L&T wins orders from Vedanta for its hydrocarbon business
POWER & RENEWABLE ENERGY

L&T wins orders from Vedanta for its hydrocarbon business

The Hydrocarbon Business (L&T Energy Hydrocarbon – LTEH) of L&T has secured two prestigious orders for its Asset Management and AdVENT business verticals.

Larsen & Toubro Energy Hydrocarbon - Asset Management (LTEH-AM), a new business vertical for Operations and Maintenance (O&M) and associated services in the global market, has secured its first integrated O&M contract from Vedanta, Cairn Oil & Gas division. This 5-year contract is for Integrated O&M of Upstream Oil & Gas Processing Facility at Raageshwari Gas Terminal and associated Gas Well Pads and South Satellite Fields, located in Rajasthan, India.

Further, the AdVENT business vertical has received an order for Engineering, Procurement and Construction (EPC) of a Hydrogen Generation Unit (HGU) from Matheson Tri Gas, Inc. (Matheson), a subsidiary of Nippon Sanso Holdings Corporation (NSHD). Matheson’s Global HYCO business group secured the order for this HGU from Numaligarh refinery in Assam, on a “Build – Own – Operate (BOO)” basis for 20 years with Topsoe, Denmark as the overall process licensor for the unit.

The HGU with a capacity of 95 KTPA (132 kNm3/hr), is an integral part of the Numaligarh Refinery Expansion Project (NREP), to expand the current refining capacity from 3 to 9 MMTPA. The EPC work of the project will be executed by L&T, under a stringent timeline of 30 months.

“These orders reaffirm L&T’s execution prowess across the hydrocarbon value chain and leadership as a one-stop solution provider which is translating into growing partnerships with global oil & gas majors. These will go a long way in growing the Indian energy sector and reduce our dependence on imports” said Mr Subramanian Sarma, Whole-time Director & Sr. Executive Vice President (Energy) – L&T.

Also Read
ONGC to drill seven development wells in Bengal
NTPC crosses 1 GW annual capacity mark in RE segment

The Hydrocarbon Business (L&T Energy Hydrocarbon – LTEH) of L&T has secured two prestigious orders for its Asset Management and AdVENT business verticals. Larsen & Toubro Energy Hydrocarbon - Asset Management (LTEH-AM), a new business vertical for Operations and Maintenance (O&M) and associated services in the global market, has secured its first integrated O&M contract from Vedanta, Cairn Oil & Gas division. This 5-year contract is for Integrated O&M of Upstream Oil & Gas Processing Facility at Raageshwari Gas Terminal and associated Gas Well Pads and South Satellite Fields, located in Rajasthan, India. Further, the AdVENT business vertical has received an order for Engineering, Procurement and Construction (EPC) of a Hydrogen Generation Unit (HGU) from Matheson Tri Gas, Inc. (Matheson), a subsidiary of Nippon Sanso Holdings Corporation (NSHD). Matheson’s Global HYCO business group secured the order for this HGU from Numaligarh refinery in Assam, on a “Build – Own – Operate (BOO)” basis for 20 years with Topsoe, Denmark as the overall process licensor for the unit. The HGU with a capacity of 95 KTPA (132 kNm3/hr), is an integral part of the Numaligarh Refinery Expansion Project (NREP), to expand the current refining capacity from 3 to 9 MMTPA. The EPC work of the project will be executed by L&T, under a stringent timeline of 30 months. “These orders reaffirm L&T’s execution prowess across the hydrocarbon value chain and leadership as a one-stop solution provider which is translating into growing partnerships with global oil & gas majors. These will go a long way in growing the Indian energy sector and reduce our dependence on imports” said Mr Subramanian Sarma, Whole-time Director & Sr. Executive Vice President (Energy) – L&T. Also Read ONGC to drill seven development wells in Bengal NTPC crosses 1 GW annual capacity mark in RE segment

Related Stories

Gold Stories

Next Story
Resources

Schindler named among Forbes’ World’s Best Employers 2026

Schindler has been named among Forbes’ World’s Best Employers 2026, a global ranking recognising companies for their workplace environments.Compiled by Forbes in partnership with Statista, the ranking is based on independent employee feedback, including whether employees would recommend their organisation to friends and family.The company said the recognition reflected its focus on creating a workplace where employees can develop their expertise and build careers. ..

Next Story
Infrastructure Urban

India needs an export-execution mindset: Vishesh Jain

Interview with Vishesh Jain, Founder & CEO, EximpleWhat gaps in India’s global trade ecosystem led you to build Eximple, and what problem did you see businesses struggling with most?Eximple came out of a problem that all three founders had seen from different choke points in the trade ecosystem. India has millions of MSMEs and manufacturers, and many of them can make products that are genuinely competitive on quality. Yet only a small fraction is able to build meaningful international businesses. In our experience, the gap is usually not manufacturing capability; it is the ability to exe..

Next Story
Building Material

Nuvoco reports 13.5% revenue growth in Q2 FY27

Nuvoco Vistas Corp. Ltd. reported consolidated revenue of Rs 27.9 billion for Q2 FY27, up 13.5% year on year. Cement sales volume rose 9% to 4.7 million tonnes (MMT), while EBITDA increased 11% to Rs 4.11 billion.The company said it began its cement operations in 2014 with a 2.3 MMT per annum (MMTPA) operation at Nimbol. It now aims to reach 35 MMTPA of cement capacity by FY28, nearly 15 times its initial capacity. Its portfolio spans cement, ready-mix concrete and modern building materials.On sustainability and cost efficiency, Nuvoco partnered with CleanMax for a 46.4 MW wind-solar hybrid re..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code