BHEL Wins NTPC Order for Chhattisgarh Power Project
POWER & RENEWABLE ENERGY

BHEL Wins NTPC Order for Chhattisgarh Power Project

In a regulatory filing, Bharat Heavy Electricals Limited (BHEL) announced that it has secured an order from NTPC, a state-owned power producer, for the construction of the 2x800 MW Supercritical Thermal Power Project Stage-II in Lara, Chhattisgarh. BHEL provided additional information on this NTPC order victory, stating that it encompasses the "Design, Engineering, Manufacturing, Supply, Construction, Erection, Testing & Commissioning, including Civil & Structural works for the EPC Package." BHEL also mentioned that the scope of work includes the creation of a Steam Generator capable of Biomass co-firing, a Steam Turbine, Generator & Auxiliaries, emission control systems, control and instrumentation, as well as balance of plant packages, among other elements.

The company disclosed that it has a timeline to complete unit-1 within 48 months from the zero date, with unit-2 scheduled to be executed within 52 months from the same zero date.

In a separate filing on August 30, NTPC announced that its board of directors had approved an investment of Rs 155.29 billion for the establishment of the Lara Super Thermal Power Project, Stage-II (2x800 MW).

BHEL's recent order acquisition follows its success in securing a Rs 22.42-billion order from NHPC and a Rs 40 billion order from an Adani Power subsidiary. Additionally, BHEL received orders worth Rs 40 billion from Mahan Energen, a subsidiary of the Adani group, for the supply of power generation equipment for their upcoming 2x800 MW project in Bandhaura, Madhya Pradesh.

Furthermore, on August 25, the company received a Rs 22.41 billion order from NHPC Limited, Faridabad.

In its Q1FY24 results, BHEL reported a widening of its consolidated net loss to Rs 3.43 billion for the April-June quarter, compared to the same period in the previous year.

See also:
Union Minister Mahendra Nath Pandey reviews thermal projects by BHEL
Adani Power acquires 1,200 MW thermal project in Madhya Pradesh

In a regulatory filing, Bharat Heavy Electricals Limited (BHEL) announced that it has secured an order from NTPC, a state-owned power producer, for the construction of the 2x800 MW Supercritical Thermal Power Project Stage-II in Lara, Chhattisgarh. BHEL provided additional information on this NTPC order victory, stating that it encompasses the Design, Engineering, Manufacturing, Supply, Construction, Erection, Testing & Commissioning, including Civil & Structural works for the EPC Package. BHEL also mentioned that the scope of work includes the creation of a Steam Generator capable of Biomass co-firing, a Steam Turbine, Generator & Auxiliaries, emission control systems, control and instrumentation, as well as balance of plant packages, among other elements. The company disclosed that it has a timeline to complete unit-1 within 48 months from the zero date, with unit-2 scheduled to be executed within 52 months from the same zero date. In a separate filing on August 30, NTPC announced that its board of directors had approved an investment of Rs 155.29 billion for the establishment of the Lara Super Thermal Power Project, Stage-II (2x800 MW). BHEL's recent order acquisition follows its success in securing a Rs 22.42-billion order from NHPC and a Rs 40 billion order from an Adani Power subsidiary. Additionally, BHEL received orders worth Rs 40 billion from Mahan Energen, a subsidiary of the Adani group, for the supply of power generation equipment for their upcoming 2x800 MW project in Bandhaura, Madhya Pradesh. Furthermore, on August 25, the company received a Rs 22.41 billion order from NHPC Limited, Faridabad. In its Q1FY24 results, BHEL reported a widening of its consolidated net loss to Rs 3.43 billion for the April-June quarter, compared to the same period in the previous year. See also: Union Minister Mahendra Nath Pandey reviews thermal projects by BHEL Adani Power acquires 1,200 MW thermal project in Madhya Pradesh

Next Story
Infrastructure Transport

NF Railway Launches Girder on World’s Tallest Pier Bridge in Manipur

The Northeast Frontier Railway (NFR) has reached a significant engineering milestone by successfully completing the girder launch on the iconic Noney Bridge in Manipur.Regarded as an engineering marvel, the Noney Bridge is recognized as the world’s tallest railway pier bridge. It forms a crucial part of the 111 km long Jiribam-Imphal railway line project.Recently, the final span of the bridge was successfully erected, marking the completion of all eight spans of this monumental infrastructure venture.Kapinjal Kishore Sharma, Chief Public Relations Officer of NFR, stated that this accomplishm..

Next Story
Infrastructure Urban

Cube Highways Trust Reports Rs 34.53 Bn Total Income in FY25

Cube Highways Trust (Cube InvIT), managed by Cube Highways Fund Advisors, concluded its second financial year post-listing on a strong note by reporting a total consolidated income of Rs 34.53 billion for the financial year 2025, marking a 12.3 percent year-on-year (YoY) increase.According to the official media release, Cube InvIT posted a consolidated earnings before interest, tax, depreciation, and amortisation (EBITDA) of Rs 2,380 crore, reflecting a 21.7 percent YoY growth. During the year, traffic volumes increased by 6.2 percent, while the Asset Under Management (AUM) grew 25 percent to ..

Next Story
Infrastructure Transport

New Flyover to Ease Traffic on Hyderabad’s Busiest Road

To improve urban connectivity and reduce traffic congestion in the city, the Greater Hyderabad Municipal Corporation (GHMC) will undertake the construction of a two-lane unidirectional flyover at NFCL Junction in Banjara Hills, along with a two-lane unidirectional underpass and a three-lane unidirectional flyover at TV9 Junction, as part of the state government’s prestigious Hyderabad City Innovative and Transformative Infrastructure (H-CITI) programme.The NFCL Junction flyover will be a two-lane unidirectional structure extending from Banjara Hills Road No. 3 towards GVK Mall. It is planned..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?