Modi dedicates 220 kV Ladakh transmission line to the nation
POWER & RENEWABLE ENERGY

Modi dedicates 220 kV Ladakh transmission line to the nation

In order to ensure a quality power supply to Ladakh throughout the year, Prime Minister Narendra Modi has reportedly dedicated the 220 kV Srinagar-Alusteng-Drass-Kargil-Leh transmission system to the nation. Besides, enhancing the socio-economic development of the region, this initiative is expected to give a huge boost to the tourism sector as well.

The Rs 22.66-billion project is expected to minimise the massive use of diesel generating sets during winter. The transmission line is approximately 335 km-long and is built at a height of around 3,000-4,000 m. The line reportedly is snow covered for nearly six months, with a minimum temperature of -40o C at Drass. With Snow & Avalanche Study Establishment’s (SASE) assistance, special tower foundations were constructed.

Also, the four new state-of-the-art 220/66 kV gas insulated sub-stations built at Drass, Kargil, Khaltsi and Leh will help to ensure 24 x 7 quality power in all weather conditions. 95 per cent of the funding has been provided by the Government of India, while the remaining 5 per cent has been provided by the Jammu and Kashmir Government.

The project is aimed to supply quality of power supply and improve reliability to Ladakh region during harsh winters and evacuation of surplus power of Kargil and Leh Hydel stations of NHPC in summers. Thus boosting hospitality industry in the region.

Modi has laid the foundation stone of the project in 2014 and the project was completed by the Power Grid Corporation of India (POWERGRID), a Navratna company of the Government of India, under Ministry of Power, in four and half years.

In order to ensure a quality power supply to Ladakh throughout the year, Prime Minister Narendra Modi has reportedly dedicated the 220 kV Srinagar-Alusteng-Drass-Kargil-Leh transmission system to the nation. Besides, enhancing the socio-economic development of the region, this initiative is expected to give a huge boost to the tourism sector as well. The Rs 22.66-billion project is expected to minimise the massive use of diesel generating sets during winter. The transmission line is approximately 335 km-long and is built at a height of around 3,000-4,000 m. The line reportedly is snow covered for nearly six months, with a minimum temperature of -40o C at Drass. With Snow & Avalanche Study Establishment’s (SASE) assistance, special tower foundations were constructed. Also, the four new state-of-the-art 220/66 kV gas insulated sub-stations built at Drass, Kargil, Khaltsi and Leh will help to ensure 24 x 7 quality power in all weather conditions. 95 per cent of the funding has been provided by the Government of India, while the remaining 5 per cent has been provided by the Jammu and Kashmir Government. The project is aimed to supply quality of power supply and improve reliability to Ladakh region during harsh winters and evacuation of surplus power of Kargil and Leh Hydel stations of NHPC in summers. Thus boosting hospitality industry in the region. Modi has laid the foundation stone of the project in 2014 and the project was completed by the Power Grid Corporation of India (POWERGRID), a Navratna company of the Government of India, under Ministry of Power, in four and half years.

Next Story
Infrastructure Urban

ABS Marine Sees CRISIL Credit Rating Upgrade

ABS Marine Services has secured an upgrade to its long term and short term credit ratings from CRISIL, reflecting improved profitability and revenue growth through long term contracts. CRISIL moved the long term rating from BBB+/Stable to A-/Stable and revised the short term rating from A2 to A2+. The action signals strengthened financial metrics and operational resilience. The company benefited from durable client relationships with firms such as ONGC and Schlumberger. The rating decision followed stronger cash flows and an enlarged bank loan facility, which increased from Rs 3,705 million (m..

Next Story
Infrastructure Transport

Project BRAHMANK Marks 16 Years Of Strategic Roads In Arunachal

Project BRAHMANK is marking 16 years of work to establish strategic road and bridge links across Arunachal Pradesh, maintaining and developing 811 kilometres of roads and nearly 86 bridges that range from small culverts to large steel and arch bridges. These transport links are described as critical for ensuring year-round movement of defence personnel, equipment and essential supplies while improving everyday travel for people in remote villages. The project balances national security requirements with regional development by focusing on reliable access in challenging terrain. Notable enginee..

Next Story
Infrastructure Transport

Longleng CSOs Give One Week Ultimatum Over Two-Lane Highway

Civil society organisations (CSOs) in Longleng district have demanded immediate restoration of the deteriorating Changtongya–Longleng two-lane road and sought a detailed status report on the stalled construction within one week. The demand followed a consultative meeting convened under the Phom Peoples' Council (PPC) to discuss welfare and development concerns. PPC president YB Angam Phom said prolonged non-maintenance had caused hardship to commuters and affected transportation, local commerce and the district's development. The meeting urged authorities to undertake immediate restoration a..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement