+
BHEL Wins NTPC Order for Chhattisgarh Power Project
POWER & RENEWABLE ENERGY

BHEL Wins NTPC Order for Chhattisgarh Power Project

In a regulatory filing, Bharat Heavy Electricals Limited (BHEL) announced that it has secured an order from NTPC, a state-owned power producer, for the construction of the 2x800 MW Supercritical Thermal Power Project Stage-II in Lara, Chhattisgarh. BHEL provided additional information on this NTPC order victory, stating that it encompasses the "Design, Engineering, Manufacturing, Supply, Construction, Erection, Testing & Commissioning, including Civil & Structural works for the EPC Package." BHEL also mentioned that the scope of work includes the creation of a Steam Generator capable of Biomass co-firing, a Steam Turbine, Generator & Auxiliaries, emission control systems, control and instrumentation, as well as balance of plant packages, among other elements.

The company disclosed that it has a timeline to complete unit-1 within 48 months from the zero date, with unit-2 scheduled to be executed within 52 months from the same zero date.

In a separate filing on August 30, NTPC announced that its board of directors had approved an investment of Rs 155.29 billion for the establishment of the Lara Super Thermal Power Project, Stage-II (2x800 MW).

BHEL's recent order acquisition follows its success in securing a Rs 22.42-billion order from NHPC and a Rs 40 billion order from an Adani Power subsidiary. Additionally, BHEL received orders worth Rs 40 billion from Mahan Energen, a subsidiary of the Adani group, for the supply of power generation equipment for their upcoming 2x800 MW project in Bandhaura, Madhya Pradesh.

Furthermore, on August 25, the company received a Rs 22.41 billion order from NHPC Limited, Faridabad.

In its Q1FY24 results, BHEL reported a widening of its consolidated net loss to Rs 3.43 billion for the April-June quarter, compared to the same period in the previous year.

See also:
Union Minister Mahendra Nath Pandey reviews thermal projects by BHEL
Adani Power acquires 1,200 MW thermal project in Madhya Pradesh

In a regulatory filing, Bharat Heavy Electricals Limited (BHEL) announced that it has secured an order from NTPC, a state-owned power producer, for the construction of the 2x800 MW Supercritical Thermal Power Project Stage-II in Lara, Chhattisgarh. BHEL provided additional information on this NTPC order victory, stating that it encompasses the Design, Engineering, Manufacturing, Supply, Construction, Erection, Testing & Commissioning, including Civil & Structural works for the EPC Package. BHEL also mentioned that the scope of work includes the creation of a Steam Generator capable of Biomass co-firing, a Steam Turbine, Generator & Auxiliaries, emission control systems, control and instrumentation, as well as balance of plant packages, among other elements. The company disclosed that it has a timeline to complete unit-1 within 48 months from the zero date, with unit-2 scheduled to be executed within 52 months from the same zero date. In a separate filing on August 30, NTPC announced that its board of directors had approved an investment of Rs 155.29 billion for the establishment of the Lara Super Thermal Power Project, Stage-II (2x800 MW). BHEL's recent order acquisition follows its success in securing a Rs 22.42-billion order from NHPC and a Rs 40 billion order from an Adani Power subsidiary. Additionally, BHEL received orders worth Rs 40 billion from Mahan Energen, a subsidiary of the Adani group, for the supply of power generation equipment for their upcoming 2x800 MW project in Bandhaura, Madhya Pradesh. Furthermore, on August 25, the company received a Rs 22.41 billion order from NHPC Limited, Faridabad. In its Q1FY24 results, BHEL reported a widening of its consolidated net loss to Rs 3.43 billion for the April-June quarter, compared to the same period in the previous year. See also: Union Minister Mahendra Nath Pandey reviews thermal projects by BHEL Adani Power acquires 1,200 MW thermal project in Madhya Pradesh

Related Stories

Gold Stories

Next Story
Infrastructure Transport

Madhya Pradesh Plans Airport Every 150 Km, Airstrip Every 75 Km

The Madhya Pradesh government plans to establish an airport every 150 km, an airstrip every 75 km and a helipad every 45 km, according to the state aviation department. Airports being developed in Ujjain and Shivpuri are expected to take the state’s airport count to 10. The government stated that Madhya Pradesh currently has eight airports in eight cities. The locations named by the department include Indore, Bhopal, Jabalpur, Gwalior, Khajuraho, Rewa and Satna. The state also has more than 20 airstrips and 220 helipads, while permanent helipads are planned in all 230 Assembly constituencies..

Next Story
Infrastructure Transport

West Bengal Plans Four Airports for 2028 Completion Under UDAN

West Bengal will develop four new airports under an agreement signed between the Union Civil Aviation Ministry and the state government, with all facilities targeted for completion by 2028. Union Civil Aviation Minister K Rammohan Naidu said the airports would be located at Charra in Purulia, Kalaikunda in Paschim Medinipur, Balurghat in Dakshin Dinajpur and Hasimara in Alipurduar. The project is part of the Centre’s regional connectivity UDAN programme. The Union government has committed Rs. 290 bn for West Bengal’s aviation sector over the next decade, while the state government will pro..

Next Story
Infrastructure Transport

Mumbai Airport Bars Russian Airlines as Agent Seeks Ministry Intervention

Mumbai airport has stopped accepting cargo booked on Russian flag carrier Aeroflot, disrupting shipments and prompting the airline’s cargo sales agent, Delmos Aviation, to seek intervention from the Ministry of Civil Aviation. The restrictions also affect cargo booked on Volga-Dnepr Airlines, according to a letter submitted by Delmos Aviation to the ministry on September 30. Aeroflot operates daily flights between Moscow and Delhi and runs a winter seasonal service to Goa. Bonded cargo from Mumbai and other cities is transported by road to Delhi before being flown to Russia. The agent said t..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code