GSI Probes Rare Earth Deposits in Bengal and Assam
COAL & MINING

GSI Probes Rare Earth Deposits in Bengal and Assam

The Geological Survey of India (GSI) is conducting advanced G2-level exploration for rare earth elements (REE) in West Bengal's Purulia district and Assam’s Karbi Anglong. GSI Director General Asit Saha stated that both blocks are likely to be auction-ready within a year, marking a key step in tapping India’s strategic mineral reserves.

Speaking at the 3rd Minerals and Mining Conclave 2025 organised by ASSOCHAM, Mr Saha noted that while specific rare earth elements are yet to be confirmed, the deposits may include a "basket of 14 to 17" REEs. This diversity could pose technical challenges during extraction. Additionally, vanadium reserves have been identified in the lower Himalayan belt, expanding the country’s critical mineral portfolio.

G2-level exploration refers to an advanced stage of geological investigation, involving sampling to assess the quality and quantity of mineralisation. Upon completion, the findings will be submitted to the respective State mining departments and the Union Ministry of Mines for further action.

The exploration drive comes amid rising demand for REEs in electric vehicles, electronics, defence systems, and medical technologies. The move aligns with India’s broader goal of strengthening self-reliance in high-tech manufacturing and e-mobility.

The Geological Survey of India (GSI) is conducting advanced G2-level exploration for rare earth elements (REE) in West Bengal's Purulia district and Assam’s Karbi Anglong. GSI Director General Asit Saha stated that both blocks are likely to be auction-ready within a year, marking a key step in tapping India’s strategic mineral reserves.Speaking at the 3rd Minerals and Mining Conclave 2025 organised by ASSOCHAM, Mr Saha noted that while specific rare earth elements are yet to be confirmed, the deposits may include a basket of 14 to 17 REEs. This diversity could pose technical challenges during extraction. Additionally, vanadium reserves have been identified in the lower Himalayan belt, expanding the country’s critical mineral portfolio.G2-level exploration refers to an advanced stage of geological investigation, involving sampling to assess the quality and quantity of mineralisation. Upon completion, the findings will be submitted to the respective State mining departments and the Union Ministry of Mines for further action.The exploration drive comes amid rising demand for REEs in electric vehicles, electronics, defence systems, and medical technologies. The move aligns with India’s broader goal of strengthening self-reliance in high-tech manufacturing and e-mobility. 

Next Story
Infrastructure Urban

ABS Marine Sees CRISIL Credit Rating Upgrade

ABS Marine Services has secured an upgrade to its long term and short term credit ratings from CRISIL, reflecting improved profitability and revenue growth through long term contracts. CRISIL moved the long term rating from BBB+/Stable to A-/Stable and revised the short term rating from A2 to A2+. The action signals strengthened financial metrics and operational resilience. The company benefited from durable client relationships with firms such as ONGC and Schlumberger. The rating decision followed stronger cash flows and an enlarged bank loan facility, which increased from Rs 3,705 million (m..

Next Story
Infrastructure Transport

Project BRAHMANK Marks 16 Years Of Strategic Roads In Arunachal

Project BRAHMANK is marking 16 years of work to establish strategic road and bridge links across Arunachal Pradesh, maintaining and developing 811 kilometres of roads and nearly 86 bridges that range from small culverts to large steel and arch bridges. These transport links are described as critical for ensuring year-round movement of defence personnel, equipment and essential supplies while improving everyday travel for people in remote villages. The project balances national security requirements with regional development by focusing on reliable access in challenging terrain. Notable enginee..

Next Story
Infrastructure Transport

Longleng CSOs Give One Week Ultimatum Over Two-Lane Highway

Civil society organisations (CSOs) in Longleng district have demanded immediate restoration of the deteriorating Changtongya–Longleng two-lane road and sought a detailed status report on the stalled construction within one week. The demand followed a consultative meeting convened under the Phom Peoples' Council (PPC) to discuss welfare and development concerns. PPC president YB Angam Phom said prolonged non-maintenance had caused hardship to commuters and affected transportation, local commerce and the district's development. The meeting urged authorities to undertake immediate restoration a..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement