Pimpri-Chinchwad trails in waste management of housing societies
WATER & WASTE

Pimpri-Chinchwad trails in waste management of housing societies

The industrial town of Pimpri-Chinchwad has failed to implement waste management rules for housing societies.

According to the solid waste management rules, it is compulsory for bulk wet waste producers such as housing societies that generate over 100 kg of wet garbage waste every day to treat it on-premises.

With a total of 2,000 housing societies, only 128 of them have availed the facility.

In Pune out of 4,078 housing societies, 2,843 housing societies have established a bulk wet waste disposal facility inside their premises.

The Solid Waste Management Rules, 2016 (SWMR) were issued in April 2016, to develop a framework for scientific waste management over urban settlements.

Ajit Deshmukh, head of the solid waste management department of Pune Municipal Corporation (PMC), told the media that PMC began a drive of issuing notices and collecting penalties from housing societies.

PMC also warned societies that if they do not process wet garbage produced in their premises, the civic body will stop picking it up. The PMC collected penalties worth Rs 2.5 lakh from 46 housing societies.

Sanjeevan Sangle, Chairman, Chikhali-Moshi Cooperative Housing Societies, told the media that the Pimpri-Chinchwad Municipal Corporation (PCMC) is lagging as the builders never gave amenities to the housing societies still, the PCMC building permission department gave completion certificates to these builders.

In the meantime, Pimple Saudagar’s Roseland Residency got a national award for its solid waste management (SWM) action. Santosh Mhaskar, chairman of the society, said that they began the disposal unit before the law came into existence.

Image Source


Also read: Pimpri Chinchwad Municipal Corporation to add 1,300 hectares of land

Also read: Warangal to soon become free of plastic waste

The industrial town of Pimpri-Chinchwad has failed to implement waste management rules for housing societies. According to the solid waste management rules, it is compulsory for bulk wet waste producers such as housing societies that generate over 100 kg of wet garbage waste every day to treat it on-premises. With a total of 2,000 housing societies, only 128 of them have availed the facility. In Pune out of 4,078 housing societies, 2,843 housing societies have established a bulk wet waste disposal facility inside their premises. The Solid Waste Management Rules, 2016 (SWMR) were issued in April 2016, to develop a framework for scientific waste management over urban settlements. Ajit Deshmukh, head of the solid waste management department of Pune Municipal Corporation (PMC), told the media that PMC began a drive of issuing notices and collecting penalties from housing societies. PMC also warned societies that if they do not process wet garbage produced in their premises, the civic body will stop picking it up. The PMC collected penalties worth Rs 2.5 lakh from 46 housing societies. Sanjeevan Sangle, Chairman, Chikhali-Moshi Cooperative Housing Societies, told the media that the Pimpri-Chinchwad Municipal Corporation (PCMC) is lagging as the builders never gave amenities to the housing societies still, the PCMC building permission department gave completion certificates to these builders. In the meantime, Pimple Saudagar’s Roseland Residency got a national award for its solid waste management (SWM) action. Santosh Mhaskar, chairman of the society, said that they began the disposal unit before the law came into existence. Image Source Also read: Pimpri Chinchwad Municipal Corporation to add 1,300 hectares of land Also read: Warangal to soon become free of plastic waste

Next Story
Infrastructure Transport

MMRDA advances 250 m on Orange Gate–Marine Drive tunnel

The Mumbai Metropolitan Region Development Authority (MMRDA) has completed 250 m of underground tunnelling for the Orange Gate–Marine Drive Urban Road Tunnel using India’s largest slurry shield tunnel boring machine (TBM) deployed for an urban road project.The project involves twin tunnels extending over 7 km beneath critical transport corridors, including Central Railway, Western Railway and Metro Line 3. The work requires high-precision engineering to navigate densely developed urban infrastructure.Once completed, the tunnel is expected to reduce travel time between Orange Gate and Marin..

Next Story
Infrastructure Urban

Hindustan Zinc Pays Rs 188.46 Billion in FY26

Hindustan Zinc contributed Rs 188.46 billion to the public exchequer in FY 2025-26, according to its 9th Tax Transparency Report. The contribution, equivalent to 46 per cent of the company’s revenue, included direct and indirect taxes, government royalties, dividends to the Government of India, withholding taxes and other statutory levies.The company’s five-year cumulative contribution to the exchequer stood at Rs 915.72 billion. In FY26, Hindustan Zinc reported revenue of Rs 408.44 billion, EBITDA of Rs 221.62 billion and profit after tax of Rs 138.32 billion. It also achieved its highest..

Next Story
Infrastructure Urban

World of Concrete India 2026 Opens in Mumbai

Informa Markets in India will host the 12th edition of World of Concrete India 2026 from 3–5 June 2026 at the Bombay Exhibition Centre, Mumbai. The specialised B2B exhibition will bring together manufacturers, suppliers, contractors, developers, architects, consultants, infrastructure companies, project leaders and government stakeholders.The event is expected to feature over 350 brands and more than 18,000 trade professionals. It will cover concrete and cement, dry mortar, precast technologies, formwork, construction chemicals, industrial and commercial flooring, scaffolding, safety solutio..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement