperson of Smart City, a fund of Rs 50.92 crore was used for the implementation of these projects. For helping tourists and visitors, the ghat revitalisation and façade restoration work was done at Ahilyabai, Sheetla, Munshi, Dashashwamedh and Darbhanga ghats for Rs 2.02 crore.

In the facade development work of the buildings located on the ghats, essentially acrylic paint, graffiti, stains on the buildings were removed, and the dilapidated stone, balcony, railing were fixed and replaced.

Besides, crack repair, removal of cement plaster on buildings and installation of lime plaster and lime wash were also done. While maintaining the buildings as heritage, its façade was restored to its original design and glory.

The repair and replacement work of dilapidated steps has been done on the ghats, with which the original image has been rendered by replacing the thin stone cladding and CC base at Dashashwamedh Ghat. Under the Varanasi Smart City, basement parking and a park on the ground level have been built at the town hall at Maidagin crossing for Rs 23.31 crore to ease traffic congestion and solve parking issues.

The parking has a capacity of 200 two-wheelers and 150 four-wheelers along with the facility of smart parking solution, provided with fire-fighting standards and CCTV surveillance. The rebuilt park will have amenities such as a yoga garden, open gym, vending zone, gazebo, jogging track, herbal garden, toilets and drinking water.

The beautification and redevelopment work of Chakra Pond situated in the Sigra area was done for Rs 2.59 crore. Aerated fountain, jogging track, pergola, gazebo, open gym, pathways, toilets and drinking water facilities are provided, along with the paved boundary around the pond. A gaushala (cowshed), run by the Varanasi Municipal Corporation with a capacity of 300 cows, is situated in Shahanshapur village, Raja Talab Tehsil. It has approximately 30,000 cattle in a radius of 20 km with an average emission of 5 to 10 kg of cow dung.

Image Source


Also read: Large-scale irregularities detected in UP smart city projects

On Monday, Prime Minister Narendra Modi inaugurated several projects under Varanasi Smart City covering the basement parking and park at Townhall, ghat revitalisation and façade restoration work at five ghats, beautification and conservation of Chakra Pond, and Bio-CNG Plant at Gau Ashray Kendra, Shahanshahpur. As per the spokesperson of Smart City, a fund of Rs 50.92 crore was used for the implementation of these projects. For helping tourists and visitors, the ghat revitalisation and façade restoration work was done at Ahilyabai, Sheetla, Munshi, Dashashwamedh and Darbhanga ghats for Rs 2.02 crore. In the facade development work of the buildings located on the ghats, essentially acrylic paint, graffiti, stains on the buildings were removed, and the dilapidated stone, balcony, railing were fixed and replaced. Besides, crack repair, removal of cement plaster on buildings and installation of lime plaster and lime wash were also done. While maintaining the buildings as heritage, its façade was restored to its original design and glory. The repair and replacement work of dilapidated steps has been done on the ghats, with which the original image has been rendered by replacing the thin stone cladding and CC base at Dashashwamedh Ghat. Under the Varanasi Smart City, basement parking and a park on the ground level have been built at the town hall at Maidagin crossing for Rs 23.31 crore to ease traffic congestion and solve parking issues. The parking has a capacity of 200 two-wheelers and 150 four-wheelers along with the facility of smart parking solution, provided with fire-fighting standards and CCTV surveillance. The rebuilt park will have amenities such as a yoga garden, open gym, vending zone, gazebo, jogging track, herbal garden, toilets and drinking water. The beautification and redevelopment work of Chakra Pond situated in the Sigra area was done for Rs 2.59 crore. Aerated fountain, jogging track, pergola, gazebo, open gym, pathways, toilets and drinking water facilities are provided, along with the paved boundary around the pond. A gaushala (cowshed), run by the Varanasi Municipal Corporation with a capacity of 300 cows, is situated in Shahanshapur village, Raja Talab Tehsil. It has approximately 30,000 cattle in a radius of 20 km with an average emission of 5 to 10 kg of cow dung. Image SourceAlso read: Large-scale irregularities detected in UP smart city projects

Related Stories

Gold Stories

Next Story
Infrastructure Urban

Assam Gets Approval For 350,000 PMAY Homes

Assam Chief Minister Himanta Biswa Sarma met Union Agriculture Minister Shivraj Singh Chouhan in New Delhi, where the minister handed an approval document for 310,000 new homes under the Pradhan Mantri Awas Yojana. The chief minister subsequently posted on X expressing gratitude and noting that the minister had formally handed approval for 380,000 homes as well. The release and the social media post contained varying figures, with broader references to 350,000 homes reported in some summaries. The approvals carry central assistance equivalent to Rs 50 billion (bn), corresponding to the five th..

Next Story
Infrastructure Urban

KPIGreen Achieves Highest Energised Capacity of 630+ MW DC

KPI Green Energy energised more than 630 MW DC of capacity in the June to August quarter, marking the highest quarterly addition in the company's history. The capacity was brought online across its Independent Power Producer (IPP) and Engineering, Procurement and Construction (EPC) businesses. The company said the achievement reflected the scale, speed and consistency of its project execution engine. The firm described the quarter as a material operational milestone since its founding. The milestone covers a diversified mix of IPP assets and projects executed under the EPC vertical, spanning u..

Next Story
Infrastructure Energy

Adani Energy Solutions Wins Rs 47 bn Maharashtra Transmission Project

Adani Energy Solutions has won a transmission contract in Maharashtra valued at Rs 47 billion (Rs 47 bn) to evacuate 4,500 megawatt (MW) of renewable and storage power. The company informed exchanges that the project will facilitate pumped storage potential near Satara and strengthen the inter-regional corridor between the Western and Southern grids. The award follows a competitive bidding process and will support renewable energy evacuation to major load centres in the state. The scope includes establishment of a 765/400 kV substation at Satara, construction of a Kolhapur-Satara 765 kV double..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code