BIM for constructing bridges efficiently
ROADS & HIGHWAYS

BIM for constructing bridges efficiently

Trimble’s construction modelling software Tekla Structures is a comprehensive bridge information modelling (BrIM) solution for bridges and other civil structures. With this, engineering and construction companies can deliver any type or bridge or civil structure; including beam or box girder bridges, truss bridges, arch or tied arch bridges, cantilever bridges, suspension bridges, cable-stayed bridges and underpasses or box culverts. “Users can create a constructible, parametric model, which means each object holds its own data that can then be used for fabrication, erection, construction on-site and asset management during the maintenance of the bridge,” says Paul Wallett, Regional Director, Trimble Solutions Middle East & India. “Further, this 3D parametric modelling environment automates repetitive tasks and change updates.

 

He adds, “This year, we also introduced Tekla Bridge Creator, a new extension for Tekla Structures BIM software that integrates complete bridge design workflow from conceptual design level of development (LOD 100) to truly accurate, fabrication-ready (LOD 400) and as-built constructible models (LOD 500).” It is capable of handling any structural design of bridge with any type of materials. It even allows reading the road alignment to produce complex deck geometries of varying width, depth or even super-elevation. Wallet shares more…

 

  • Solution to delays: During the early design phase, changes to road alignment frequently cause avoidable delays. Later, construction teams often discover issues because of designs that do not include constructible models. These problems frequently cause delays even in the design stage; and such delays inevitably reduce the efficiency of the project and increase cost. The solution to these problems is a constructible model; the use of a purpose-built design workflow by everyone in the process will ensure these issues are eliminated.



  • Overcoming cost pressures: By using constructible virtual models, the building can be constructed cheaper, better and faster. Trimble’s purpose-built bridge design workflow helps bridge designers build constructible models, which can directly be used by contractors. The 3D constructible models produced by BrIM ensure that processes are planned and scheduled more efficiently and errors on site are avoided, which further helps contain costs. The new Tekla Bridge Creator allows bridge designers to create and utilise BrIM that integrates the complete bridge design workflow from design geometry to constructible modelling and detailing.



  • Building bridges: The railway bridge over Chenab River in Jammu & Kashmir, currently under construction, is being constructed on Tekla Structures. On completion, it will span the river at 359 m (1,178 ft) above the surface and cover a length of 1,315 m. Apart from geographical challenges, the project contained about 25,000 tonne of steel detailing, management of which was demanding. Tekla Structures was put to use from the beginning; all structures, temporary cables and related anchoring towers have been designed using constructible BIM and modelled in Tekla Structures. This also facilitated better logistics in the difficult terrain. Besides, constructible BIM has been utilised on site for erection sequence planning, geometry and quality control, and workshop drawings and CNC data are sourced directly from the model. The contractor employed the models in close cooperation with the designer, and the third-party inspector made use of it in the review process. In conclusion, the Chenab Bridge project has clearly demonstrated that constructible BIM can make even a highly ambitious project less complex to design, plan and construct.


    SHRIYAL SETHUMADHAVAN


                                                                                                                                                                                      

