L&T wins orders from Vedanta for its hydrocarbon business
POWER & RENEWABLE ENERGY

L&T wins orders from Vedanta for its hydrocarbon business

The Hydrocarbon Business (L&T Energy Hydrocarbon – LTEH) of L&T has secured two prestigious orders for its Asset Management and AdVENT business verticals.

Larsen & Toubro Energy Hydrocarbon - Asset Management (LTEH-AM), a new business vertical for Operations and Maintenance (O&M) and associated services in the global market, has secured its first integrated O&M contract from Vedanta, Cairn Oil & Gas division. This 5-year contract is for Integrated O&M of Upstream Oil & Gas Processing Facility at Raageshwari Gas Terminal and associated Gas Well Pads and South Satellite Fields, located in Rajasthan, India.

Further, the AdVENT business vertical has received an order for Engineering, Procurement and Construction (EPC) of a Hydrogen Generation Unit (HGU) from Matheson Tri Gas, Inc. (Matheson), a subsidiary of Nippon Sanso Holdings Corporation (NSHD). Matheson’s Global HYCO business group secured the order for this HGU from Numaligarh refinery in Assam, on a “Build – Own – Operate (BOO)” basis for 20 years with Topsoe, Denmark as the overall process licensor for the unit.

The HGU with a capacity of 95 KTPA (132 kNm3/hr), is an integral part of the Numaligarh Refinery Expansion Project (NREP), to expand the current refining capacity from 3 to 9 MMTPA. The EPC work of the project will be executed by L&T, under a stringent timeline of 30 months.

“These orders reaffirm L&T’s execution prowess across the hydrocarbon value chain and leadership as a one-stop solution provider which is translating into growing partnerships with global oil & gas majors. These will go a long way in growing the Indian energy sector and reduce our dependence on imports” said Mr Subramanian Sarma, Whole-time Director & Sr. Executive Vice President (Energy) – L&T.

Also Read
ONGC to drill seven development wells in Bengal
NTPC crosses 1 GW annual capacity mark in RE segment

The Hydrocarbon Business (L&T Energy Hydrocarbon – LTEH) of L&T has secured two prestigious orders for its Asset Management and AdVENT business verticals. Larsen & Toubro Energy Hydrocarbon - Asset Management (LTEH-AM), a new business vertical for Operations and Maintenance (O&M) and associated services in the global market, has secured its first integrated O&M contract from Vedanta, Cairn Oil & Gas division. This 5-year contract is for Integrated O&M of Upstream Oil & Gas Processing Facility at Raageshwari Gas Terminal and associated Gas Well Pads and South Satellite Fields, located in Rajasthan, India. Further, the AdVENT business vertical has received an order for Engineering, Procurement and Construction (EPC) of a Hydrogen Generation Unit (HGU) from Matheson Tri Gas, Inc. (Matheson), a subsidiary of Nippon Sanso Holdings Corporation (NSHD). Matheson’s Global HYCO business group secured the order for this HGU from Numaligarh refinery in Assam, on a “Build – Own – Operate (BOO)” basis for 20 years with Topsoe, Denmark as the overall process licensor for the unit. The HGU with a capacity of 95 KTPA (132 kNm3/hr), is an integral part of the Numaligarh Refinery Expansion Project (NREP), to expand the current refining capacity from 3 to 9 MMTPA. The EPC work of the project will be executed by L&T, under a stringent timeline of 30 months. “These orders reaffirm L&T’s execution prowess across the hydrocarbon value chain and leadership as a one-stop solution provider which is translating into growing partnerships with global oil & gas majors. These will go a long way in growing the Indian energy sector and reduce our dependence on imports” said Mr Subramanian Sarma, Whole-time Director & Sr. Executive Vice President (Energy) – L&T. Also Read ONGC to drill seven development wells in Bengal NTPC crosses 1 GW annual capacity mark in RE segment

Next Story
Technology

AI-Enabled Workflows Lift Profitability and Productivity

Organisations modernising frontline workflows with artificial intelligence, automation and real-time data are reporting stronger financial performance, higher productivity and improved employee engagement, according to a global study by Zebra Technologies and Oxford Economics.The research covered 1,000 senior leaders across retail, manufacturing, transportation and logistics in the US, Mexico, the UK, Germany, India, Japan, Australia and New Zealand.In transportation and logistics, 54 per cent of companies that improved picking and packing operations reported faster operational performance, wh..

Next Story
Real Estate

India Leads Global AI Readiness but Implementation Lags

Indian companies lead global averages across all eight artificial intelligence readiness indicators tracked by JLL, but only 19 per cent have started making changes to their workplaces, according to the JLL 2026 Future of Work Survey.The study found that 77 per cent of Indian business leaders expect AI to change their office requirements, creating a 58-percentage-point gap between awareness and implementation. The survey covered more than 2,200 CEOs, CFOs and real estate leaders across 21 countries during the first quarter of 2026.Despite concerns over automation, 58 per cent of Indian leaders..

Next Story
Equipment

Three WOLFF Cranes Build Riyadh Cable-Stayed Bridges

Three WOLFF 180 B luffing jib cranes are supporting the construction of two cable-stayed bridges alongside the existing Wadi Laban Bridge in Riyadh, Saudi Arabia. The project is being developed for the Royal Commission for Riyadh City and executed by the ICRC joint venture comprising IC Ictas and Al Rashid Trading & Contracting Company.The cranes are handling lifting operations including formwork, reinforcement, concrete placement, work platforms, surveying equipment and other construction materials. Each crane is fitted with a 40 m jib, reaches a hook height of 157 m and offers a maximum ..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement