CIL, Vedanta, Adani seek lithium mining rights in Korba, Chhattisgarh
COAL & MINING

CIL, Vedanta, Adani seek lithium mining rights in Korba, Chhattisgarh

Various companies including Coal India, Vedanta, Adani Group, and Jindal, have conveyed their interest in conducting a survey and excavation of the lithium mine discovered in Chhattisgarh?s Korba district.

In February 2023, lithium was uncovered in the Katghora tehsil by the Geological Survey of India (GSI). According to an initial report, the lithium deposits covered an area of 256.12 hectares, of which 84.86 hectares belonged to the forest. Coal India, if granted the license, intends to expand its mining activities to include other minerals. Additionally, Ola Electric, Shree Cement, Khanij Bidesh India, Oriental Mining & Co, Dalmia, Rungta, and UltraTech have also demonstrated their interest, as stated by the officer.

The GSI reported that geochemical mapping revealed varying lithium values in the seven composite samples from the Katghora area, ranging from 82.606 to 155 ppm (parts per million).

The GSI report suggests that the Katghora block might be proposed for a composite license, encompassing a prospecting license-cum-mining lease. This block is part of the ongoing auction process for 20 mineral blocks nationwide.

Various companies including Coal India, Vedanta, Adani Group, and Jindal, have conveyed their interest in conducting a survey and excavation of the lithium mine discovered in Chhattisgarh?s Korba district. In February 2023, lithium was uncovered in the Katghora tehsil by the Geological Survey of India (GSI). According to an initial report, the lithium deposits covered an area of 256.12 hectares, of which 84.86 hectares belonged to the forest. Coal India, if granted the license, intends to expand its mining activities to include other minerals. Additionally, Ola Electric, Shree Cement, Khanij Bidesh India, Oriental Mining & Co, Dalmia, Rungta, and UltraTech have also demonstrated their interest, as stated by the officer. The GSI reported that geochemical mapping revealed varying lithium values in the seven composite samples from the Katghora area, ranging from 82.606 to 155 ppm (parts per million). The GSI report suggests that the Katghora block might be proposed for a composite license, encompassing a prospecting license-cum-mining lease. This block is part of the ongoing auction process for 20 mineral blocks nationwide.

Next Story
Real Estate

Kolkata’s luxury housing market sees price growth amid mixed trends

A new study by Nklusive reveals that Kolkata’s luxury residential market (Rs 5–10 crore) recorded a 33 per cent year-on-year rise in supply and a 52 per cent increase in sales in calendar year 2024 (CY24). South Kolkata led with 78 per cent of the segment’s supply. The average price rose by 6 per cent—from Rs 17,519 to Rs 18,600 per sq ft—while unsold inventory grew by 15 per cent. Monthly absorption improved from 2 to 3 units.In contrast, the ultra-luxury segment (Rs 10 crore and above) experienced a 17 per cent decline in supply and a 30 per cent fall in sales. Central Kolkata acco..

Next Story
Infrastructure Transport

New Expressway to Cut Pune-Bengaluru Travel Time by Half

The upcoming Pune-Bengaluru Expressway is expected to significantly improve connectivity and economic opportunities across Maharashtra and Karnataka. This 700-kilometre greenfield, access-controlled highway will cut the travel time between Pune and Bengaluru from 15 hours to just 7 hours, facilitating easier movement for both commuters and businesses. Starting from Bommanal in Karnataka’s Athani Taluk, the expressway will traverse important districts such as Belagavi, Bagalkot, and Jamakhandi. It will then enter Maharashtra at Kanjle, connect with the proposed Pune Ring Road, and pass throug..

Next Story
Infrastructure Transport

Nagpur’s Koradi Naka to Get Y-Shaped Flyover for Safer, Smoother Traffic

To alleviate traffic congestion and enhance safety at Koradi Naka in Nagpur, a Y-shaped flyover is currently being constructed on National Highway 47. Demolition work has already commenced, with the main construction scheduled to start on June 20, 2025.The project, costing Rs 430.37 billion, involves building a 1,090-meter-long flyover that will connect Farsa, the Mahadula Railway Overbridge (ROB), and Bokhara Road, and will also feature an underpass. The existing structure will be repurposed into a service road to facilitate local traffic.Koradi Naka has been identified as a significant "blac..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?