Pimpri-Chinchwad trails in waste management of housing societies
WATER & WASTE

Pimpri-Chinchwad trails in waste management of housing societies

The industrial town of Pimpri-Chinchwad has failed to implement waste management rules for housing societies.

According to the solid waste management rules, it is compulsory for bulk wet waste producers such as housing societies that generate over 100 kg of wet garbage waste every day to treat it on-premises.

With a total of 2,000 housing societies, only 128 of them have availed the facility.

In Pune out of 4,078 housing societies, 2,843 housing societies have established a bulk wet waste disposal facility inside their premises.

The Solid Waste Management Rules, 2016 (SWMR) were issued in April 2016, to develop a framework for scientific waste management over urban settlements.

Ajit Deshmukh, head of the solid waste management department of Pune Municipal Corporation (PMC), told the media that PMC began a drive of issuing notices and collecting penalties from housing societies.

PMC also warned societies that if they do not process wet garbage produced in their premises, the civic body will stop picking it up. The PMC collected penalties worth Rs 2.5 lakh from 46 housing societies.

Sanjeevan Sangle, Chairman, Chikhali-Moshi Cooperative Housing Societies, told the media that the Pimpri-Chinchwad Municipal Corporation (PCMC) is lagging as the builders never gave amenities to the housing societies still, the PCMC building permission department gave completion certificates to these builders.

In the meantime, Pimple Saudagar’s Roseland Residency got a national award for its solid waste management (SWM) action. Santosh Mhaskar, chairman of the society, said that they began the disposal unit before the law came into existence.

Image Source


Also read: Pimpri Chinchwad Municipal Corporation to add 1,300 hectares of land

Also read: Warangal to soon become free of plastic waste

The industrial town of Pimpri-Chinchwad has failed to implement waste management rules for housing societies. According to the solid waste management rules, it is compulsory for bulk wet waste producers such as housing societies that generate over 100 kg of wet garbage waste every day to treat it on-premises. With a total of 2,000 housing societies, only 128 of them have availed the facility. In Pune out of 4,078 housing societies, 2,843 housing societies have established a bulk wet waste disposal facility inside their premises. The Solid Waste Management Rules, 2016 (SWMR) were issued in April 2016, to develop a framework for scientific waste management over urban settlements. Ajit Deshmukh, head of the solid waste management department of Pune Municipal Corporation (PMC), told the media that PMC began a drive of issuing notices and collecting penalties from housing societies. PMC also warned societies that if they do not process wet garbage produced in their premises, the civic body will stop picking it up. The PMC collected penalties worth Rs 2.5 lakh from 46 housing societies. Sanjeevan Sangle, Chairman, Chikhali-Moshi Cooperative Housing Societies, told the media that the Pimpri-Chinchwad Municipal Corporation (PCMC) is lagging as the builders never gave amenities to the housing societies still, the PCMC building permission department gave completion certificates to these builders. In the meantime, Pimple Saudagar’s Roseland Residency got a national award for its solid waste management (SWM) action. Santosh Mhaskar, chairman of the society, said that they began the disposal unit before the law came into existence. Image Source Also read: Pimpri Chinchwad Municipal Corporation to add 1,300 hectares of land Also read: Warangal to soon become free of plastic waste

Next Story
Infrastructure Transport

Metro Line 2B Phase 1 to Boost Realty in Mumbai’s Eastern Suburbs

Mumbai’s real estate sector is set for a major boost as Phase 1 of Metro Line 2B, between Mandale and Diamond Garden, nears completion. The Mumbai Metropolitan Region Development Authority (MMRDA) has confirmed that mandatory rectifications are done, and inspections by the Commissioner of Metro Railway Safety (CMRS) have been carried out. The 5.39-km stretch with five stations forms part of the larger DN Nagar–Mandale corridor, designed to ease congestion and improve east–west connectivity. Passenger operations are expected by December 2025, with the full line slated for 2027. ..

Next Story
Resources

WattPower wins Best Inverter award at Global Solar Expo 2025

WattPower, a leading renewable energy solutions provider, has won the award for “Best Inverter in the Utility Segment” at the Global Solar Expo 2025. The recognition underscores the company’s commitment to delivering reliable, high-performance and future-ready solar solutions for large-scale projects. At the forefront of utility-scale solar, WattPower manufactures advanced string inverters that directly feed power into the Indian grid. With robust technology, high-quality components and comprehensive product lifecycle support, its solutions stand among the most sophisticated in the ..

Next Story
Real Estate

Awfis delivers 67,000 sq. ft. innovation hub for eBay in Bengaluru

Awfis Space Solutions, India’s largest flexible workspace provider and the first publicly listed workspace solutions platform, has partnered with eBay to establish a 67,000 sq. ft. innovation hub at Embassy Tech Village, Bengaluru. The mandate covers design, build and management of the new office, which will act as a strategic hub supporting diverse functions and accelerating eBay’s AI-first commerce strategy. The centre will focus on artificial intelligence, engineering, product development and applied research, strengthening eBay’s growth in India. Embassy Tech Village, North Beng..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?