AMC invests in Water Infrastructure for 56 lakh residents by 2045
WATER & WASTE

AMC invests in Water Infrastructure for 56 lakh residents by 2045

By the year 2045, the western regions of Bopal-Ghuma, Ambli, and the areas along SP Ring Road and SG Road within the civic jurisdiction are projected to house a population of 56 lakh people. To cater to their water needs, an estimated 1,022 million litres per day (MLD) of potable water will be required. In anticipation of this surge in demand, the Ahmedabad Municipal Corporation (AMC) is strategically planning additional infrastructure.

Recently, the AMC acquired a parcel of land measuring 1 lakh square metres (10 hectares) adjacent to the Jaspur water treatment plant. This acquisition, made at a cost of Rs 87.2 million from the state government, is intended for the establishment of a new 400 MLD water treatment plant. The new facility is earmarked to serve the burgeoning population in the aforementioned areas.

According to Devang Dani, the chairman of AMC's standing committee, the projected population growth is expected to reach 34 lakh in areas such as Ghatlodia, Gota, Thaltej, Bodakdev, Vejalpur, Jodhpur, Sarkhej, Maktampura, Ambli, and Shilaj in the coming years. The water requirements for these regions are estimated to be 620.12 MLD in 2030 and are projected to rise to 1,022.77 MLD by 2045. In response to this, the AMC has initiated construction work to enhance the capacity of the Jaspur water treatment plant from 400 MLD to 600 MLD.

To meet the future water needs of the city, the AMC had previously sanctioned Rs 910 million for the installation of a new main water trunk line in the areas adjacent to the affordable housing zone along the western sections of SP Ring Road and SG Road. Additionally, a new water trunk line will be laid from Kotarpur to Pramukh Swami Road in Motera.

As part of the ongoing infrastructure development, a 2,200 mm diameter trunk line with a capacity of 400 MLD has been laid from the Jaspur water treatment plant to the 30-lakh-litre overhead tank at Vaishnodevi Devi. This tank will be connected to three water lines, ensuring a robust water supply system for the growing population.

"Join industry leaders at RAHSTA Expo, India's premier platform for roads, highways and traffic infrastructure. Register now to explore innovations, network with experts and shape the future of mobility."

By the year 2045, the western regions of Bopal-Ghuma, Ambli, and the areas along SP Ring Road and SG Road within the civic jurisdiction are projected to house a population of 56 lakh people. To cater to their water needs, an estimated 1,022 million litres per day (MLD) of potable water will be required. In anticipation of this surge in demand, the Ahmedabad Municipal Corporation (AMC) is strategically planning additional infrastructure. Recently, the AMC acquired a parcel of land measuring 1 lakh square metres (10 hectares) adjacent to the Jaspur water treatment plant. This acquisition, made at a cost of Rs 87.2 million from the state government, is intended for the establishment of a new 400 MLD water treatment plant. The new facility is earmarked to serve the burgeoning population in the aforementioned areas. According to Devang Dani, the chairman of AMC's standing committee, the projected population growth is expected to reach 34 lakh in areas such as Ghatlodia, Gota, Thaltej, Bodakdev, Vejalpur, Jodhpur, Sarkhej, Maktampura, Ambli, and Shilaj in the coming years. The water requirements for these regions are estimated to be 620.12 MLD in 2030 and are projected to rise to 1,022.77 MLD by 2045. In response to this, the AMC has initiated construction work to enhance the capacity of the Jaspur water treatment plant from 400 MLD to 600 MLD. To meet the future water needs of the city, the AMC had previously sanctioned Rs 910 million for the installation of a new main water trunk line in the areas adjacent to the affordable housing zone along the western sections of SP Ring Road and SG Road. Additionally, a new water trunk line will be laid from Kotarpur to Pramukh Swami Road in Motera. As part of the ongoing infrastructure development, a 2,200 mm diameter trunk line with a capacity of 400 MLD has been laid from the Jaspur water treatment plant to the 30-lakh-litre overhead tank at Vaishnodevi Devi. This tank will be connected to three water lines, ensuring a robust water supply system for the growing population.

Next Story
Infrastructure Urban

ABS Marine Sees CRISIL Credit Rating Upgrade

ABS Marine Services has secured an upgrade to its long term and short term credit ratings from CRISIL, reflecting improved profitability and revenue growth through long term contracts. CRISIL moved the long term rating from BBB+/Stable to A-/Stable and revised the short term rating from A2 to A2+. The action signals strengthened financial metrics and operational resilience. The company benefited from durable client relationships with firms such as ONGC and Schlumberger. The rating decision followed stronger cash flows and an enlarged bank loan facility, which increased from Rs 3,705 million (m..

Next Story
Infrastructure Transport

Project BRAHMANK Marks 16 Years Of Strategic Roads In Arunachal

Project BRAHMANK is marking 16 years of work to establish strategic road and bridge links across Arunachal Pradesh, maintaining and developing 811 kilometres of roads and nearly 86 bridges that range from small culverts to large steel and arch bridges. These transport links are described as critical for ensuring year-round movement of defence personnel, equipment and essential supplies while improving everyday travel for people in remote villages. The project balances national security requirements with regional development by focusing on reliable access in challenging terrain. Notable enginee..

Next Story
Infrastructure Transport

Longleng CSOs Give One Week Ultimatum Over Two-Lane Highway

Civil society organisations (CSOs) in Longleng district have demanded immediate restoration of the deteriorating Changtongya–Longleng two-lane road and sought a detailed status report on the stalled construction within one week. The demand followed a consultative meeting convened under the Phom Peoples' Council (PPC) to discuss welfare and development concerns. PPC president YB Angam Phom said prolonged non-maintenance had caused hardship to commuters and affected transportation, local commerce and the district's development. The meeting urged authorities to undertake immediate restoration a..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement