Modi dedicates 220 kV Ladakh transmission line to the nation
POWER & RENEWABLE ENERGY

Modi dedicates 220 kV Ladakh transmission line to the nation

In order to ensure a quality power supply to Ladakh throughout the year, Prime Minister Narendra Modi has reportedly dedicated the 220 kV Srinagar-Alusteng-Drass-Kargil-Leh transmission system to the nation. Besides, enhancing the socio-economic development of the region, this initiative is expected to give a huge boost to the tourism sector as well.

The Rs 22.66-billion project is expected to minimise the massive use of diesel generating sets during winter. The transmission line is approximately 335 km-long and is built at a height of around 3,000-4,000 m. The line reportedly is snow covered for nearly six months, with a minimum temperature of -40o C at Drass. With Snow & Avalanche Study Establishment’s (SASE) assistance, special tower foundations were constructed.

Also, the four new state-of-the-art 220/66 kV gas insulated sub-stations built at Drass, Kargil, Khaltsi and Leh will help to ensure 24 x 7 quality power in all weather conditions. 95 per cent of the funding has been provided by the Government of India, while the remaining 5 per cent has been provided by the Jammu and Kashmir Government.

The project is aimed to supply quality of power supply and improve reliability to Ladakh region during harsh winters and evacuation of surplus power of Kargil and Leh Hydel stations of NHPC in summers. Thus boosting hospitality industry in the region.

Modi has laid the foundation stone of the project in 2014 and the project was completed by the Power Grid Corporation of India (POWERGRID), a Navratna company of the Government of India, under Ministry of Power, in four and half years.

In order to ensure a quality power supply to Ladakh throughout the year, Prime Minister Narendra Modi has reportedly dedicated the 220 kV Srinagar-Alusteng-Drass-Kargil-Leh transmission system to the nation. Besides, enhancing the socio-economic development of the region, this initiative is expected to give a huge boost to the tourism sector as well. The Rs 22.66-billion project is expected to minimise the massive use of diesel generating sets during winter. The transmission line is approximately 335 km-long and is built at a height of around 3,000-4,000 m. The line reportedly is snow covered for nearly six months, with a minimum temperature of -40o C at Drass. With Snow & Avalanche Study Establishment’s (SASE) assistance, special tower foundations were constructed. Also, the four new state-of-the-art 220/66 kV gas insulated sub-stations built at Drass, Kargil, Khaltsi and Leh will help to ensure 24 x 7 quality power in all weather conditions. 95 per cent of the funding has been provided by the Government of India, while the remaining 5 per cent has been provided by the Jammu and Kashmir Government. The project is aimed to supply quality of power supply and improve reliability to Ladakh region during harsh winters and evacuation of surplus power of Kargil and Leh Hydel stations of NHPC in summers. Thus boosting hospitality industry in the region. Modi has laid the foundation stone of the project in 2014 and the project was completed by the Power Grid Corporation of India (POWERGRID), a Navratna company of the Government of India, under Ministry of Power, in four and half years.

Next Story
Infrastructure Urban

Mount Invests Rs 250 Cr, Adds PUF & PEB Plants, 400+ Jobs

TUMKUR, Karnataka, January 8, 2025 - Mount Roofing & Structures Private Limited, one of India's  fastest-growing manufacturers in PUF and a leading solutions provider across Pre-Engineered Building  (PEB) and Polycarbonate sheets, simultaneously inaugurated its second fully automated continuous  Sandwich Panel manufacturing line and a new PEB manufacturing plant at its integrated campus in  Tumkur." The milestone expansion, part of a total investment of INR 250 crores, marks a significant  advancement in the company's commitment to engineered performance, manu..

Next Story
Infrastructure Urban

Titan Intech Strengthens UltraLED Push With Global LED Veteran

Titan Intech has announced the induction of global LED industry veteran Su Piow Ko to its Board of Directors, marking a strategic step in strengthening its UltraLED Displays roadmap and building globally competitive LED display solutions from India.The appointment aligns with Titan Intech’s ambition to position India as a hub for advanced, high-quality LED display manufacturing. With an increased focus on UltraLED Displays, the company aims to enhance technical governance, raise manufacturing standards and expand its presence across global markets.Su Piow Ko brings over three decades of inte..

Next Story
Infrastructure Urban

Dun & Bradstreet Flags New Growth Engines in India 2026 Outlook

Dun & Bradstreet has released its India 2026: D&B’s Perspective report, projecting a stable macroeconomic environment underpinned by fresh opportunities for productivity-led and inclusive growth. The report outlines how India’s next growth phase will be driven by digitised logistics, trusted data ecosystems, clean energy and rising city vitality.According to the outlook, India’s GDP growth is expected to reach around 6.6 per cent by FY2027, supported by resilient consumer demand and sustained public investment. Manufacturing is seen entering a new phase, moving beyond scale towar..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Open In App