Powergrid Board To Consider Rs 350 Billion Borrowing For FY27 And FY28
POWER & RENEWABLE ENERGY

Powergrid Board To Consider Rs 350 Billion Borrowing For FY27 And FY28

Power Grid Corporation of India Limited (POWERGRID) will hold a board meeting on July 22, 2026, to consider borrowing proposals to support funding requirements and expansion plans disclosed in a regulatory filing to the National Stock Exchange and BSE Limited. The proposals were disclosed in a filing dated July 16, 2026 and relate to limits and specific borrowing programmes intended to fund the company’s capital expenditure pipeline. The meeting is a routine exercise to seek board direction ahead of any shareholder approvals.

One principal item is a proposal to raise the company’s borrowing limit for the financial year 2026-27 from Rs 300 billion (bn) to Rs 350 bn. The board will separately consider approving borrowings of up to Rs 350 bn for the financial year 2027-28 to align with projected funding needs. These figures reflect an increase in the sanctioned debt headroom intended to underwrite grid expansion and transmission projects.

The filing indicates that funds may be raised through multiple financing sources, including private placements of domestic bonds that could be issued as secured or unsecured instruments. Such instruments may be non-convertible, non-cumulative and redeemable and may vary between taxable and tax-free structures depending on market conditions. The precise mix and timing of instruments will be determined by the board and management in line with funding requirements and prevailing market dynamics.

Any decision of the board on the proposed borrowings will require shareholder approval at the forthcoming annual general meeting before implementation. The company has also informed exchanges that its trading window was closed on June 24, 2026 in accordance with insider trading regulations and will reopen 48 hours after the announcement of the financial results for the quarter ended June 30, 2026. The regulatory filing was signed by the company secretary and compliance officer and sets out the procedural steps to be followed.

Power Grid Corporation of India Limited (POWERGRID) will hold a board meeting on July 22, 2026, to consider borrowing proposals to support funding requirements and expansion plans disclosed in a regulatory filing to the National Stock Exchange and BSE Limited. The proposals were disclosed in a filing dated July 16, 2026 and relate to limits and specific borrowing programmes intended to fund the company’s capital expenditure pipeline. The meeting is a routine exercise to seek board direction ahead of any shareholder approvals. One principal item is a proposal to raise the company’s borrowing limit for the financial year 2026-27 from Rs 300 billion (bn) to Rs 350 bn. The board will separately consider approving borrowings of up to Rs 350 bn for the financial year 2027-28 to align with projected funding needs. These figures reflect an increase in the sanctioned debt headroom intended to underwrite grid expansion and transmission projects. The filing indicates that funds may be raised through multiple financing sources, including private placements of domestic bonds that could be issued as secured or unsecured instruments. Such instruments may be non-convertible, non-cumulative and redeemable and may vary between taxable and tax-free structures depending on market conditions. The precise mix and timing of instruments will be determined by the board and management in line with funding requirements and prevailing market dynamics. Any decision of the board on the proposed borrowings will require shareholder approval at the forthcoming annual general meeting before implementation. The company has also informed exchanges that its trading window was closed on June 24, 2026 in accordance with insider trading regulations and will reopen 48 hours after the announcement of the financial results for the quarter ended June 30, 2026. The regulatory filing was signed by the company secretary and compliance officer and sets out the procedural steps to be followed.

Related Stories

Gold Stories

Next Story
Resources

Schindler named among Forbes’ World’s Best Employers 2026

Schindler has been named among Forbes’ World’s Best Employers 2026, a global ranking recognising companies for their workplace environments.Compiled by Forbes in partnership with Statista, the ranking is based on independent employee feedback, including whether employees would recommend their organisation to friends and family.The company said the recognition reflected its focus on creating a workplace where employees can develop their expertise and build careers. ..

Next Story
Infrastructure Urban

India needs an export-execution mindset: Vishesh Jain

Interview with Vishesh Jain, Founder & CEO, EximpleWhat gaps in India’s global trade ecosystem led you to build Eximple, and what problem did you see businesses struggling with most?Eximple came out of a problem that all three founders had seen from different choke points in the trade ecosystem. India has millions of MSMEs and manufacturers, and many of them can make products that are genuinely competitive on quality. Yet only a small fraction is able to build meaningful international businesses. In our experience, the gap is usually not manufacturing capability; it is the ability to exe..

Next Story
Building Material

Nuvoco reports 13.5% revenue growth in Q2 FY27

Nuvoco Vistas Corp. Ltd. reported consolidated revenue of Rs 27.9 billion for Q2 FY27, up 13.5% year on year. Cement sales volume rose 9% to 4.7 million tonnes (MMT), while EBITDA increased 11% to Rs 4.11 billion.The company said it began its cement operations in 2014 with a 2.3 MMT per annum (MMTPA) operation at Nimbol. It now aims to reach 35 MMTPA of cement capacity by FY28, nearly 15 times its initial capacity. Its portfolio spans cement, ready-mix concrete and modern building materials.On sustainability and cost efficiency, Nuvoco partnered with CleanMax for a 46.4 MW wind-solar hybrid re..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code