Vinyl Flooring
Tiles

Vinyl Flooring

Pergo releases its vinyl flooring collection with the launch of Vinyl Planks & Tiles, available in optimum and premium quality levels. The class-33 optimum range with glue down laying system is for commercial areas and class-32 premium range products have PerfectFold TM 3.0 installation system, for residential use. Formats available in Optimum range are: 1219 x 184 x 2.5 mm, 610 x 305 x 2.5 mm and Premium range are: 1225 x 178 x 5 mm, 1225 x 303 x 5 mm.

Contact: Pergo.
Tel: 085-9542 2264, 011-4143 5741.
E-mail: customercare.delhi@unilin.com
Website: www.pergo.com

Pergo releases its vinyl flooring collection with the launch of Vinyl Planks & Tiles, available in optimum and premium quality levels. The class-33 optimum range with glue down laying system is for commercial areas and class-32 premium range products have PerfectFold TM 3.0 installation system, for residential use. Formats available in Optimum range are: 1219 x 184 x 2.5 mm, 610 x 305 x 2.5 mm and Premium range are: 1225 x 178 x 5 mm, 1225 x 303 x 5 mm. Contact: Pergo. Tel: 085-9542 2264, 011-4143 5741. E-mail: customercare.delhi@unilin.com Website: www.pergo.com

Next Story
Infrastructure Energy

Rajesh Power Secures Rs 11.16B Orders for Gujarat Projects

Rajesh Power Services Limited (RPSL), a leading EPC contractor in the power transmission and distribution sector, has secured new orders worth Rs 11.16 billion from a mix of government and institutional clients, highlighting its strong operational capabilities and expanding footprint.The fresh contracts include a turnkey project covering the supply, installation, testing, and commissioning of 11/22kV HT underground cable and overhead MVCC networks in Gujarat, as well as the design, engineering, manufacturing, supply, erection, testing, and commissioning of 220/66kV GIS and AIS substations. Add..

Next Story
Infrastructure Energy

Delay Likely in NTPC Ramagundam PPA for 800 MW Telangana Unit

The signing of the Power Purchase Agreement (PPA) for the upcoming 800 MW unit of NTPC’s Ramagundam plant is expected to be delayed further, as Telangana’s State Government weighs cost implications. Although PPAs for 1,600 MW (2×800 MW) from the 4,000 MW project—promised under the Andhra Pradesh Reorganisation Act, 2014—have already been signed, the agreement for the third unit is pending. A draft has been submitted to NTPC, but the matter is now under review by the Central Electricity Authority following requests for amendments by central utilities.The delay stems from concerns raise..

Next Story
Infrastructure Energy

KSEB Cancels Contract Over Delays in Bhoothathankettu Hydro Project

The Kerala State Electricity Board (KSEB) has terminated its contract with a consortium of Indian and Chinese firms after prolonged delays in completing electromechanical works for the 24 megawatt (MW) Bhoothathankettu small hydroelectric project.The KSEB board approved the cancellation of all agreements, including a tripartite contract signed with Sree Saravana Engineering Bhavani Ltd. (SSEB), Tamil Nadu, and Hunan Zhaoyang Generation Equipment Company Ltd., China. The decision follows an extended dispute concerning the final consignment of equipment from China.Based on recommendations from t..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?