+
Alligator Automations Opens Rs 400 Million Plant to Triple Capacity
Equipment

Alligator Automations Opens Rs 400 Million Plant to Triple Capacity

Alligator Automations, a leader in end-of-line packaging and robotic automation, has inaugurated a new manufacturing plant in Pune with an investment of Rs 400 million. The facility is expected to triple the company’s overall production capacity and marks a major step toward its vision of building an Indian engineering organisation supplying world-class machines to global markets.

With an annual production capability of Rs 5–6 billion, the plant enables turnkey projects to be engineered, assembled, tested and dispatched from India to customers worldwide. It is positioned to reduce dependence on imported robotic systems and strengthen India’s contribution to global automation supply chains.

“This new plant is a major milestone in our journey to build an engineering company of global scale and global standards from India. We are committed to replacing imports, strengthening India’s manufacturing ecosystem, and delivering complex automation solutions that compete with the best in the world. With this expansion, we are not only enhancing our capacity but also reinforcing our belief that Indian engineering can lead on the global stage,” said Srinivas Choudhary, Founder & CEO, Alligator Automations.

The facility includes advanced fabrication lines, a powder-coating unit, automated storage systems with over 100 tons of capacity and a 100,000 sq ft assembly area. Six loading bays, five 7.5-ton cranes and a digital paperless workflow allow execution of 15–20 large projects simultaneously, including turnkey lines up to 80 metres. Integration of fabrication, coating, quality checks, stores and assembly is expected to reduce delivery timelines by around 20 per cent and improve production accuracy. The plant is also projected to increase exports by 30 per cent and create more than 400 jobs in India and 100 overseas over the next three years.

The expansion reinforces Alligator Automations’ position as India’s largest end-of-line packaging and robotic automation company and advances its mission to deliver world-class engineering from India to global markets.

Alligator Automations, a leader in end-of-line packaging and robotic automation, has inaugurated a new manufacturing plant in Pune with an investment of Rs 400 million. The facility is expected to triple the company’s overall production capacity and marks a major step toward its vision of building an Indian engineering organisation supplying world-class machines to global markets.With an annual production capability of Rs 5–6 billion, the plant enables turnkey projects to be engineered, assembled, tested and dispatched from India to customers worldwide. It is positioned to reduce dependence on imported robotic systems and strengthen India’s contribution to global automation supply chains.“This new plant is a major milestone in our journey to build an engineering company of global scale and global standards from India. We are committed to replacing imports, strengthening India’s manufacturing ecosystem, and delivering complex automation solutions that compete with the best in the world. With this expansion, we are not only enhancing our capacity but also reinforcing our belief that Indian engineering can lead on the global stage,” said Srinivas Choudhary, Founder & CEO, Alligator Automations.The facility includes advanced fabrication lines, a powder-coating unit, automated storage systems with over 100 tons of capacity and a 100,000 sq ft assembly area. Six loading bays, five 7.5-ton cranes and a digital paperless workflow allow execution of 15–20 large projects simultaneously, including turnkey lines up to 80 metres. Integration of fabrication, coating, quality checks, stores and assembly is expected to reduce delivery timelines by around 20 per cent and improve production accuracy. The plant is also projected to increase exports by 30 per cent and create more than 400 jobs in India and 100 overseas over the next three years.The expansion reinforces Alligator Automations’ position as India’s largest end-of-line packaging and robotic automation company and advances its mission to deliver world-class engineering from India to global markets.

Next Story
Infrastructure Transport

MMRDA Installs 325-Tonne Steel Spans on Mumbai Metro Line 4

The Mumbai Metropolitan Region Development Authority (MMRDA) has achieved a key construction milestone on Metro Line 4 with the successful installation of three large steel spans at Bhandup West during overnight operations.The spans, together weighing 325 metric tonnes, were launched using eight heavy-duty cranes and 12 multi-axle vehicles. The operation required precise engineering and meticulous planning to minimise disruption in the densely populated suburban area.Due to effective inter-agency coordination, the work—originally scheduled across four nights—was completed within just two n..

Next Story
Infrastructure Transport

CMRL Targets March 2027 Opening for Vadapalani–Panagal Park

Chennai Metro Rail Limited (CMRL) is progressing as scheduled to open the Vadapalani–Panagal Park section of Phase II’s Corridor 4 by March 2027. The 3.5 km underground stretch is part of the 26.1 km Corridor 4 connecting Lighthouse with Poonamallee Bypass.Construction activities are advancing steadily, with tunnelling works between Vadapalani and Panagal Park already completed. Track-laying operations are expected to commence shortly. At Panagal Park station, structural works have reached the concourse and platform levels, while excavation continues at the lowest level.CMRL is also consid..

Next Story
Infrastructure Transport

Maha-Metro Invites Pune Metro Civil Maintenance Bids

Maharashtra Metro Rail Corporation Limited (Maha-Metro) has invited bids for the annual civil maintenance contract of the Pune Metro Rail Project. The tender, bearing ID and number P1-O&M-20/2025, is scheduled to close on 23 February 2026, with a pre-bid meeting slated for 10 February 2026. The earnest money deposit (EMD) for the contract is Rs 3,50,500, and the duration of the contract is one year.The scope of work includes annual civil maintenance of 28 elevated and underground stations, 28.079 km of elevated viaduct including steel bridges, 12.15 km of tunnels, and two depots under the ..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Open In App