REC signs MoU with PFC for FYs 2023-24 and 2024-25
POWER & RENEWABLE ENERGY

REC signs MoU with PFC for FYs 2023-24 and 2024-25

REC signed a Memorandum of Understanding (MoU) with PFC as per the DPE performance evaluation system for FYs 2023-24 and 2024-25 for CPSEs. Vivek Kumar Dewangan, CMD, REC signed the MoU for FYs 2023-24 and 2024-25 with Parminder Chopra, CMD, PFC, in the presence of directors and other senior officials from both REC and PFC. As per the MoU, REC is targeting revenue from operations of Rs 469.35 billion in FY 2023-24 and Rs 563.22 billion in FY 2024-25.

REC, a Maharatna CPSE, is an NBFC focussing on power sector financing and development across India. Established in 1969, REC has completed over 54 years in the area of its operations. It provides financial assistance to complete the power-sector value chain for various types of projects including generation, transmission and distribution and renewable energy. Recently, REC has also diversified into the non-power infrastructure and logistics sector to cover areas such as airports, metro, railways, ports, bridges, etc. PFC, a Maharatna CPSE, has a majority shareholding in REC. Both REC and PFC are under the administrative control of the Ministry of Power, Government of India.

REC signed a Memorandum of Understanding (MoU) with PFC as per the DPE performance evaluation system for FYs 2023-24 and 2024-25 for CPSEs. Vivek Kumar Dewangan, CMD, REC signed the MoU for FYs 2023-24 and 2024-25 with Parminder Chopra, CMD, PFC, in the presence of directors and other senior officials from both REC and PFC. As per the MoU, REC is targeting revenue from operations of Rs 469.35 billion in FY 2023-24 and Rs 563.22 billion in FY 2024-25.REC, a Maharatna CPSE, is an NBFC focussing on power sector financing and development across India. Established in 1969, REC has completed over 54 years in the area of its operations. It provides financial assistance to complete the power-sector value chain for various types of projects including generation, transmission and distribution and renewable energy. Recently, REC has also diversified into the non-power infrastructure and logistics sector to cover areas such as airports, metro, railways, ports, bridges, etc. PFC, a Maharatna CPSE, has a majority shareholding in REC. Both REC and PFC are under the administrative control of the Ministry of Power, Government of India.

Next Story
Infrastructure Energy

J&K CM Rules Out Power Privatisation, Focuses on Sector Reform

Jammu and Kashmir Chief Minister Omar Abdullah has dismissed speculation regarding privatisation of electricity in the Union Territory, emphasising that his priority is to strengthen and reform the power sector.“We are not discussing privatisation. By reducing losses, improving billing efficiency, and enhancing revenue, there will be no need for it. My vision is to strengthen and reform the power sector in J&K,” Abdullah stated.He addressed the gathering at the 58th Engineers’ Day at SKICC on Monday evening, an event honouring Bharat Ratna Sir M Visvesvaraya for his pioneering contri..

Next Story
Infrastructure Urban

Mumbai’s Sassoon Dock to Get Tech-Driven Modernisation with Finland

The Maharashtra government, in collaboration with Finland, will modernise Mumbai’s historic Sassoon Dock using advanced technology, state minister Nitesh Rane announced on Wednesday.Rane met a delegation of Finnish officials and representatives of Finnish companies at the dock to discuss strategic plans for upgrading the facility in south Mumbai, according to an official statement.Built in the 19th century, Sassoon Dock is one of Mumbai’s oldest and busiest fishing harbours. Operations currently exceed its original capacity, raising concerns over hygiene, odour, fish handling standards, an..

Next Story
Infrastructure Energy

Agarwal Industrial Wins Rs 3.3 Billion IOCL Bitumen Tender

Agarwal Industrial Corporation rose 3.84 per cent to Rs 945.65 after announcing it had secured a prestigious tender from Indian Oil Corporation (IOCL) worth Rs 3.3 billion.In a regulatory filing during market hours, the company confirmed it had won the tender to supply Bulk Bitumen (VG-30 and VG-40 grades) to IOCL’s Kakinada locations.The firm quantity under the award totals around 60,500 tonnes across 11 parcels, while the optional quantity is approximately 33,000 tonnes across six parcels. This brings the total awarded quantity to roughly 93,500 tonnes. At current market prices, the firm o..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?