+
Modi dedicates 220 kV Ladakh transmission line to the nation
POWER & RENEWABLE ENERGY

Modi dedicates 220 kV Ladakh transmission line to the nation

In order to ensure a quality power supply to Ladakh throughout the year, Prime Minister Narendra Modi has reportedly dedicated the 220 kV Srinagar-Alusteng-Drass-Kargil-Leh transmission system to the nation. Besides, enhancing the socio-economic development of the region, this initiative is expected to give a huge boost to the tourism sector as well.

The Rs 22.66-billion project is expected to minimise the massive use of diesel generating sets during winter. The transmission line is approximately 335 km-long and is built at a height of around 3,000-4,000 m. The line reportedly is snow covered for nearly six months, with a minimum temperature of -40o C at Drass. With Snow & Avalanche Study Establishment’s (SASE) assistance, special tower foundations were constructed.

Also, the four new state-of-the-art 220/66 kV gas insulated sub-stations built at Drass, Kargil, Khaltsi and Leh will help to ensure 24 x 7 quality power in all weather conditions. 95 per cent of the funding has been provided by the Government of India, while the remaining 5 per cent has been provided by the Jammu and Kashmir Government.

The project is aimed to supply quality of power supply and improve reliability to Ladakh region during harsh winters and evacuation of surplus power of Kargil and Leh Hydel stations of NHPC in summers. Thus boosting hospitality industry in the region.

Modi has laid the foundation stone of the project in 2014 and the project was completed by the Power Grid Corporation of India (POWERGRID), a Navratna company of the Government of India, under Ministry of Power, in four and half years.

In order to ensure a quality power supply to Ladakh throughout the year, Prime Minister Narendra Modi has reportedly dedicated the 220 kV Srinagar-Alusteng-Drass-Kargil-Leh transmission system to the nation. Besides, enhancing the socio-economic development of the region, this initiative is expected to give a huge boost to the tourism sector as well. The Rs 22.66-billion project is expected to minimise the massive use of diesel generating sets during winter. The transmission line is approximately 335 km-long and is built at a height of around 3,000-4,000 m. The line reportedly is snow covered for nearly six months, with a minimum temperature of -40o C at Drass. With Snow & Avalanche Study Establishment’s (SASE) assistance, special tower foundations were constructed. Also, the four new state-of-the-art 220/66 kV gas insulated sub-stations built at Drass, Kargil, Khaltsi and Leh will help to ensure 24 x 7 quality power in all weather conditions. 95 per cent of the funding has been provided by the Government of India, while the remaining 5 per cent has been provided by the Jammu and Kashmir Government. The project is aimed to supply quality of power supply and improve reliability to Ladakh region during harsh winters and evacuation of surplus power of Kargil and Leh Hydel stations of NHPC in summers. Thus boosting hospitality industry in the region. Modi has laid the foundation stone of the project in 2014 and the project was completed by the Power Grid Corporation of India (POWERGRID), a Navratna company of the Government of India, under Ministry of Power, in four and half years.

Related Stories

Gold Stories

Next Story
Infrastructure Transport

97 Per Cent Of Rongjeng-Mangsang-Adokgre Road Nears Completion

Deputy Chief Minister in-charge of public works Prestone Tynsong said in Shillong on 26 August that 97 per cent physical progress had been achieved on the ongoing Rongjeng-Mangsang-Adokgre road being constructed under the Non-Lapsable Central Pool of Resources (NLCPR). He noted the project was sanctioned in 2017 and that the stipulated time for completion had been 24 months from issue of the final work order. The deputy chief minister informed the assembly that the government had decided to include the remaining work under a World Bank project. In reply to a query from Rongjeng MLA Jim M Sangm..

Next Story
Infrastructure Transport

First TBM Starts Digging Five Point Three Kilometre Tunnel Under SGNP

The Goregaon-Mulund Link Road (GMLR) Phase three (B) project has reached a key milestone as the first tunnel boring machine (TBM) began excavation of the first of two tunnels beneath the Sanjay Gandhi National Park (SGNP). The machine, named Tulsi, started cutting a five point three kilometre bore that will link Dadasaheb Phalke Chitranagari in Goregaon East with Amar Nagar in Mulund West. Officials issued a statement noting the commencement of tunnelling work under the protected green belt. The twin tunnels are being constructed using mechanised tunnelling methods that aim to limit surface di..

Next Story
Infrastructure Transport

UP Approves Two Expressways And Rs 240 bn Infrastructure Push

The Uttar Pradesh Cabinet approved a series of infrastructure and industrial investment proposals totalling Rs 240 billion (Rs 240 bn), including two major expressway projects, a manufacturing and logistics cluster in Sultanpur and incentives for 11 industrial projects across the state. The decisions, taken at a meeting chaired by Chief Minister Yogi Adityanath, underline the state government’s focus on expanding road connectivity around emerging industrial hubs while attracting manufacturing investment to districts beyond major urban centres. The approvals cover both greenfield expressway c..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code