BHEL Wins NTPC Order for Chhattisgarh Power Project
POWER & RENEWABLE ENERGY

BHEL Wins NTPC Order for Chhattisgarh Power Project

In a regulatory filing, Bharat Heavy Electricals Limited (BHEL) announced that it has secured an order from NTPC, a state-owned power producer, for the construction of the 2x800 MW Supercritical Thermal Power Project Stage-II in Lara, Chhattisgarh. BHEL provided additional information on this NTPC order victory, stating that it encompasses the "Design, Engineering, Manufacturing, Supply, Construction, Erection, Testing & Commissioning, including Civil & Structural works for the EPC Package." BHEL also mentioned that the scope of work includes the creation of a Steam Generator capable of Biomass co-firing, a Steam Turbine, Generator & Auxiliaries, emission control systems, control and instrumentation, as well as balance of plant packages, among other elements.

The company disclosed that it has a timeline to complete unit-1 within 48 months from the zero date, with unit-2 scheduled to be executed within 52 months from the same zero date.

In a separate filing on August 30, NTPC announced that its board of directors had approved an investment of Rs 155.29 billion for the establishment of the Lara Super Thermal Power Project, Stage-II (2x800 MW).

BHEL's recent order acquisition follows its success in securing a Rs 22.42-billion order from NHPC and a Rs 40 billion order from an Adani Power subsidiary. Additionally, BHEL received orders worth Rs 40 billion from Mahan Energen, a subsidiary of the Adani group, for the supply of power generation equipment for their upcoming 2x800 MW project in Bandhaura, Madhya Pradesh.

Furthermore, on August 25, the company received a Rs 22.41 billion order from NHPC Limited, Faridabad.

In its Q1FY24 results, BHEL reported a widening of its consolidated net loss to Rs 3.43 billion for the April-June quarter, compared to the same period in the previous year.

See also:
Union Minister Mahendra Nath Pandey reviews thermal projects by BHEL
Adani Power acquires 1,200 MW thermal project in Madhya Pradesh

In a regulatory filing, Bharat Heavy Electricals Limited (BHEL) announced that it has secured an order from NTPC, a state-owned power producer, for the construction of the 2x800 MW Supercritical Thermal Power Project Stage-II in Lara, Chhattisgarh. BHEL provided additional information on this NTPC order victory, stating that it encompasses the Design, Engineering, Manufacturing, Supply, Construction, Erection, Testing & Commissioning, including Civil & Structural works for the EPC Package. BHEL also mentioned that the scope of work includes the creation of a Steam Generator capable of Biomass co-firing, a Steam Turbine, Generator & Auxiliaries, emission control systems, control and instrumentation, as well as balance of plant packages, among other elements. The company disclosed that it has a timeline to complete unit-1 within 48 months from the zero date, with unit-2 scheduled to be executed within 52 months from the same zero date. In a separate filing on August 30, NTPC announced that its board of directors had approved an investment of Rs 155.29 billion for the establishment of the Lara Super Thermal Power Project, Stage-II (2x800 MW). BHEL's recent order acquisition follows its success in securing a Rs 22.42-billion order from NHPC and a Rs 40 billion order from an Adani Power subsidiary. Additionally, BHEL received orders worth Rs 40 billion from Mahan Energen, a subsidiary of the Adani group, for the supply of power generation equipment for their upcoming 2x800 MW project in Bandhaura, Madhya Pradesh. Furthermore, on August 25, the company received a Rs 22.41 billion order from NHPC Limited, Faridabad. In its Q1FY24 results, BHEL reported a widening of its consolidated net loss to Rs 3.43 billion for the April-June quarter, compared to the same period in the previous year. See also: Union Minister Mahendra Nath Pandey reviews thermal projects by BHEL Adani Power acquires 1,200 MW thermal project in Madhya Pradesh

Next Story
Infrastructure Urban

bauma Inspires Progress

bauma reaffirmed its position as the heartbeat of the construction machinery industry. With 6,00,000 visitors and 3,601 exhibitors, the event spotlighted sustainability and digitalisation. Amid global challenges, it fuelled optimism, and future-ready solutions...

Next Story
Infrastructure Urban

IMPACCT.Info: AI Powered Business Intelligence

India’s infrastructure pipeline is witnessing dynamic activity across stages — from immediate bidding to future planning. IMPACCT segments these into three categories: Immediate, 3–6 Month, and Future Opportunities, enabling businesses to identify, prepare, and participate in high-value tenders and projects across sectors.To read the full article Click Here ..

Next Story
Equipment

Better Concrete Handling

Efficiently handling the transportation and placement of concrete is essential to help maintain the quality of construction, meet project timelines by minimising downtimes, and reduce costs – by 5 to 15 per cent, according to Sandeep Jain, Director, Arkade Developers. CW explores what the efficient handling of concrete entails.Select WellFirst, a word on choosing the right equipment, such as a mixer with a capacity aligned to the volume required onsite, from Vaibhav Kulkarni, Concrete Expert. “An overly large mixer will increase the idle time (and cost), while one that ..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?