Oriana Power Lands $12M Solar Project
POWER & RENEWABLE ENERGY

Oriana Power Lands $12M Solar Project

Oriana Power, a renewable energy firm based in Noida, has secured a ₹1 billion ($12.08 million) contract for the turnkey engineering, procurement, and construction (EPC) of a 29 MW captive open-access solar project in Karnataka for a prominent steel manufacturer. The project is expected to be commissioned within five months and includes design, engineering, supply, installation, and one year of operation and maintenance services.

This achievement follows another contract worth ₹343.90 million ($4.14 million) for a 7 MWdc solar power project for a cement company in Rajasthan. Oriana Power has delivered over 100 MW of solar projects under both the Capital Expenditure (CAPEX) and Renewable Energy Service Company (RESCO) models.

In addition, the company recently won an auction to build a 20 MW ground-mounted solar photovoltaic power project in Dhanbad, Jharkhand, for Bharat Coking Coal, a Coal India subsidiary. Oriana Power has also been added to the Solar Energy Corporation of India's list of empanelled EPC contractors for 5.98 MW of grid-connected rooftop solar systems.

Karnataka, where the project is located, is a significant hub for solar open access, accounting for over 34% of cumulative solar open-access capacity in India as of H1 2023, according to the Mercom India Solar Open Access Market Report. This move toward renewable energy aligns with the Indian government's consideration of mandating the use of "green steel" in government projects as part of efforts to decarbonise the steel sector.

Oriana Power, a renewable energy firm based in Noida, has secured a ₹1 billion ($12.08 million) contract for the turnkey engineering, procurement, and construction (EPC) of a 29 MW captive open-access solar project in Karnataka for a prominent steel manufacturer. The project is expected to be commissioned within five months and includes design, engineering, supply, installation, and one year of operation and maintenance services.This achievement follows another contract worth ₹343.90 million ($4.14 million) for a 7 MWdc solar power project for a cement company in Rajasthan. Oriana Power has delivered over 100 MW of solar projects under both the Capital Expenditure (CAPEX) and Renewable Energy Service Company (RESCO) models.In addition, the company recently won an auction to build a 20 MW ground-mounted solar photovoltaic power project in Dhanbad, Jharkhand, for Bharat Coking Coal, a Coal India subsidiary. Oriana Power has also been added to the Solar Energy Corporation of India's list of empanelled EPC contractors for 5.98 MW of grid-connected rooftop solar systems.Karnataka, where the project is located, is a significant hub for solar open access, accounting for over 34% of cumulative solar open-access capacity in India as of H1 2023, according to the Mercom India Solar Open Access Market Report. This move toward renewable energy aligns with the Indian government's consideration of mandating the use of green steel in government projects as part of efforts to decarbonise the steel sector.

Next Story
Infrastructure Transport

Tripura Rail Survey Approved For Jirania–Bodhjung Link

The Ministry of Railways has approved a Final Location Survey (FLS) for a proposed new railway line between Jirania and Bodhjung Nagar in Tripura. The planned section will span 14 km and is estimated to cost around Rs 4.2 million, with the entire alignment located within West Tripura district. The approval marks a key step towards strengthening railway infrastructure and supporting industrial growth in the state. Bodhjung Nagar is Tripura’s principal industrial and commercial hub, developed mainly for resource-based industries such as rubber, bamboo and food processing. The proposed Jirania..

Next Story
Infrastructure Transport

MCF Raebareli Rolls Out Its 15,000th Passenger Coach

The Modern Coach Factory (MCF) in Raebareli, Uttar Pradesh, has reached a major production milestone with the manufacture of its 15,000th passenger coach on December 15, the Ministry of Railways said. During the current financial year 2025–26, the unit has produced a total of 1,310 coaches so far. Established in 2007 at Lalganj in Raebareli, MCF is among India’s most advanced passenger coach manufacturing facilities. Built at a cost of around Rs 31.92 billion, the factory has an installed annual capacity of 1,000 coaches and is located about 3 km from Lalganj on the Kanpur–Raebareli Roa..

Next Story
Infrastructure Transport

RVNL Wins Gandak River Rail Bridge Contract

Rail Vikas Nigam Limited (RVNL) has received a Letter of Award from North Eastern Railway for a major railway infrastructure project valued at Rs 1.65 billion. The contract relates to the construction of the substructure for a key railway bridge over the Gandak River. The bridge will be constructed between Paniyahwa and Valmikinagar stations as part of the doubling of the Gorakhpur Cantt–Valmikinagar railway section. Designed to enhance capacity and operational efficiency, the structure will comprise 14 spans of 61 metres each and will be supported by double D-type well foundations. The des..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Open In App