Surface Mining at its Best
Equipment

Surface Mining at its Best

With the 220 SM surface miner, Wirtgen is unveiling a machine designed especially for use in small and medium-sized mining operations as well as for routing work and infrastructure projects. Selective extraction of raw materials With a cutting width of 2....

With the 220 SM surface miner, Wirtgen is unveiling a machine designed especially for use in small and medium-sized mining operations as well as for routing work and infrastructure projects. Selective extraction of raw materials With a cutting width of 2.2 m and a cutting depth of up to 300 mm, the 220 SM can extract raw materials up to a uniaxial compressive strength of 50 MPa. The extracted material is deposited behind the machine in a windrow and then loaded onto trucks with wheel loaders. Selective extraction makes it possible to mine raw materials with a high level of purity. The use of surface miners also reduces the amount of equipment, maintenance, and time required compared to drilling and blasting or rip-and-stack mining. In addition, refraining from drilling and blasting makes it possible to efficiently mine materials close to industrial sites and other infrastructure like pipelines or high-voltage power lines, which ultimately results in the optimised exploitation of the deposit. Thanks to its compact dimensions and smooth, hydraulic, all-track steering, the smallest Wirtgen surface miner has a tight turning radius, which is particularly beneficial in small mining fields.Routing operations and infrastructure projectsThe 220 SM can also be used for routing work and infrastructure projects. Where excavators or other machinery reach their performance limits, the 708 kW powerhouse can cut even the hardest rock, reduce it to the desired maximum grain size, and create stable and even surfaces with extreme precision. The excellent maneuverability of the 220 SM also makes it ideal for routing narrow sections such as ramps.Highly productive cutting drum unitThe heart of the 220 SM is the optimised cutting drum unit. Specially designed for challenging windrow applications, the cutting drum turns the power delivered by the engine into maximum cutting power, and as a result, increased productivity. In this process, the high, narrow sides of the holder base ensure that material flows smoothly and energy consumption is kept to a minimum. This results in reduced wear and tear on the housing, holders, point-attack cutting tools, and scraper blade – even when mining hard, abrasive material.All of the 220 SM components are designed for extremely demanding open-cast mining applications. This also applies to the massive track units with strong dual-bar base plates for excellent advance, even in difficult conditions. LEVEL PRO PLUS leveling systemThe LEVEL PRO PLUS leveling system has a proven track record in road construction and mining and is intuitive and easy to operate. A flat or inclined formation level can be created with absolute precision thanks to side plate scanning and the cross-slope sensor. The machine is also ready to be equipped with GPS or laser control.Effective safety concept The safety of operating and maintenance personnel is the highest priority in open-cast mining In the ROPS/FOPS operator’s cabin, the operator is protected from external hazards. The cutting drum is easily and safely accessible from the rear through the scraper blade, which opens hydraulically. Pick changes are only carried out when the engine is off. Plenty of space to move, a hydraulic pick ejector, and a milling drum rotation device further simplify this process. Unintentionally switching on the miner can be prevented mechanically by locking the battery and starter isolator, which allows maintenance work to be carried out safely when the machine is shut down. The rear view camera offers excellent visibility for fast, safe maneuvering. When reversing, Reverse Assist offers the operator added support.(Communication by the management of the company)

Next Story
Infrastructure Transport

RVNL secures Rs 1.65 billion railway bridge project from North Eastern Railway

Rail Vikas Nigam (RVNL) has received a Letter of Award (LoA) from North Eastern Railway for a Rs 1.65 billion railway infrastructure project, strengthening its order book and showcasing its expertise in complex railway construction.The project involves constructing the substructure of a major railway bridge over the Gandak River, located between Paniyahwa and Valmikinagar stations. This is part of the doubling of the Gorakhpur Cantt–Valmikinagar railway section, aimed at improving line capacity and operational efficiency.The bridge will feature 14 spans of 61 metres each, built on double D-t..

Next Story
Infrastructure Transport

Raebareli’s Modern Coach Factory rolls out 15,000th railway coach

The Modern Coach Factory (MCF) at Raebareli in Uttar Pradesh has achieved a major manufacturing milestone with the rollout of its 15,000th railway coach on December 15, the Ministry of Railways said.In a press note, the ministry said that MCF has already produced 1,310 coaches in the current financial year 2025–26, reflecting sustained high output at one of Indian Railways’ most advanced passenger coach manufacturing units.Established in 2007 at Lalganj in Raebareli district, MCF was built at a cost of Rs 31.92 billion with an initial annual production capacity of 1,000 coaches. The factor..

Next Story
Infrastructure Transport

RailTel wins Rs 260.88 million IT infrastructure order from VOC Port

Navratna public sector undertaking RailTel Corporation of India has secured an IT infrastructure order worth Rs 260.88 million from V.O. Chidambaranar Port Authority (VOC Port), strengthening its presence in port-led digital transformation projects.According to an exchange filing dated December 16, 2025, RailTel has received a Letter of Acceptance (LoA) from VOC Port Authority for the implementation of advanced IT infrastructure at the port. The project is domestic in nature and is scheduled to be completed by August 15, 2026.The company said the order has been awarded in the normal course of ..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Open In App