+
Telangana government aims for Waste-to-Power, Recycling Milestones
WATER & WASTE

Telangana government aims for Waste-to-Power, Recycling Milestones

The Telangana government has announced ambitious plans to generate 101 MW of power from waste produced in Hyderabad by the end of the upcoming year. Additionally, they aim to produce 500 tonnes of tiles using construction and demolition waste. Minister K T Rama Rao, responsible for IT, Industries, and MAUD, shared these targets during his keynote address at the Administrative Staff College of India (ASCI) on World Environment Day.

The minister highlighted the successful establishment of recycling units that utilise flowers from prominent temples in Vemulawada, Dharmapuri, and Yadadri. He emphasised the involvement of self-help groups of women who have been converting waste into profit. Currently, there are 206 dry recycling centers, including 87 managed by women SHG groups, generating a monthly income of Rs 5.1 million.

As part of the "Rethink - Reduce, Reuse and Recycle (RRR)" initiative, the government has set up a total of 1,962 RRR centres in 142 urban local bodies (ULBs) to collect used items such as plastic, books, clothes, and footwear. Since May 20, 2023, over 200 tonnes of used items have been collected in these centres and will be refurbished, reused, or remade into new products.

The minister also stressed the importance of phasing out legacy dumps through bio-mining, allocating Rs 1,786 million to clear accumulated garbage dumps in nine clusters. Additionally, the government plans to invest Rs 4,273 million in fecal sludge treatment in 139 ULBs to convert human waste into manure. The objective is to achieve 1001 per cent sewerage-free status for Hyderabad by August 2023 by establishing 200 MLD capacity sewerage treatment plants, which will also produce biogas.

To ensure consistent progress in waste reuse and recycling, KTR has instructed officials to observe every Saturday as 'RRR day' for discussing advancements in waste management. He also revealed plans to establish a Hyderabad Habitat Centre in Khajaguda, similar to the one in New Delhi, as per Chief Minister K Chandrasekar Rao's approval. Moreover, a Circular Economy Cell will be established at the HMWSSB head office, headed by a CGM (E), to expedite circular economy initiatives.

In collaboration with ASCI and the Environmental Surveillance Laboratory, the Telangana government has launched the 'Rethink - Reduce, Reuse and Recycle (RRR) Knowledge Hub' to further support waste management and sustainability efforts.  

The Telangana government has announced ambitious plans to generate 101 MW of power from waste produced in Hyderabad by the end of the upcoming year. Additionally, they aim to produce 500 tonnes of tiles using construction and demolition waste. Minister K T Rama Rao, responsible for IT, Industries, and MAUD, shared these targets during his keynote address at the Administrative Staff College of India (ASCI) on World Environment Day. The minister highlighted the successful establishment of recycling units that utilise flowers from prominent temples in Vemulawada, Dharmapuri, and Yadadri. He emphasised the involvement of self-help groups of women who have been converting waste into profit. Currently, there are 206 dry recycling centers, including 87 managed by women SHG groups, generating a monthly income of Rs 5.1 million. As part of the Rethink - Reduce, Reuse and Recycle (RRR) initiative, the government has set up a total of 1,962 RRR centres in 142 urban local bodies (ULBs) to collect used items such as plastic, books, clothes, and footwear. Since May 20, 2023, over 200 tonnes of used items have been collected in these centres and will be refurbished, reused, or remade into new products. The minister also stressed the importance of phasing out legacy dumps through bio-mining, allocating Rs 1,786 million to clear accumulated garbage dumps in nine clusters. Additionally, the government plans to invest Rs 4,273 million in fecal sludge treatment in 139 ULBs to convert human waste into manure. The objective is to achieve 1001 per cent sewerage-free status for Hyderabad by August 2023 by establishing 200 MLD capacity sewerage treatment plants, which will also produce biogas. To ensure consistent progress in waste reuse and recycling, KTR has instructed officials to observe every Saturday as 'RRR day' for discussing advancements in waste management. He also revealed plans to establish a Hyderabad Habitat Centre in Khajaguda, similar to the one in New Delhi, as per Chief Minister K Chandrasekar Rao's approval. Moreover, a Circular Economy Cell will be established at the HMWSSB head office, headed by a CGM (E), to expedite circular economy initiatives. In collaboration with ASCI and the Environmental Surveillance Laboratory, the Telangana government has launched the 'Rethink - Reduce, Reuse and Recycle (RRR) Knowledge Hub' to further support waste management and sustainability efforts.  

Next Story
Infrastructure Transport

MMRDA Installs 325-Tonne Steel Spans on Mumbai Metro Line 4

The Mumbai Metropolitan Region Development Authority (MMRDA) has achieved a key construction milestone on Metro Line 4 with the successful installation of three large steel spans at Bhandup West during overnight operations.The spans, together weighing 325 metric tonnes, were launched using eight heavy-duty cranes and 12 multi-axle vehicles. The operation required precise engineering and meticulous planning to minimise disruption in the densely populated suburban area.Due to effective inter-agency coordination, the work—originally scheduled across four nights—was completed within just two n..

Next Story
Infrastructure Transport

CMRL Targets March 2027 Opening for Vadapalani–Panagal Park

Chennai Metro Rail Limited (CMRL) is progressing as scheduled to open the Vadapalani–Panagal Park section of Phase II’s Corridor 4 by March 2027. The 3.5 km underground stretch is part of the 26.1 km Corridor 4 connecting Lighthouse with Poonamallee Bypass.Construction activities are advancing steadily, with tunnelling works between Vadapalani and Panagal Park already completed. Track-laying operations are expected to commence shortly. At Panagal Park station, structural works have reached the concourse and platform levels, while excavation continues at the lowest level.CMRL is also consid..

Next Story
Infrastructure Transport

Maha-Metro Invites Pune Metro Civil Maintenance Bids

Maharashtra Metro Rail Corporation Limited (Maha-Metro) has invited bids for the annual civil maintenance contract of the Pune Metro Rail Project. The tender, bearing ID and number P1-O&M-20/2025, is scheduled to close on 23 February 2026, with a pre-bid meeting slated for 10 February 2026. The earnest money deposit (EMD) for the contract is Rs 3,50,500, and the duration of the contract is one year.The scope of work includes annual civil maintenance of 28 elevated and underground stations, 28.079 km of elevated viaduct including steel bridges, 12.15 km of tunnels, and two depots under the ..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Open In App