
Quartz Technology Paints
Read full article
CW Gold Benefits
- Weekly Industry Updates
- Industry Feature Stories
- Premium Newsletter Access
- Building Material Prices (weekly) + trends/analysis
- Best Stories from our sister publications - Indian Cement Review, Equipment India, Infrastructure Today
- Sector focused Research Reports
- Sector Wise Updates (infrastructure, cement, equipment & construction) + trend analysis
- Exclusive text & video interviews
- Digital Delivery
- Financial Data for publically listed companies + Analysis
- Preconceptual Projects in the pipeline PAN India

Vizag Metro Depots Need 100 Acres, Rs 8.9 Bn Land Spend
Visakhapatnam’s 46.23-kilometre Metro phase one will hinge on two purpose-built depots—one beside the Old Dairy Farm near VIMS, the other close to the Visakhapatnam Port Authority—each demanding 35–40 acres to house inspection lines, workshops, wash plants, stabling tracks and operating offices. Together the depots and ancillary works require almost 100 acres, for which land acquisition alone is projected to cost about Rs 8.9 billion.A social-impact assessment launched on 30 May 2025 under the RFCTLARR Act is gauging public benefit, alternative sites and food-security effects before th..

Kolkata Metro Cuts Emissions with Regenerative Braking Tech
Metro Railway Kolkata has equipped all new trains with a regenerative braking system that turns the traction motors into generators during deceleration. Instead of wasting kinetic energy as heat, each rake feeds electricity back into the grid. The city now runs 37 such rakes. In 2024-25 they returned about 10.8 million kilowatt-hours to the network, trimming the power bill by roughly Rs 82 million and avoiding an estimated 13 500 tonnes of CO₂. A study by the operator shows the technology can recapture 17–20 per cent of a train’s energy use, mirroring practices in London, Tokyo..

Kochi Metro Speeds Up Kakkanad Line Amid Monsoon Work Push
Kochi Metro, eight years on the rails, is racing to deliver its second-phase extension from Jawaharlal Nehru Stadium to Infopark via Kakkanad after Afcons Infrastructure took the contract in June 2024 with a 600-day target. Setbacks over road-widening and shifting overhead power lines have pushed completion to December 2026, yet Kochi Metro Rail Ltd (KMRL) says the timetable is now back on track thanks to round-the-clock piling even in the monsoon.To date, 552 piles—about 28 per cent of the viaduct requirement—are in place, while roughly 1.5 per cent of pile caps, 6 per cent of U-girders, ..