Tata Steel to Procure Round-the-Clock Renewable Power:TPREL
POWER & RENEWABLE ENERGY

Tata Steel to Procure Round-the-Clock Renewable Power:TPREL

A letter of award (LOA) has been given to Tata electricity Renewable Energy (IPREL), the company's renewable energy division, to install 966 MW of round-the-clock (RTC) solar-wind hybrid electricity for Tata Steel at a few Indian steel facilities.

The project, which will have 379 MW of solar electricity and 587 MW of wind power, will be online on June 1, 2025.

With Tata Steel contributing 26% of the project's equity, the RTC power purchase agreement will be carried out under the group captive sector.

According to a statement from the firm, TPREL will establish the project through its subsidiary TP Vardhaman Surya. The hybrid project will reduce annual carbon emissions by 2,389,160 tonnes and meet a sizable portion of Tata Steel's green energy needs in India.

The business withheld information about the RTC project's location and the Tata Steel units that will profit from it.

A letter of award (LOA) has been given to Tata electricity Renewable Energy (IPREL), the company's renewable energy division, to install 966 MW of round-the-clock (RTC) solar-wind hybrid electricity for Tata Steel at a few Indian steel facilities. The project, which will have 379 MW of solar electricity and 587 MW of wind power, will be online on June 1, 2025. With Tata Steel contributing 26% of the project's equity, the RTC power purchase agreement will be carried out under the group captive sector. According to a statement from the firm, TPREL will establish the project through its subsidiary TP Vardhaman Surya. The hybrid project will reduce annual carbon emissions by 2,389,160 tonnes and meet a sizable portion of Tata Steel's green energy needs in India. The business withheld information about the RTC project's location and the Tata Steel units that will profit from it.

Next Story
Infrastructure Transport

Kavach 4.0 Commissioned on Delhi–Mumbai and Delhi–Howrah

"Kavach version four has been commissioned on 1,452 route km, covering the high density Delhi–Mumbai and Delhi–Howrah corridors. The rollout included laying 8,570 km of optical fibre, installation of 1,100 telecom towers, deployment of trackside equipment over 6,776 RKm and establishment of 767 station data centres. Trackside implementation has been taken up on 24,427 RKm covering Golden Quadrilateral, Golden Diagonal and High Density Network sections. The programme aims to strengthen signalling and train protection on key routes.Kavach is an indigenously developed automatic train protecti..

Next Story
Infrastructure Transport

Railways Advance Kalyan–Murbad Line And Mumbai Capacity Expansion

"Indian Railways is advancing multiple rail infrastructure projects in Maharashtra, including the sanctioned Kalyan–Murbad new line and sizable investments under the Mumbai Urban Transport Project and the Mumbai–Ahmedabad High Speed Rail project. The Kalyan–Murbad 28 km new line has been sanctioned at Rs 8.36 billion (bn) on a 50:50 cost-sharing basis with the Government of Maharashtra and has been declared a Special Railway Project for land acquisition; proposals covering 214 hectares are at various stages of acquisition. Budgetary outlay for projects falling fully or partly in Maharash..

Next Story
Infrastructure Urban

Parliamentary Panel Flags Funding Gaps in Heavy Industries

"The Department-Related Parliamentary Standing Committee on Industry (Rajya Sabha) presented its 332nd report on the Demands for Grants 2026-27 of the Ministry of Heavy Industries (MHI). Figures converted from crore and lakh are expressed in million (mn). The Budget Estimates 2026-27 for the Ministry stand at Rs 79,399 mn against a projected requirement of Rs 94,843.2 mn, a shortfall of about 16 per cent, with revenue at Rs 79,370.8 mn and capital compressed to Rs 28.2 mn from Rs 5,020 mn.The committee flagged recurring BE-to-RE compression and declining revised estimate utilisation, and calle..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement