SWELECT Secures 150 MW Solar Orders
POWER & RENEWABLE ENERGY

SWELECT Secures 150 MW Solar Orders

SWELECT Energy Systems, a leading player in India’s renewable energy sector, has secured orders exceeding 150 MW for its high-efficiency TOPCon Bi-facial solar PV modules. These orders highlight the company’s technological leadership and strong market credibility.

SWELECT maintains a 100 per cent success rate in module testing, with every unit passing TÜV and accredited lab evaluations on the first attempt. Additionally, the modules, backed by third-party reinsurance, are undergoing Extended Reliability Testing (ERT) to ensure long-term performance.

In a major financial move, SWELECT has raised Rs 2.9 billion (bn) via Non-Convertible Debentures (NCDs) through a private placement with India Infradebt. Secured against a portion of its solar power assets, this transaction has unlocked Rs 2.6 bn in cash collateral, which will be reinvested to scale SWELECT’s IPP portfolio to 1 GW by 2026-27.

R. Chellappan, Managing Director, SWELECT Energy Systems, stated:

"Securing 150 MW of TOPCon module orders reaffirms our commitment to quality and innovation. Our 100 per cent testing success further strengthens our resolve to deliver top-tier solar solutions. The NCD funding positions us to accelerate expansion and contribute meaningfully to India’s clean energy future.

With strategic reinvestment and upcoming solar projects, SWELECT is set to play a key role in India’s renewable energy transition, setting benchmarks in the sector.

SWELECT Energy Systems, a leading player in India’s renewable energy sector, has secured orders exceeding 150 MW for its high-efficiency TOPCon Bi-facial solar PV modules. These orders highlight the company’s technological leadership and strong market credibility.SWELECT maintains a 100 per cent success rate in module testing, with every unit passing TÜV and accredited lab evaluations on the first attempt. Additionally, the modules, backed by third-party reinsurance, are undergoing Extended Reliability Testing (ERT) to ensure long-term performance.In a major financial move, SWELECT has raised Rs 2.9 billion (bn) via Non-Convertible Debentures (NCDs) through a private placement with India Infradebt. Secured against a portion of its solar power assets, this transaction has unlocked Rs 2.6 bn in cash collateral, which will be reinvested to scale SWELECT’s IPP portfolio to 1 GW by 2026-27.R. Chellappan, Managing Director, SWELECT Energy Systems, stated:Securing 150 MW of TOPCon module orders reaffirms our commitment to quality and innovation. Our 100 per cent testing success further strengthens our resolve to deliver top-tier solar solutions. The NCD funding positions us to accelerate expansion and contribute meaningfully to India’s clean energy future.With strategic reinvestment and upcoming solar projects, SWELECT is set to play a key role in India’s renewable energy transition, setting benchmarks in the sector.

Next Story
Infrastructure Energy

J&K CM Rules Out Power Privatisation, Focuses on Sector Reform

Jammu and Kashmir Chief Minister Omar Abdullah has dismissed speculation regarding privatisation of electricity in the Union Territory, emphasising that his priority is to strengthen and reform the power sector.“We are not discussing privatisation. By reducing losses, improving billing efficiency, and enhancing revenue, there will be no need for it. My vision is to strengthen and reform the power sector in J&K,” Abdullah stated.He addressed the gathering at the 58th Engineers’ Day at SKICC on Monday evening, an event honouring Bharat Ratna Sir M Visvesvaraya for his pioneering contri..

Next Story
Infrastructure Urban

Mumbai’s Sassoon Dock to Get Tech-Driven Modernisation with Finland

The Maharashtra government, in collaboration with Finland, will modernise Mumbai’s historic Sassoon Dock using advanced technology, state minister Nitesh Rane announced on Wednesday.Rane met a delegation of Finnish officials and representatives of Finnish companies at the dock to discuss strategic plans for upgrading the facility in south Mumbai, according to an official statement.Built in the 19th century, Sassoon Dock is one of Mumbai’s oldest and busiest fishing harbours. Operations currently exceed its original capacity, raising concerns over hygiene, odour, fish handling standards, an..

Next Story
Infrastructure Energy

Agarwal Industrial Wins Rs 3.3 Billion IOCL Bitumen Tender

Agarwal Industrial Corporation rose 3.84 per cent to Rs 945.65 after announcing it had secured a prestigious tender from Indian Oil Corporation (IOCL) worth Rs 3.3 billion.In a regulatory filing during market hours, the company confirmed it had won the tender to supply Bulk Bitumen (VG-30 and VG-40 grades) to IOCL’s Kakinada locations.The firm quantity under the award totals around 60,500 tonnes across 11 parcels, while the optional quantity is approximately 33,000 tonnes across six parcels. This brings the total awarded quantity to roughly 93,500 tonnes. At current market prices, the firm o..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?