+
Envision bags wind energy project from Serentica
POWER & RENEWABLE ENERGY

Envision bags wind energy project from Serentica

Renewable energy solutions provider Envision Energy has bagged a 350-MW wind energy project from Serentica Renewables. “Envision will supply a total of 106 nos. EN156/3.3 MW Wind Turbine Generators (WTGs) to Serentica's wind park. Once commissioned, it will produce 1.25 billion units of clean energy and avoid the emission of 1.06 million ton of CO2 annually.

The project, to be set up in Maharashtra, is scheduled for commissioning by December 2024.

In the statement, RPV Prasad, CEO, Envision Wind Power Technologies India, said, "We are delighted to partner with Serentica Renewables in building this prestigious wind power in Maharashtra. Nacelles and hubs for the wind turbines will be assembled at Pune, blades at the plants located at Trichy or Bengaluru and towers sourced from manufacturers based in Maharashtra."

Akshay Hiranandani, CEO, Serentica Renewables, said, "This project is a critical step in fast-tracking our industrial decarbonisation efforts and a major investment in the future of our planet and our economy."

Renewable energy solutions provider Envision Energy has bagged a 350-MW wind energy project from Serentica Renewables. “Envision will supply a total of 106 nos. EN156/3.3 MW Wind Turbine Generators (WTGs) to Serentica's wind park. Once commissioned, it will produce 1.25 billion units of clean energy and avoid the emission of 1.06 million ton of CO2 annually.The project, to be set up in Maharashtra, is scheduled for commissioning by December 2024.In the statement, RPV Prasad, CEO, Envision Wind Power Technologies India, said, We are delighted to partner with Serentica Renewables in building this prestigious wind power in Maharashtra. Nacelles and hubs for the wind turbines will be assembled at Pune, blades at the plants located at Trichy or Bengaluru and towers sourced from manufacturers based in Maharashtra.Akshay Hiranandani, CEO, Serentica Renewables, said, This project is a critical step in fast-tracking our industrial decarbonisation efforts and a major investment in the future of our planet and our economy.

Next Story
Equipment

Liebherr secures 130-dozer deal with Turkey’s State Hydraulic Works

Liebherr Turkey has signed a major equipment supply agreement with the Turkish State Hydraulic Works (DSİ) for the delivery of 130 crawler tractors to be used across the country’s key infrastructure and environmental projects.The agreement covers 120 PR 756 Litronic and 10 PR 736 Litronic crawler tractors, with production scheduled at Liebherr’s facility in Telfs, Austria. This marks a significant continuation of the long-standing collaboration between DSİ and Liebherr, which began over a decade ago with the delivery of PR 754 Litronic dozers.Designed for heavy-duty operations, the PR 75..

Next Story
Infrastructure Transport

Noida to Revamp Transport Nagar Chowk with Rs 4-Crore Beautification Plan

The Noida Authority has unveiled plans to redevelop Transport Nagar Chowk in Sector 67 with a Rs 4-crore beautification project. Aimed at enhancing connectivity, accessibility, and urban aesthetics, the project will upgrade a 500-metre stretch along DSC Road with modern, inclusive, and sustainable infrastructure.Officials stated that the stretch will be enhanced with ornamental lighting, sculptures, seating areas, bollards, food kiosks, and ramps for differently-abled individuals. A tender for the project is expected to be issued soon.Neelima Rana, partner at Orionn Architects—the firm behin..

Next Story
Infrastructure Transport

Centre Approves Noida Metro Extension to Bodaki Multimodal Hub

The Central government has approved the extension of the Noida Metro Aqua Line from Depot Station to the upcoming Multimodal Transport Hub (MMTH) at Bodaki, marking a major push for enhanced connectivity in the National Capital Region (NCR). The 2.6-km extension is expected to be completed within three years.The project, already cleared by the Uttar Pradesh Cabinet, will now move to the construction stage under the supervision of the Noida Metro Rail Corporation (NMRC). The extended route will include two additional stations — Junpat Village and Bodaki — connecting to the MMTH, which will ..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?