15K Sq Km of Mahanadi Onshore Basin Being Scouted For Oil, Natural Gas
OIL & GAS

15K Sq Km of Mahanadi Onshore Basin Being Scouted For Oil, Natural Gas

Oil India Limited is exploring around 15,000 sq km area on Mahanadi onshore basin to look for oil and natural gas. Speaking at an event here on Monday, Oil India chairman and managing director (CMD) Ranjit Rath said the exploration work is underway at the Mahanadi onshore basin and Odisha has the likelihood to immensely benefit out of it. Oil India also has other huge investments going on in the state, he added. This apart, Rath said they are also laying the longest crude oil pipeline in the country of which 200 km will pass through Odisha. “We are laying the pipeline as part of the proposed expansion of the Numaligarh refinery from its existing capacity of 3 million tonne to 9 million tonne. Accordingly a pipeline is being laid from Paradip to Numaligarh. Once it is commissioned, it will be the longest crude oil pipeline and 200 km of it will pass through Odisha,” Rath said adding, a tank farm is also being built in Paradip for the purpose. Stating that natural gas at present contributes to around seven per cent of India’s primary energy needs, the Oil India CMD said it will increase over time. “Prime Minister Narendra Modi has set a vision to raise the share of natural gas in energy mix in the country to 15 per cent by 2030. Apart from natural gas, biogas generated from municipal waste and agricultural residues will also play an important role in achieving the target,” he said.

Oil India Limited is exploring around 15,000 sq km area on Mahanadi onshore basin to look for oil and natural gas. Speaking at an event here on Monday, Oil India chairman and managing director (CMD) Ranjit Rath said the exploration work is underway at the Mahanadi onshore basin and Odisha has the likelihood to immensely benefit out of it. Oil India also has other huge investments going on in the state, he added. This apart, Rath said they are also laying the longest crude oil pipeline in the country of which 200 km will pass through Odisha. “We are laying the pipeline as part of the proposed expansion of the Numaligarh refinery from its existing capacity of 3 million tonne to 9 million tonne. Accordingly a pipeline is being laid from Paradip to Numaligarh. Once it is commissioned, it will be the longest crude oil pipeline and 200 km of it will pass through Odisha,” Rath said adding, a tank farm is also being built in Paradip for the purpose. Stating that natural gas at present contributes to around seven per cent of India’s primary energy needs, the Oil India CMD said it will increase over time. “Prime Minister Narendra Modi has set a vision to raise the share of natural gas in energy mix in the country to 15 per cent by 2030. Apart from natural gas, biogas generated from municipal waste and agricultural residues will also play an important role in achieving the target,” he said.

Next Story
Infrastructure Urban

DCPC Prepares for Special Campaign 5.0 with Focus on E-Waste

The Department of Chemicals and Petrochemicals (DCPC), Ministry of Chemicals and Fertilisers, is gearing up for Special Campaign 5.0, to be held from 2nd to 31st October 2025. The initiative will focus on e-waste disposal as per MoEFCC’s E-Waste Management Rules 2022, space optimisation, and enhancing workplace efficiency across field offices.Special Campaign 4.0, conducted between October 2023 and October 2024, delivered notable results in record management, grievance redressal, scrap disposal, and cleanliness drives.Key outcomes of Special Campaign 4.0Records management: 2,443 physical fil..

Next Story
Real Estate

BlackRock India Leases 1.4 Lakh Sq Ft in Bengaluru

BlackRock Services India, the domestic arm of global asset manager BlackRock, has leased 1.4 lakh sq ft of office space at IndiQube Symphony in Bengaluru, according to Propstack data. The 10-year deal is valued at around Rs 4.10 billion.The lease, among the largest transactions in India’s co-working sector, highlights the growing preference of global institutions for flexible office providers. The agreement, commencing October 1, 2025, covers ground plus five floors in KNG Tower 1 at Ashoknagar, MG Road — one of Bengaluru’s prime commercial hubs.As per the lease document, BlackRock will ..

Next Story
Infrastructure Transport

L&T Bags Rs 25–50 Bn Order for Mumbai-Ahmedabad Bullet Train Track Works

Larsen & Toubro’s (L&T) Transportation Infrastructure business has secured an order valued between Rs 25 crore and Rs 50 billion from the National High Speed Rail Corporation Limited (NHSRCL) for the Mumbai-Ahmedabad High Speed Rail (MAHSR) corridor.The contract, Package T1, involves the design, supply, construction, testing, and commissioning of 156 route km of high-speed ballastless track on a Design-Build Lump Sum Price basis. The stretch runs from Mumbai’s Bandra-Kurla Complex to Zaroli village in Gujarat and includes 21 km of underground track and 135 km of elevated viaduct.Se..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?