NTPC to repurpose coal-based plants in renewables push
COAL & MINING

NTPC to repurpose coal-based plants in renewables push

The National Thermal Power Corp is planning an aggressive push in the renewable energy segment and repurposing their existing coal-based plants, according to NTPC chairman and managing director Gurdeep Singh.

“We will go for an aggressive push for solar, hydro, wind, and repurposing of our existing coal-based plants,” Singh said in a panel discussion at a KPMG-hosted event in New Delhi.

He added that though the state-run giant will increase its renewable energy share in its power mix, this does not mean that NTPC will shut down its coal-based plants.

The NTPC Group had an installed power generation capacity of 69,134 MW at the end of July 2022, including coal-based capacity of 56,800 MW, gas-based capacity of 6,400 MW, hydropower capacity of 3,700 MW and 2,000 MW (2.8% of the total) of renewable energy. On the role of natural gas in energy transition, Rajarshi Gupta, managing director of ONGC Videsh (OVL), speaking at the same event, said that gas is not a transition fuel, but rather a transformative fuel.

“OVL has a dream to be a vehicle for transferring renewable energy technology to India from other nations,” said Gupta. The KPMG’s two-day ENRich 2022 event was on the theme ‘Dealing with energy and resources trilemma’.

See also:
Indore plans India's first retail municipal green bond for solar plant
Yadadri thermal plant likely to be operational next year


The National Thermal Power Corp is planning an aggressive push in the renewable energy segment and repurposing their existing coal-based plants, according to NTPC chairman and managing director Gurdeep Singh. “We will go for an aggressive push for solar, hydro, wind, and repurposing of our existing coal-based plants,” Singh said in a panel discussion at a KPMG-hosted event in New Delhi. He added that though the state-run giant will increase its renewable energy share in its power mix, this does not mean that NTPC will shut down its coal-based plants. The NTPC Group had an installed power generation capacity of 69,134 MW at the end of July 2022, including coal-based capacity of 56,800 MW, gas-based capacity of 6,400 MW, hydropower capacity of 3,700 MW and 2,000 MW (2.8% of the total) of renewable energy. On the role of natural gas in energy transition, Rajarshi Gupta, managing director of ONGC Videsh (OVL), speaking at the same event, said that gas is not a transition fuel, but rather a transformative fuel. “OVL has a dream to be a vehicle for transferring renewable energy technology to India from other nations,” said Gupta. The KPMG’s two-day ENRich 2022 event was on the theme ‘Dealing with energy and resources trilemma’. See also: Indore plans India's first retail municipal green bond for solar plantYadadri thermal plant likely to be operational next year

Next Story
Infrastructure Urban

ABS Marine Sees CRISIL Credit Rating Upgrade

ABS Marine Services has secured an upgrade to its long term and short term credit ratings from CRISIL, reflecting improved profitability and revenue growth through long term contracts. CRISIL moved the long term rating from BBB+/Stable to A-/Stable and revised the short term rating from A2 to A2+. The action signals strengthened financial metrics and operational resilience. The company benefited from durable client relationships with firms such as ONGC and Schlumberger. The rating decision followed stronger cash flows and an enlarged bank loan facility, which increased from Rs 3,705 million (m..

Next Story
Infrastructure Transport

Project BRAHMANK Marks 16 Years Of Strategic Roads In Arunachal

Project BRAHMANK is marking 16 years of work to establish strategic road and bridge links across Arunachal Pradesh, maintaining and developing 811 kilometres of roads and nearly 86 bridges that range from small culverts to large steel and arch bridges. These transport links are described as critical for ensuring year-round movement of defence personnel, equipment and essential supplies while improving everyday travel for people in remote villages. The project balances national security requirements with regional development by focusing on reliable access in challenging terrain. Notable enginee..

Next Story
Infrastructure Transport

Longleng CSOs Give One Week Ultimatum Over Two-Lane Highway

Civil society organisations (CSOs) in Longleng district have demanded immediate restoration of the deteriorating Changtongya–Longleng two-lane road and sought a detailed status report on the stalled construction within one week. The demand followed a consultative meeting convened under the Phom Peoples' Council (PPC) to discuss welfare and development concerns. PPC president YB Angam Phom said prolonged non-maintenance had caused hardship to commuters and affected transportation, local commerce and the district's development. The meeting urged authorities to undertake immediate restoration a..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement