+
Gujarat Energy Seeks Bids for 10 MW Solar PV Project
POWER & RENEWABLE ENERGY

Gujarat Energy Seeks Bids for 10 MW Solar PV Project

Gujarat Energy, operating under the Energy and Petrochemicals Department of the Government of Gujarat, has invited bids for a 10 MW AC grid-connected solar photovoltaic (PV) power plant for captive consumption in the state. The tender seeks an Engineering, Procurement and Construction (EPC) contractor under Tender ID 342606.

The selected contractor will undertake the project’s site survey, design, engineering, procurement, supply, installation, erection, construction and commissioning. The scope also requires the contractor to arrange suitable land on lease for 27 years and operate and maintain the solar plant for 10 years after commissioning.

Tender documents became available for download on September 7, 2026, at 4:45 PM IST. Bidders can submit queries in the prescribed format until September 17, while the deadline for downloading documents and submitting bids online is September 28 at 6:30 PM IST. Bids must remain valid for 180 days from the submission date.

The evaluation process is scheduled to begin shortly after the submission deadline. Preliminary evaluation will start at 6:31 PM on September 28, followed by technical bid evaluation at 6:35 PM and opening of the commercial stage at 6:37 PM. The process will assess preliminary compliance, technical qualification and commercial terms.

Gujarat Energy has set a non-refundable bidding processing fee of Rs. 5,900, including GST, and requires an Earnest Money Deposit or bid security of Rs. 6 mn. Where the deposit is submitted through a bank guarantee, the original document must be delivered to the Vice President–Materials at Gujarat Gas in Infocity, Gandhinagar.

Bidding will be conducted exclusively through the nProcure platform, and participants must hold a valid Class-III Digital Signature Certificate. Technical submissions must include Chartered Accountant certificates with UDIN, along with turnover, net worth and audited financial statements for FY24, FY25 and FY26. Performance Bank Guarantee requirements will follow the detailed tender conditions.

Gujarat Energy, operating under the Energy and Petrochemicals Department of the Government of Gujarat, has invited bids for a 10 MW AC grid-connected solar photovoltaic (PV) power plant for captive consumption in the state. The tender seeks an Engineering, Procurement and Construction (EPC) contractor under Tender ID 342606. The selected contractor will undertake the project’s site survey, design, engineering, procurement, supply, installation, erection, construction and commissioning. The scope also requires the contractor to arrange suitable land on lease for 27 years and operate and maintain the solar plant for 10 years after commissioning. Tender documents became available for download on September 7, 2026, at 4:45 PM IST. Bidders can submit queries in the prescribed format until September 17, while the deadline for downloading documents and submitting bids online is September 28 at 6:30 PM IST. Bids must remain valid for 180 days from the submission date. The evaluation process is scheduled to begin shortly after the submission deadline. Preliminary evaluation will start at 6:31 PM on September 28, followed by technical bid evaluation at 6:35 PM and opening of the commercial stage at 6:37 PM. The process will assess preliminary compliance, technical qualification and commercial terms. Gujarat Energy has set a non-refundable bidding processing fee of Rs. 5,900, including GST, and requires an Earnest Money Deposit or bid security of Rs. 6 mn. Where the deposit is submitted through a bank guarantee, the original document must be delivered to the Vice President–Materials at Gujarat Gas in Infocity, Gandhinagar. Bidding will be conducted exclusively through the nProcure platform, and participants must hold a valid Class-III Digital Signature Certificate. Technical submissions must include Chartered Accountant certificates with UDIN, along with turnover, net worth and audited financial statements for FY24, FY25 and FY26. Performance Bank Guarantee requirements will follow the detailed tender conditions.

Related Stories

Gold Stories

Next Story
Real Estate

BMC OC Amnesty Scheme Requires Key Approvals from Mumbai Societies

The Brihanmumbai Municipal Corporation (BMC) has clarified that housing societies applying under its Occupation Certificate (OC) amnesty scheme must possess key approvals linked to the original construction. The requirements include a valid Intimation of Disapproval (IOD), an approved building plan and a Commencement Certificate (CC), along with a No Objection Certificate (NOC) from the developer or original construction applicant. The Standard Operating Procedure (SOP) makes clear that the absence of an OC alone will not qualify a building for relief. Societies must establish that their build..

Next Story
Real Estate

Gurugram Emerges as Luxury Senior Living Hub

Gurugram is emerging as a potential hub for luxury senior living, supported by available land, healthcare infrastructure, connectivity and a concentration of affluent professionals, high-net-worth individuals and non-resident Indians. These factors could give the city an advantage over land-constrained metros such as Mumbai. A report by the Association of Senior Living India (ASLI) and JLL estimates that India’s organised senior living market could represent a $10.1 bn opportunity by 2030. The sector had about 25,050 organised units as of June 2026, while penetration stood at only 1.5 per ce..

Next Story
Real Estate

Corrosion Costs India’s Infrastructure Rs. 142 bn Annually

Corrosion costs India an estimated Rs. 1.42 tn annually, equivalent to 4.3 per cent of gross domestic product, according to a report by the Confederation of Indian Industry and the National Research Institute. Infrastructure accounts for Rs. 142 bn of the annual burden, making it the sector with the largest absolute cost among those examined. The report, presented at the CII Annual Infrastructure Summit 2026, said the infrastructure-sector cost equals about 2.9 per cent of the sector’s gross domestic product. It estimated that effective measures could generate maximum savings of Rs. 495.8 bn..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code