Trimble’s construction modelling software Tekla Structures is a comprehensive bridge information modelling (BrIM) solution for bridges and other civil structures. With this, engineering and construction companies can deliver any type or bridge or civil structure; including beam or box girder bridges, truss bridges, arch or tied arch bridges, cantilever bridges, suspension bridges, cable-stayed bridges and underpasses or box culverts. “Users can create a constructible, parametric model, which means each object holds its own data that can then be used for fabrication, erection, construction on-site and asset management during the maintenance of the bridge,” says Paul Wallett, Regional Director, Trimble Solutions Middle East & India. “Further, this 3D parametric modelling environment automates repetitive tasks and change updates. He adds, “This year, we also introduced Tekla Bridge Creator, a new extension for Tekla Structures BIM software that integrates complete bridge design workflow from conceptual design level of development (LOD 100) to truly accurate, fabrication-ready (LOD 400) and as-built constructible models (LOD 500).” It is capable of handling any structural design of bridge with any type of materials. It even allows reading the road alignment to produce complex deck geometries of varying width, depth or even super-elevation. Wallet shares more… Solution to delays: During the early design phase, changes to road alignment frequently cause avoidable delays. Later, construction teams often discover issues because of designs that do not include constructible models. These problems frequently cause delays even in the design stage; and such delays inevitably reduce the efficiency of the project and increase cost. The solution to these problems is a constructible model; the use of a purpose-built design workflow by everyone in the process will ensure these issues are eliminated.Overcoming cost pressures: By using constructible virtual models, the building can be constructed cheaper, better and faster. Trimble’s purpose-built bridge design workflow helps bridge designers build constructible models, which can directly be used by contractors. The 3D constructible models produced by BrIM ensure that processes are planned and scheduled more efficiently and errors on site are avoided, which further helps contain costs. The new Tekla Bridge Creator allows bridge designers to create and utilise BrIM that integrates the complete bridge design workflow from design geometry to constructible modelling and detailing.Building bridges: The railway bridge over Chenab River in Jammu & Kashmir, currently under construction, is being constructed on Tekla Structures. On completion, it will span the river at 359 m (1,178 ft) above the surface and cover a length of 1,315 m. Apart from geographical challenges, the project contained about 25,000 tonne of steel detailing, management of which was demanding. Tekla Structures was put to use from the beginning; all structures, temporary cables and related anchoring towers have been designed using constructible BIM and modelled in Tekla Structures. This also facilitated better logistics in the difficult terrain. Besides, constructible BIM has been utilised on site for erection sequence planning, geometry and quality control, and workshop drawings and CNC data are sourced directly from the model. The contractor employed the models in close cooperation with the designer, and the third-party inspector made use of it in the review process. In conclusion, the Chenab Bridge project has clearly demonstrated that constructible BIM can make even a highly ambitious project less complex to design, plan and construct.SHRIYAL SETHUMADHAVAN                                                                                                                                                                                  

Next Story
Infrastructure Energy

KEC Secures Rs 10, 380 Mn Substation Order in Saudi Arabia

KEC International Ltd., a global infrastructure EPC major, and an RPG Group company, has secured a new order worth Rs 10,380 million for the Design, Supply and Installation of a 380 kV GIS Substation in Saudi Arabia.Vimal Kejriwal, MD & CEO, KEC International Ltd., commented, “We are delighted with the successive order wins in our T&D business. In a landmark achievement, we have secured our largest ever substation order. This prestigious order in the Middle East has widened our portfolio and strengthened our presence in the region. With this strategic win, our year-to-date or..

Next Story
Infrastructure Urban

Central Bank of India executes first fully digital SCF deal on PSB Xchange

In a major advancement for India’s banking sector, Central Bank of India (CBI) has successfully completed the country’s first fully digital supply chain finance (SCF) transaction on PSB Xchange—a unified multi-lender platform launched by PSB Alliance. PSB Xchange is designed to connect public and private sector banks, NBFCs, and fintechs with corporates and their channel partners to facilitate supply chain finance and small business loans. The transaction marks the first time a fintech-originated corporate lead has been seamlessly processed through the PSB Xchange ecosystem. The lead fl..

Next Story
Infrastructure Energy

Atlanta Electricals secures Rs 1,835 Mn transformer order from BNC Power

Atlanta Electricals Limited (“Atlanta”) has secured an order worth Rs 1,835 million from BNC Power Projects Ltd for the supply of extra high voltage (EHV) transformers and a bus reactor for its Pugal site. The contract includes a mix of 315 MVA, 400 KV and 100 MVA, 132 KV transformers along with a 400 KV bus reactor. The project scope encompasses design, manufacturing, testing, and supply to the project site. Deliveries will be sequenced following engineering and drawing approvals, offering multi-quarter execution visibility and ensuring a steady production run-rate. The order will be ex..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?