Surface Mining at its Best
Equipment

Surface Mining at its Best

With the 220 SM surface miner, Wirtgen is unveiling a machine designed especially for use in small and medium-sized mining operations as well as for routing work and infrastructure projects. Selective extraction of raw materials With a cutting width of 2....

"Join industry leaders at RAHSTA Expo, India's premier platform for roads, highways and traffic infrastructure. Register now to explore innovations, network with experts and shape the future of mobility."

With the 220 SM surface miner, Wirtgen is unveiling a machine designed especially for use in small and medium-sized mining operations as well as for routing work and infrastructure projects. Selective extraction of raw materials With a cutting width of 2.2 m and a cutting depth of up to 300 mm, the 220 SM can extract raw materials up to a uniaxial compressive strength of 50 MPa. The extracted material is deposited behind the machine in a windrow and then loaded onto trucks with wheel loaders. Selective extraction makes it possible to mine raw materials with a high level of purity. The use of surface miners also reduces the amount of equipment, maintenance, and time required compared to drilling and blasting or rip-and-stack mining. In addition, refraining from drilling and blasting makes it possible to efficiently mine materials close to industrial sites and other infrastructure like pipelines or high-voltage power lines, which ultimately results in the optimised exploitation of the deposit. Thanks to its compact dimensions and smooth, hydraulic, all-track steering, the smallest Wirtgen surface miner has a tight turning radius, which is particularly beneficial in small mining fields.Routing operations and infrastructure projectsThe 220 SM can also be used for routing work and infrastructure projects. Where excavators or other machinery reach their performance limits, the 708 kW powerhouse can cut even the hardest rock, reduce it to the desired maximum grain size, and create stable and even surfaces with extreme precision. The excellent maneuverability of the 220 SM also makes it ideal for routing narrow sections such as ramps.Highly productive cutting drum unitThe heart of the 220 SM is the optimised cutting drum unit. Specially designed for challenging windrow applications, the cutting drum turns the power delivered by the engine into maximum cutting power, and as a result, increased productivity. In this process, the high, narrow sides of the holder base ensure that material flows smoothly and energy consumption is kept to a minimum. This results in reduced wear and tear on the housing, holders, point-attack cutting tools, and scraper blade – even when mining hard, abrasive material.All of the 220 SM components are designed for extremely demanding open-cast mining applications. This also applies to the massive track units with strong dual-bar base plates for excellent advance, even in difficult conditions. LEVEL PRO PLUS leveling systemThe LEVEL PRO PLUS leveling system has a proven track record in road construction and mining and is intuitive and easy to operate. A flat or inclined formation level can be created with absolute precision thanks to side plate scanning and the cross-slope sensor. The machine is also ready to be equipped with GPS or laser control.Effective safety concept The safety of operating and maintenance personnel is the highest priority in open-cast mining In the ROPS/FOPS operator’s cabin, the operator is protected from external hazards. The cutting drum is easily and safely accessible from the rear through the scraper blade, which opens hydraulically. Pick changes are only carried out when the engine is off. Plenty of space to move, a hydraulic pick ejector, and a milling drum rotation device further simplify this process. Unintentionally switching on the miner can be prevented mechanically by locking the battery and starter isolator, which allows maintenance work to be carried out safely when the machine is shut down. The rear view camera offers excellent visibility for fast, safe maneuvering. When reversing, Reverse Assist offers the operator added support.(Communication by the management of the company)

Next Story
Infrastructure Urban

ABS Marine Sees CRISIL Credit Rating Upgrade

ABS Marine Services has secured an upgrade to its long term and short term credit ratings from CRISIL, reflecting improved profitability and revenue growth through long term contracts. CRISIL moved the long term rating from BBB+/Stable to A-/Stable and revised the short term rating from A2 to A2+. The action signals strengthened financial metrics and operational resilience. The company benefited from durable client relationships with firms such as ONGC and Schlumberger. The rating decision followed stronger cash flows and an enlarged bank loan facility, which increased from Rs 3,705 million (m..

Next Story
Infrastructure Transport

Project BRAHMANK Marks 16 Years Of Strategic Roads In Arunachal

Project BRAHMANK is marking 16 years of work to establish strategic road and bridge links across Arunachal Pradesh, maintaining and developing 811 kilometres of roads and nearly 86 bridges that range from small culverts to large steel and arch bridges. These transport links are described as critical for ensuring year-round movement of defence personnel, equipment and essential supplies while improving everyday travel for people in remote villages. The project balances national security requirements with regional development by focusing on reliable access in challenging terrain. Notable enginee..

Next Story
Infrastructure Transport

Longleng CSOs Give One Week Ultimatum Over Two-Lane Highway

Civil society organisations (CSOs) in Longleng district have demanded immediate restoration of the deteriorating Changtongya–Longleng two-lane road and sought a detailed status report on the stalled construction within one week. The demand followed a consultative meeting convened under the Phom Peoples' Council (PPC) to discuss welfare and development concerns. PPC president YB Angam Phom said prolonged non-maintenance had caused hardship to commuters and affected transportation, local commerce and the district's development. The meeting urged authorities to undertake immediate restoration a..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement