REC signs MoU with PFC for FYs 2023-24 and 2024-25
POWER & RENEWABLE ENERGY

REC signs MoU with PFC for FYs 2023-24 and 2024-25

REC signed a Memorandum of Understanding (MoU) with PFC as per the DPE performance evaluation system for FYs 2023-24 and 2024-25 for CPSEs. Vivek Kumar Dewangan, CMD, REC signed the MoU for FYs 2023-24 and 2024-25 with Parminder Chopra, CMD, PFC, in the presence of directors and other senior officials from both REC and PFC. As per the MoU, REC is targeting revenue from operations of Rs 469.35 billion in FY 2023-24 and Rs 563.22 billion in FY 2024-25.

REC, a Maharatna CPSE, is an NBFC focussing on power sector financing and development across India. Established in 1969, REC has completed over 54 years in the area of its operations. It provides financial assistance to complete the power-sector value chain for various types of projects including generation, transmission and distribution and renewable energy. Recently, REC has also diversified into the non-power infrastructure and logistics sector to cover areas such as airports, metro, railways, ports, bridges, etc. PFC, a Maharatna CPSE, has a majority shareholding in REC. Both REC and PFC are under the administrative control of the Ministry of Power, Government of India.

REC signed a Memorandum of Understanding (MoU) with PFC as per the DPE performance evaluation system for FYs 2023-24 and 2024-25 for CPSEs. Vivek Kumar Dewangan, CMD, REC signed the MoU for FYs 2023-24 and 2024-25 with Parminder Chopra, CMD, PFC, in the presence of directors and other senior officials from both REC and PFC. As per the MoU, REC is targeting revenue from operations of Rs 469.35 billion in FY 2023-24 and Rs 563.22 billion in FY 2024-25.REC, a Maharatna CPSE, is an NBFC focussing on power sector financing and development across India. Established in 1969, REC has completed over 54 years in the area of its operations. It provides financial assistance to complete the power-sector value chain for various types of projects including generation, transmission and distribution and renewable energy. Recently, REC has also diversified into the non-power infrastructure and logistics sector to cover areas such as airports, metro, railways, ports, bridges, etc. PFC, a Maharatna CPSE, has a majority shareholding in REC. Both REC and PFC are under the administrative control of the Ministry of Power, Government of India.

Next Story
Infrastructure Urban

ABS Marine Sees CRISIL Credit Rating Upgrade

ABS Marine Services has secured an upgrade to its long term and short term credit ratings from CRISIL, reflecting improved profitability and revenue growth through long term contracts. CRISIL moved the long term rating from BBB+/Stable to A-/Stable and revised the short term rating from A2 to A2+. The action signals strengthened financial metrics and operational resilience. The company benefited from durable client relationships with firms such as ONGC and Schlumberger. The rating decision followed stronger cash flows and an enlarged bank loan facility, which increased from Rs 3,705 million (m..

Next Story
Infrastructure Transport

Project BRAHMANK Marks 16 Years Of Strategic Roads In Arunachal

Project BRAHMANK is marking 16 years of work to establish strategic road and bridge links across Arunachal Pradesh, maintaining and developing 811 kilometres of roads and nearly 86 bridges that range from small culverts to large steel and arch bridges. These transport links are described as critical for ensuring year-round movement of defence personnel, equipment and essential supplies while improving everyday travel for people in remote villages. The project balances national security requirements with regional development by focusing on reliable access in challenging terrain. Notable enginee..

Next Story
Infrastructure Transport

Longleng CSOs Give One Week Ultimatum Over Two-Lane Highway

Civil society organisations (CSOs) in Longleng district have demanded immediate restoration of the deteriorating Changtongya–Longleng two-lane road and sought a detailed status report on the stalled construction within one week. The demand followed a consultative meeting convened under the Phom Peoples' Council (PPC) to discuss welfare and development concerns. PPC president YB Angam Phom said prolonged non-maintenance had caused hardship to commuters and affected transportation, local commerce and the district's development. The meeting urged authorities to undertake immediate restoration a..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement