BMC plans real-time dashboard to improve waste management system
WATER & WASTE

BMC plans real-time dashboard to improve waste management system

The Brihanmumbai Municipal Corporation (BMC) plans to have a real-time dashboard that will show details of steps taken by the municipal corporation in every ward on garbage collection and disposal to improve waste management in the city.

The real-time dashboard will have information about the performance of bulk generators in waste management. It will also have daily updates on how much garbage each administrative ward is producing, collection, segregation, disposal, and steps taken by housing societies for treating their waste at the source.

Currently, Mumbai produces 6,500 metric tonnes of garbage daily, as per the data. According to the solid waste management (SWM) rules, 2016, the corporation is required to achieve waste management at source, decreasing the dependability on dumping grounds.

Part of the SWM rules mandated that each bulk waste generator — which means housing societies or commercial establishments — having an area above 20,000 square meters or producing 100 kg waste every day should treat their waste in their premises.

The purpose of beginning a real-time dashboard is to involve public participation. Anybody can see the waste management details of the city and can inform BMC if the rules are being followed or not. Citizens’ behavioral change is also necessary for the success of an effective city's waste management, said Dr Sangeeta Hasnale, Deputy Municipal Commissioner, Solid Waste Management department.

BMC started a rebate in property tax — offering a 10% rebate in overall property tax bills to encourage housing societies to set up composting units.

The BMC had also launched a citizen survey asking responses on the civic body’s waste management to develop a vision plan for 2030. The BMC is now analysing the waste generated in nature.

As per the data, there are over 3,100 bulk generators in Mumbai. However, only around 50% are complying with rules.

Image Source


Also read: North Delhi municipal corp to develop plastic waste processing plant

The Brihanmumbai Municipal Corporation (BMC) plans to have a real-time dashboard that will show details of steps taken by the municipal corporation in every ward on garbage collection and disposal to improve waste management in the city. The real-time dashboard will have information about the performance of bulk generators in waste management. It will also have daily updates on how much garbage each administrative ward is producing, collection, segregation, disposal, and steps taken by housing societies for treating their waste at the source. Currently, Mumbai produces 6,500 metric tonnes of garbage daily, as per the data. According to the solid waste management (SWM) rules, 2016, the corporation is required to achieve waste management at source, decreasing the dependability on dumping grounds. Part of the SWM rules mandated that each bulk waste generator — which means housing societies or commercial establishments — having an area above 20,000 square meters or producing 100 kg waste every day should treat their waste in their premises. The purpose of beginning a real-time dashboard is to involve public participation. Anybody can see the waste management details of the city and can inform BMC if the rules are being followed or not. Citizens’ behavioral change is also necessary for the success of an effective city's waste management, said Dr Sangeeta Hasnale, Deputy Municipal Commissioner, Solid Waste Management department. BMC started a rebate in property tax — offering a 10% rebate in overall property tax bills to encourage housing societies to set up composting units. The BMC had also launched a citizen survey asking responses on the civic body’s waste management to develop a vision plan for 2030. The BMC is now analysing the waste generated in nature. As per the data, there are over 3,100 bulk generators in Mumbai. However, only around 50% are complying with rules. Image SourceAlso read: North Delhi municipal corp to develop plastic waste processing plant

Next Story
Infrastructure Transport

Taking Flight!

When Prime Minister Narendra Modi inaugurated the Navi Mumbai International Airport (NMIA) on October 8, 2025, it marked far more than the opening of another terminal – it signified a turning point in India’s aviation and infrastructure narrative. Developed by Adani Airport Holdings Ltd (AAHL) in partnership with the City and Industrial Development Corporation (CIDCO), NMIA represents a bold vision of how modern India intends to connect its people, power its economy and project its identity on the global stage.“The Navi Mumbai International Airport is a project that exemplifies the visio..

Next Story
Infrastructure Transport

Highway Guidelines 2.0

In August 2025, a Public Accounts Committee comprising members of the Lok Sabha and Rajya Sabha presented a report, ‘Levy and Regulation of Fees, Tariffs, User Charges etc on Public Infrastructure and Other Public Utilities in the context of the Ministry of Road Transport and Highways (MoRTH) and the National Highways Authority of India (NHAI).Having examined present design accountability, subcontracting, pavement failures, emergency response mechanisms, toll reforms, service quality, stakeholder consultations and other aspects, the Committee presented recommendations covering the planning a..

Next Story
Infrastructure Transport

Railways approves major upgrade for Telangana traction lines

The Ministry of Railways has approved the upgradation of the electric traction system in two crucial railway sections — Medchal–Mudkhed (225 km) and Mahbubnagar–Dhone (184 km). The projects, costing Rs 1.93 billion and Rs 1.23 billion respectively, will enhance the electric traction capacity from 1X25 KV to 2X25 KV. The work includes modifications to circuit breakers and switching stations, along with the installation of additional conductors. These routes serve as vital links between Northern and Southern India via Hyderabad. Once completed, the upgraded system will reduce voltage dro..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?