Delhi's power demand hits record 7,572 MW amid rising heat
POWER & RENEWABLE ENERGY

Delhi's power demand hits record 7,572 MW amid rising heat

Delhi's power demand has surged to an unprecedented 7,572 megawatts (MW) in May, the highest ever recorded for the month, as rising temperatures drive increased usage of cooling appliances. The soaring heat has led to a significant spike in electricity consumption, testing the limits of the city's power infrastructure.

This record demand was observed on May 21, surpassing the previous high of 7,409 MW recorded in June last year. The city's power distribution companies (discoms) have been working at full capacity to manage the heightened load and ensure uninterrupted supply. Measures such as optimising power distribution and maintaining adequate reserves have been crucial in preventing outages during this peak period.

Officials from the Delhi Electricity Regulatory Commission (DERC) and the city's discoms have been closely monitoring the situation, coordinating efforts to manage the demand-supply balance effectively. The discoms have also advised consumers to adopt energy-saving practices, such as using energy-efficient appliances and avoiding unnecessary use of high-power devices during peak hours.

The unprecedented rise in power demand highlights the need for robust infrastructure and efficient energy management. Investments in modernising the power grid and expanding renewable energy sources are essential to handle such peaks in the future. Additionally, increasing public awareness about energy conservation can play a vital role in mitigating the impact of extreme weather conditions on the power supply.

As Delhi continues to experience high temperatures, the power sector remains on high alert, striving to maintain stability and meet the energy needs of its residents.

Delhi's power demand has surged to an unprecedented 7,572 megawatts (MW) in May, the highest ever recorded for the month, as rising temperatures drive increased usage of cooling appliances. The soaring heat has led to a significant spike in electricity consumption, testing the limits of the city's power infrastructure. This record demand was observed on May 21, surpassing the previous high of 7,409 MW recorded in June last year. The city's power distribution companies (discoms) have been working at full capacity to manage the heightened load and ensure uninterrupted supply. Measures such as optimising power distribution and maintaining adequate reserves have been crucial in preventing outages during this peak period. Officials from the Delhi Electricity Regulatory Commission (DERC) and the city's discoms have been closely monitoring the situation, coordinating efforts to manage the demand-supply balance effectively. The discoms have also advised consumers to adopt energy-saving practices, such as using energy-efficient appliances and avoiding unnecessary use of high-power devices during peak hours. The unprecedented rise in power demand highlights the need for robust infrastructure and efficient energy management. Investments in modernising the power grid and expanding renewable energy sources are essential to handle such peaks in the future. Additionally, increasing public awareness about energy conservation can play a vital role in mitigating the impact of extreme weather conditions on the power supply. As Delhi continues to experience high temperatures, the power sector remains on high alert, striving to maintain stability and meet the energy needs of its residents.

Next Story
Infrastructure Urban

Breathing Room!

Hidden in plain sight, the Malabar Hill Forest Trail Project is a transformative initiative that brings together citizen-led vision, architectural sensitivity and sustainable construction to reclaim a forest stretch in the heart of Mumbai – without disturbing a single tree.Inaugurated on March 30, 2025, by Maharashtra Minister Mangal Prabhat Lodha, the project is the result of a unique collaboration between the Nepean Sea Road Citizens' Forum (NRCF), IMK Architects, the JSW Foundation, and the Brihanmumbai Municipal Corporation (BMC). This collaboration between citizens, architects, civic au..

Next Story
Technology

Constructive Automation

On most construction sites, the rhythm of progress is measured by the clang of steel, the hum of machinery and the sweat of thousands. But increasingly, new sounds are entering the mix: the quiet efficiency of algorithms, the hum of drones overhead, and the precision of robotic arms at work. Behind the concrete and cables, an invisible force is taking hold: data. It is turning blueprints into living simulations, managing fleets of machines, and helping engineers make decisions before a single brick is laid. This is not the construction of tomorrow; it is the architecture of today – built on ..

Next Story
Real Estate

Google India’s New Campus

India continues to cement its position as a global digital powerhouse – and Google’s latest milestone reinforces this trajectory with the inauguration of Ananta, one of its largest offices worldwide. CW explores the design, sustainability and construction aspects of this landmark campus in Bengaluru.Significance of AnantaLocated in Mahadevapura, Bengaluru, Ananta spans 1.6 million sq ft and is situated within Bagmane Tech Park. Named after the Sanskrit word for ‘infinite’, this state-of-the-art, 11-storey facility is Google’s fourth office in Bengaluru. It is designed to foster colla..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?