SWELECT Secures 150 MW Solar Orders
POWER & RENEWABLE ENERGY

SWELECT Secures 150 MW Solar Orders

SWELECT Energy Systems, a leading player in India’s renewable energy sector, has secured orders exceeding 150 MW for its high-efficiency TOPCon Bi-facial solar PV modules. These orders highlight the company’s technological leadership and strong market credibility.

SWELECT maintains a 100 per cent success rate in module testing, with every unit passing TÜV and accredited lab evaluations on the first attempt. Additionally, the modules, backed by third-party reinsurance, are undergoing Extended Reliability Testing (ERT) to ensure long-term performance.

In a major financial move, SWELECT has raised Rs 2.9 billion (bn) via Non-Convertible Debentures (NCDs) through a private placement with India Infradebt. Secured against a portion of its solar power assets, this transaction has unlocked Rs 2.6 bn in cash collateral, which will be reinvested to scale SWELECT’s IPP portfolio to 1 GW by 2026-27.

R. Chellappan, Managing Director, SWELECT Energy Systems, stated:

"Securing 150 MW of TOPCon module orders reaffirms our commitment to quality and innovation. Our 100 per cent testing success further strengthens our resolve to deliver top-tier solar solutions. The NCD funding positions us to accelerate expansion and contribute meaningfully to India’s clean energy future.

With strategic reinvestment and upcoming solar projects, SWELECT is set to play a key role in India’s renewable energy transition, setting benchmarks in the sector.

SWELECT Energy Systems, a leading player in India’s renewable energy sector, has secured orders exceeding 150 MW for its high-efficiency TOPCon Bi-facial solar PV modules. These orders highlight the company’s technological leadership and strong market credibility.SWELECT maintains a 100 per cent success rate in module testing, with every unit passing TÜV and accredited lab evaluations on the first attempt. Additionally, the modules, backed by third-party reinsurance, are undergoing Extended Reliability Testing (ERT) to ensure long-term performance.In a major financial move, SWELECT has raised Rs 2.9 billion (bn) via Non-Convertible Debentures (NCDs) through a private placement with India Infradebt. Secured against a portion of its solar power assets, this transaction has unlocked Rs 2.6 bn in cash collateral, which will be reinvested to scale SWELECT’s IPP portfolio to 1 GW by 2026-27.R. Chellappan, Managing Director, SWELECT Energy Systems, stated:Securing 150 MW of TOPCon module orders reaffirms our commitment to quality and innovation. Our 100 per cent testing success further strengthens our resolve to deliver top-tier solar solutions. The NCD funding positions us to accelerate expansion and contribute meaningfully to India’s clean energy future.With strategic reinvestment and upcoming solar projects, SWELECT is set to play a key role in India’s renewable energy transition, setting benchmarks in the sector.

Next Story
Resources

Jyoti Structures Launches Heat Safety Drive Across Sites

Jyoti Structures (JSL) has strengthened heat safety measures across its project sites and manufacturing facilities as temperatures rise across India. The company has implemented a Summer Safety Plan covering all transmission line projects to address risks related to heat stress, dehydration and worker fatigue.The initiative includes rescheduling work away from peak afternoon temperatures, provision of drinking water, ORS and lemon-salt solutions, and installation of rest shelters near work areas. Daily toolbox talks, worker health monitoring, first-aid preparedness, emergency transport arrange..

Next Story
Real Estate

MHADA Declares 82 Buildings Most Dangerous in Central and South Mumbai

The Maharashtra Housing and Area Development Authority (MHADA) has declared 82 buildings as most dangerous across Central and South Mumbai and has appealed to residents to vacate immediately. The list, prepared after structural assessments by the authority, identifies buildings judged to pose imminent risk to occupants and to passersby. Local civic bodies have been asked to coordinate evacuations and to make arrangements for temporary shelter and rehabilitation for displaced households. Officials said the authority prioritised buildings with visible structural distress, severe cracking, tiltin..

Next Story
Infrastructure Transport

Damage Reported At Halwara Airport Terminal After First Rains

Severe damage was reported at the terminal of Halwara Airport during the first major rain spell of the season, prompting immediate concern among aviation and local authorities. Images from the site showed water ingress and visible deterioration of the terminal interior, affecting passenger areas and ancillary services. The airport authority suspended certain operations temporarily to assess structural safety and ensure passenger wellbeing. Preliminary inspections have prioritised electrical systems and roof seals to prevent further water ingress. State aviation officials ordered a formal inqui..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement