+
Kolkata-based Atha Group plans to sell its 365 MW energy assets
POWER & RENEWABLE ENERGY

Kolkata-based Atha Group plans to sell its 365 MW energy assets

Atha Group is leaving their clean energy business by selling 365 MW assets, which are spread over seven states. The deal is estimated to value the assets at an industry price of Rs 2,000 crore.

Avendus Capital is the legal advisor on Atha Group's sale procedure. Leading players like Ayana Power, Edelweiss Infrastructure, O2 Power received feelers.

Atha Group has 200 MW assets in Tamil Nadu, 50 MW in Maharashtra, 20 MW in Karnataka, 15 MW in Telangana, and remaining in Madhya Pradesh and Rajasthan. The bids are likely to be in by 25 of this month.

Atha Group firms in 2017, NVR Energy and Narbheram Vishram, won the bid to supply 200 MW of solar power to Tamil Nadu Generation and Distribution Corporation (TANGEDCO) out of the 2,000 MW capacity to be developed by TANGEDCO.

Besides renewable energy, Atha Group is 60 year old and is diversified into power & steel, iron-ore mining, and Calcined petroleum coke.

Many conventional power manufacturers are selling a huge portfolio of their assets in the previous years. Major purchasers are the marquee private equity funds-backed renewable platforms.

Since 2017, India has drawn investments of Rs 1.32 lakh crore in the renewable energy sector. Currently, the renewable energy capacity of India is around 95 GW, with 40.5 GW of solar power.

The renewable energy (RE) capacity of India is likely to grow from 10.5 GW to 11 GW in the FY 2021-22, following a strong project pipeline of around 38 GW.

It is estimated that the RE sector would see investments of Rs 3.5 trillion in the upcoming four years, increasing the share of RE capacity from 25% (March 2021) to 34% by March 2025, driven by the solar power sector.

Image Source


Also read: ReNew Power to buy 260 MW operational solar in Telangana

Also read: GSECL floats tender for 224 MW grid connected solar projects

Atha Group is leaving their clean energy business by selling 365 MW assets, which are spread over seven states. The deal is estimated to value the assets at an industry price of Rs 2,000 crore. Avendus Capital is the legal advisor on Atha Group's sale procedure. Leading players like Ayana Power, Edelweiss Infrastructure, O2 Power received feelers. Atha Group has 200 MW assets in Tamil Nadu, 50 MW in Maharashtra, 20 MW in Karnataka, 15 MW in Telangana, and remaining in Madhya Pradesh and Rajasthan. The bids are likely to be in by 25 of this month. Atha Group firms in 2017, NVR Energy and Narbheram Vishram, won the bid to supply 200 MW of solar power to Tamil Nadu Generation and Distribution Corporation (TANGEDCO) out of the 2,000 MW capacity to be developed by TANGEDCO. Besides renewable energy, Atha Group is 60 year old and is diversified into power & steel, iron-ore mining, and Calcined petroleum coke. Many conventional power manufacturers are selling a huge portfolio of their assets in the previous years. Major purchasers are the marquee private equity funds-backed renewable platforms. Since 2017, India has drawn investments of Rs 1.32 lakh crore in the renewable energy sector. Currently, the renewable energy capacity of India is around 95 GW, with 40.5 GW of solar power. The renewable energy (RE) capacity of India is likely to grow from 10.5 GW to 11 GW in the FY 2021-22, following a strong project pipeline of around 38 GW. It is estimated that the RE sector would see investments of Rs 3.5 trillion in the upcoming four years, increasing the share of RE capacity from 25% (March 2021) to 34% by March 2025, driven by the solar power sector. Image Source Also read: ReNew Power to buy 260 MW operational solar in Telangana Also read: GSECL floats tender for 224 MW grid connected solar projects

Related Stories

Gold Stories

Next Story
Infrastructure Transport

97 Per Cent Of Rongjeng-Mangsang-Adokgre Road Nears Completion

Deputy Chief Minister in-charge of public works Prestone Tynsong said in Shillong on 26 August that 97 per cent physical progress had been achieved on the ongoing Rongjeng-Mangsang-Adokgre road being constructed under the Non-Lapsable Central Pool of Resources (NLCPR). He noted the project was sanctioned in 2017 and that the stipulated time for completion had been 24 months from issue of the final work order. The deputy chief minister informed the assembly that the government had decided to include the remaining work under a World Bank project. In reply to a query from Rongjeng MLA Jim M Sangm..

Next Story
Infrastructure Transport

First TBM Starts Digging Five Point Three Kilometre Tunnel Under SGNP

The Goregaon-Mulund Link Road (GMLR) Phase three (B) project has reached a key milestone as the first tunnel boring machine (TBM) began excavation of the first of two tunnels beneath the Sanjay Gandhi National Park (SGNP). The machine, named Tulsi, started cutting a five point three kilometre bore that will link Dadasaheb Phalke Chitranagari in Goregaon East with Amar Nagar in Mulund West. Officials issued a statement noting the commencement of tunnelling work under the protected green belt. The twin tunnels are being constructed using mechanised tunnelling methods that aim to limit surface di..

Next Story
Infrastructure Transport

UP Approves Two Expressways And Rs 240 bn Infrastructure Push

The Uttar Pradesh Cabinet approved a series of infrastructure and industrial investment proposals totalling Rs 240 billion (Rs 240 bn), including two major expressway projects, a manufacturing and logistics cluster in Sultanpur and incentives for 11 industrial projects across the state. The decisions, taken at a meeting chaired by Chief Minister Yogi Adityanath, underline the state government’s focus on expanding road connectivity around emerging industrial hubs while attracting manufacturing investment to districts beyond major urban centres. The approvals cover both greenfield expressway c..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code